PNO-I-12-002F: Update - Status of Union Lockout at Pilgrim Nuclear Power Station
ML12185A183
Person / Time
Site: Pilgrim
Issue date: 07/03/2012
From: Bellamy R R
NRC/RGN-I/DRP/PB5
To:
References
PNO-I-12-002F
Download: ML12185A183 (2)


Text

Date: July 3, 2012 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-I-12-002F This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information received may not yet be fully verified or evaluated by Region I staff. Facility Licensee Emergency Classification Entergy Nuclear Operations, Inc. ___ Notification of Unusual Event Pilgrim Nuclear Power Station ___ Alert Plymouth, MA ___ Site Area Emergency Docket: 50-293 ___ General Emergency

_X_ Not Applicable

SUBJECT:

UPDATE - CURRENT NRC ACTIONS AND STATUS OF UNION CONTRACT NEGOTIATIONS AT PILGRIM NUCLEAR POWER STATION

As of 8:00 a.m., on July 3, 2012, members of the United Workers Union of America (UWUA) Local 369 at Pilgrim Nuclear Power Station and Entergy Nuclear Operations, Inc. have not yet agreed to a new contract. UWUA Local 369 includes members of the maintenance, radiation protection, chemistry, and operations organizations. Entergy Nuclear and UWUA Local 369 leadership have agreed to resume contract negotiations on Friday, July 6, under the guidance of a federal mediator. The contract, which had been previously extended, expired at midnight on June 5.

The Entergy contingency plan remains in effect, with the use of qualified replacement workers to staff union positions throughout the plant. NRC resident inspectors, supplemented by regional inspectors, continue to provide augmented coverage at the site (NRC Inspection Procedure 92711, "Continued Implementation of Strike Plans during an Extended Strike"). The NRC onsite inspection watchbill has been adjusted to provide overlapping shifts and a daily presence onsite and in the control room to ensure Pilgrim meets its regulatory requirements.

The information presented herein has been discussed with Entergy and is current as of July 3, 2012, at 8:00 a.m. The NRC has kept the Commonwealth of Massachusetts informed. Region I Public Affairs is prepared to respond to media inquiries.

ADAMS Accession Number: ML12185A183 Contact: DRP Branch Chief, Ronald R. Bellamy (610) 337-5200 DISTRIBUTION: (PN Recipient List) OWFN TWFN Chairman G. Jaczko NMSS Comm. K. Svinicki OIG Comm. G. Apostolakis RES Comm. W. Magwood Comm. W. Ostendorff OIP OCA OGC OPA EDO OE NRR SECY IRO ACRS NSIR NRO PDR RSLO Regional Offices

By Fax: DOT:Trans INPO NSAC RI Resident Office Licensee: Entergy Nuclear Operations, Inc.

DOCUMENT NAME: G:\DRP\BRANCH5\2-PG\2012 Strike Preparations\UPDATE 6 - 2012 Pilgrim Union Negotiations PN.docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy ADAMS Accession Number: ML ML12185A183 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/PAO RI/SLO RI/DRP RI/ORA NAME RBellamy DScrenci DTifft JClifford DLew DATE 07/03/12 07/03/12 07/03/12 07/03/12 07/03/12 OFFICIAL RECORD COPY