ENS 40118
From kanterella
Revision as of 18:44, 24 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
|---|---|
17:50 Aug 29, 2003 | |
| Title | High Pressure Coolant Injection System Declared Inoperable |
| Event Description | During performance of routine operability testing, the High Pressure Coolant Injection System [HPCI] tripped and restarted due to an as yet undetermined cause. The trip and restart sequence occurred twice in close succession approximately 20 minutes into a normal run before the operator took action to manually trip the turbine. Investigation into the cause of the malfunction is on-going. The HPCI system has been declared inoperable in accordance with Technical Specifications.
The operability of all other Emergency Core Cooling System components has been verified. There was never any actual coolant injection by the HPCI system during this event. The NRC Resident Inspector has been notified by the licensee. The State of Massachusetts will also be notified. |
| Where | |
|---|---|
| Pilgrim Massachusetts (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
| Time - Person (Reporting Time:+3.3 h0.138 days <br />0.0196 weeks <br />0.00452 months <br />) | |
| Opened: | David Noyes 21:08 Aug 29, 2003 |
| NRC Officer: | Nathan Sanfilippo |
| Last Updated: | Aug 29, 2003 |
| 40118 - NRC Website
Loading map... | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |