Plant Issue Tracking Application; Plant Status Daily - Oconee Information for 9/21/2009
ML110040439
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/21/2009
From:
NRC/RGN-II
To:
References
FOIA/PA-2011-0021
Download: ML110040439 (4)


Text

7: 41yPdify Plant Issue Page 1 of 3 cXA~~X ~(plant status daily enter dai archives Oconee Information for 09/21/2009 (Modify/Update) satf in Risk Significant

/ Emergent Activities:

f.http://r2.nrc.gov/webapps/pita/ModifYIssue.cfm?iid=

I 5070&sname=Oconee 11/4/2010


Vqdify Plant Issue Page 2 of 3>1 I~1*~1 Ii Work on the ASW piping replacement. .was impactedby the'severe weather this weekend (heavy rain). Little additional excavationwas-performed; however,'the three pipes through the outer wall in the SSF were installed.

All of'the piping is in-place inside of the building ,and final fit-up and welding* i¸will take place over the next two days,, Eric,,Michel has provided the RI I s 'with several codes that apply planned tie-in work this week regarding the coating of pipes and protection of the buried sections This will be discussed with the projecti'leaads ndisetdin he fiieid I (Atached phot shows the new piping coming through the SSF outer wall- penttions ehave bee sealed to prevent water intrusion) 9:15 tg. c Yes 07 No delete A$W Pipingj Lhru 3SF walIljpq add attachment Findings and Observations:

Resident Issue Summary:== = =We are drafting up the following issues,.for this inspection report (2009-004) and should have files in for review shortly: Outside of Scope 7 4) 10CFR50.65(a)

(4) issue: Tied to the. removal of the SSF from service due to. the ASW leak and deficiencies in what equipment was protected during that time. Awaiting risk values 'from General Office to process and draft up issue in terms of SDP color. Licensee understands the issue and is working with the GO to get us what we need to process.Outside of Scope r 2'I U http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=

15070&sname=Oconee 11/4/2010 1 .TqModify Plant Issue Page 3 of 3 Outside of Scopehttp://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=

15070&sname=Oconee 11/4/2010

11/8/2010