ML12244A200
ML12244A200 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 07/23/2012 |
From: | NRC/RGN-III/DRS/OLB |
To: | |
Shared Package | |
ML12179A450 | List: |
References | |
Download: ML12244A200 (22) | |
Text
2012 D. C. COOK NUCLEAR PLANT INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE
- UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL June 1,2011 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer ' Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2
Dear Mr. Weber:
We have received your letter AEP-NRC-201 0-66. In that letter, you stated the initial operator licensing examinations were previously scheduled for July 23,2012, and July 21,2014, and July 18, 2016. In response, we concur with the above dates for initial operator licensing examinations at D. C. Cook Nuclear Power Plant. There are no changes to the existing schedule for these examinations.
On-site validation of these examinations is tentatively scheduled to occur approximately three weeks before the examination week. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates decline below ten for any examination as this will impact the examination schedule.
Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
L. Weber In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA by D. McNeil fori Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ L. Weber In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA by D. McNeil fori Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ DISTRIBUTION:
Daniel Merzke RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirslrib Resource Steven West Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\OL Exam Confirmation Letters\DCC 060111 DRS OL Exam Confirmation.docx o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a copy of this document Indicate In the concurrence box "C*
- Copy without attach/enel "E" =Copy with attach/encl "N"* No copy , OFFICE Rill I Rill I I I NAME RKWalton:co HPeterson DMfor DATE 05/13/2011 06/01/2011 OFRaAL RECORD Indiana Michigan Power One Cook Placa Bridgman, MI 49106 A unit of American fleclflc Po IndianaMjc
!ligan PoWet,COfll August 12, AEP-NRC-2010-66 Docket U. S. Nuclear Regulatory ATTN: Licensing Branch Chief, Region 2443 Warrenville Road, Suite Lisle, IL Donald C. Cook Nuclear Plant Units 1 and 2 UPDATED INFORMATION FOR INITIAL LICENSE EXAMINATION SUPPORT This letter provides updated information for Reactor Operator Initial License Examinations to be administered at Donald C. Cook Nuclear Plant (CNP). Enclosed is NRC Form 536, licensing Examination Data, which contains the details for those planned Indiana Michigan Power Company, the licensee for CNP, is still planning to administer reactor operator initial license examinations beginning on July 23, 2012, July 21, 2014, and July 18, 2016. However, the number of Instant/Direct Senior Reactor Operator candidates for the examination beginning on July 23, 2012, has increased by one and the number of Upgrade Senior Reactor Operator candidates has decreased by one from the number submitted in letter AEP-NRC-2009-67, dated September 11, 2009. We have included the revised numbers on the enclosed NRC Form 536. There are no new commitments identified in this submittal.
Should you have any questions, please contact Mr. Brian E. Evans, Operations Training Manager, at (269) 466-3407.
Sincerely, Joel P. Gebbie Site Vice President JEN/jmr Enclosure J. R. Kweiser-NRC Region III NRC Resident Inspector H. Peterson NRC Region III P. S. Tam -NRC Washington DC AlfG i 3 20m
" U. S. Nuclear Regulatory Commission AEP-NRC-2010-66 Page 2 be: S. L Freeman NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 1013112011 PO-WOS) Estimated burden per to comply with this voluntary information coliecUon request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information ccllection is used to plan budgets and resources for operator examinations.
Send comment. '1rarding burden OPERA TOR LICENSING I ., F 3} u.s. NucleElr 'hington.
DC 20555-000 , or internet EXAMINATION DATA e-mail to and to the Desk Officer.
01 In ormation 0202, (3150-0131), OffICe of Management and 20503. If a means used to impose an information Ii currenlly valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACiLITY NRC REGION Donald C. Cook Nuclear Plant One Cook Place 3 Bridgman, Ml49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2014 Cy 2016 CY--ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 I EXAMINA nONS ESTIMATED NUMBER OF 0 I)NRC-PREPARED 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY lO12 CyZ014 CY 2016 CY---NUMBER OF REACTOR 8 8 8 OPERATORS NUMBER OF SENIOR REACTOR 4 3 3 OPERATORS*
INSTANT NUMBER OF SENIOR REACTOR 3 4 4 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS*
LIMITED PROPOSED OATES PRIMARY DATE 07/23/2012 0712112014 07/18/2016 ALTERNATE DATE 07/3012012 07/28/2014 0712512016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2011 CY 2013 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 11 CANDIDATES NRC FORM 536 (10-2OOIl)
PRINTED ON RECYCLED PAPER UNITED STATES / NUCLEAR REGULATORY COMMISSION REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL February 19, 2010 Mr. Joseph Senior Vice President Chief Nuclear Indiana Michigan Power Nuclear Generation One Cook Bridgman, MI CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATION:
DONALD C. COOK NUCLEAR PLANTS UNITS 1 AND 2
Dear Mr. Jensen:
In response to your letter dated September 11,2009, (AEP-NRC-2009-67), the initial license operator examination requested to be conducted in July 2016 has been scheduled to start during the week of July 18, 2016. The other examinations you have requested in June 2010, July 2012, and July 2014 are scheduled to start per your letter dated August 28,2008, (Voluntary Response to NRC RIS 2008-16).
The on-site validation of the examinations will occur approximately 3 weeks prior to the examination start week. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine the NRC needs to develop an examination.
Because each of these examinations has greater than nine candidates anticipated for the examinations, the examinations have been scheduled for two weeks. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date or the number of candidates declines below ten candidates as this will impact the examination schedule.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
J.Jensen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ J. Jensen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of t lis letter will be available electronically for public inspection in the NRC Public Document Roc ,n or from the Publicly Available Records System (PARS) component of NRC's Agencyvvid
- Documents Access and Management System (ADAMS), accessible from the NRC We'r site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading r zoom). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Sa'ety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: Distribution via ListServ DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRP'" DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\Work in Progress\D( .: 021910 DRS OL.doc o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive To receive a co of this document, indicate in the box "e" = Cu wlo attach/end "E" = Copy with attach/end "N" = No copy OFFICE RIII:DRS RIII:DRS NAME JKweiser:cco DMcNeil DATE 02118/10 02/18/10 I Rill: DRS I I HPeterson 02/19/10 OFFICI, \L RECORD COpy Indiana Power Group INDIANA MICHIGAN POWI'. September 11, 2009 AEP-NRC-2009-67 10 CFR 55.31(a)(3)
Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Licensing Branch Chief, Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 REQUEST FOR INITIAL LICENSE EXAMINATION SUPPORT This letter requests Reactor Operator Initial License Examination support by Nuclear Regulatory Commission (NRC) Region III personnel in July 2016, for Donald C. Cook Nuclear Plant (CNP). Enclosed is NRC Form 536, Operator Licensing Examination Data, which contains the details of our request. Indiana Michigan Power Company, the licensee for CNP, is still planning to administer reactor operator initial license examinations beginning on June 21, 2010, July 23, 2012, and July 21, 2014. However, the number of Instant/Direct Senior Reactor Operator candidates for the examination beginning on June 21, 2010, has decreased by one from the number submitted in letter AEP-NRC-2008-45, dated October 16, 2008. We have included the revised number on the enclosed NRC Form 536. There are no new commitments identified in this submittal.
Should you have any questions, please contact Mr. Brian E. Evans, Operations Training Manager, at (269) 466-3407.
Sincerely, Lawrence J. Weber Site Vice President JEN/rdw Enclosure SEP 1 5
U. S. Nuclear Regulatory Commission Page 2 c: T. A. Beltz -I\lRC Washington DC J. R. Kweiser -NRC Region III NRC Resident Inspector H. Peterson -I\lRC Region III NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10-2008)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 Estimated burden per to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his Information collection is used to plan budgets and resources for operator examinations.
Send comments burden estimate to the Records and FOIAIPrivacy Services Branch I -5 F 3), U.S Nuclear Commission.
Washington, DC 20555-000 ,or by' Internet e-mail to in oCollects@nrc'80v, and to the Desk Officer, Office of In ormation and Regulatory Affa,rs, NE B-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collec\ion, FACILITY Donald C. Cook !'iuclear Plant One Cook Plact' Bridgman, MI 49106 NRC REGION 3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2012 CY 2014 CY 2016 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 J 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 --Cy 2012 CY 2014 CY 2016 NUMBER OF REACTOR OPERATORS 8 8 8 8 NUMBER OF SENIOR REACTOR 1 OPERATORS -INSTANT 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS*
UPGRADE 5 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS*
LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/2112010 07123/2012 07/21/2014 07/18/2016 ALTERNATE DATE 06/28/2010 07/30/2012 07/28/2014 07/2512016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2011 Cy 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 11 11 NRC FORM 536 (10-2008)
PRINTED ON RECYCLED PAPER Indiana Michigan Power Company Nuclear GeneratIOn GrQup INDIANA One Cook Place Bndgman, MI 49Hlt;POWaep.com October 16, AEP-NRC-2008-45 Docket U. S. Nuclear Regulatory ATTN: Licensing Branch Chief, Region 2443 Warrenville Road, Suite Lisle, IL Donald C. Cook Nuclear Plant Units 1 and REVISED DATES FOR 2010 REACTOR INITIAL LICENSE Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant Units 1 and 2, is submitting a request for revised dates for the June 2010 reactor operator initial license examinations.
Based upon our class size, class composition, and start date, we are requesting examination dates for the weeks of June 21 5t and June 28 th of 2010. These revised dates have tentatively been agreed to in a telephone conversation between Mr. D. R. McNeil, Nuclear Regulatory Commission (NRC), and Mr. I. D. Fleetwood, I&M. Upon NRC review and approval of these revised dates, I&M will no longer need the 2010 examination dates discussed in letter AEP-NRC-2008-31, dated August 28, 2008. I&M still intends to administer the reactor operator initial license examinations in 2012 and 2014 as proposed in the August 28,2008, letter. Although the total number of candidates remains the same for the 2010 examinations, the number of Senior Reactor Operator (SRO) -Instant candidates has changed from 3 to 2, the number of SRO -Upgrade candidates has changed from 4 to 5, and the number of candidates for the Generic Fundamentals Examination has changed from 11 to 10. This revised information is included on the enclosed NRC Form 536. . Should you have any questions, please contact Mr. Brian E. Evans, Operations Training Manager, at (269) 466-3407.
Sincerely, Plant Manager JEN/rdw enclosure AEP-N U. S. Nuclear Regulatory Commission Page 2 c: T. A. Beltz -NRC Washington DC J. R. Kweiser -NRC Region III NRC Resident Inspector H. Peterson NRC Region III t '" NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request 1 hOllr, This information collection is used 10 plan budgets and resources for operator examinations, Send comments burden OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch ( *5 F53). U,S, Nuclear Regulatory Commission, Washington, DC 20555*0001, or by internet EXAMINATION DATA e-mail to infoCOllects@nrc'gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NE B*10202. (3150*0131), Office of Management and Budget, Washington, DC 20503, If a means used to impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection, FACILITY NRC REGION Donald C. Cook Nuclear Plant One Cook Place 3 Bridgman, MI 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2012 Cy2014 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2012 CY2014 CY NUMBER OF REACTOR OPERATORS 8 8 8 NUMBER OF SENIOR REACTOR 2 3 3 OPERATORS
-INSTANT NUMBER OF SENIOR REACTOR 5 4 4 OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR OPERATORS*
LIMITED PROPOSED DATES PRIMARY DATE 06/21/2010 07/23/2012 07/21/2014 ALTERNATE DATE 06/28/2010 07/30/2012 07/28/2014 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2009 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 11 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER October 7, 2008 Mr. Michael W. Rencheck Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, 49106 CONFIRMATION OF INITIAUREQUALIFICATION OPERATOR LICENSE EXAMINATIONS:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND2
Dear Mr. Rencheck:
In response to your letter dated August 28, 2008, (Voluntary Response to NRC RIS 2008-16), initial license operator examinations were scheduled to start during the weeks of June 7,2010, July 23,2012, and July 21,2014. On-site validation of the examinations will occur approximately three weeks prior to the examination start week. In the unlikely event that we are unable to support the examinations during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine the NRC needs to develop an examination.
Because each examination has greater than nine candidates anticipated for the examination, each examination has been scheduled for two weeks. Please inform us at your earliest opportunity if you discover you need to change the scheduled examination date or the number of candidates declines below ten candidates as this will impact the examination schedule.
A supplementary letter will be sent to the training department approximately 120 days prior to each examination informing the training manager of the chief examiner'S name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. We have scheduled a Licensed Operator Requalification Training Program Inspection (lP 71111.11) for the week of March 8, 2010. Please inform us at your earliest opportunity if you discover this week is outside of your normally scheduled requalification training program's annual examinations.
If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.
M. Rencheck In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: L. Weber, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Michigan Department of Environmental Planning Manager, Emergency Management and Security Division, Michigan State Police Department T. Strong, State Liaison Officer M. Rencheck In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 cc: L. Weber, Site Vice President J. Gebbie, Plant Manager G. White, Michigan Public Service Michigan Department of Environmental Planning Manager, Emergency Management and Security Division, Michigan State Police Department T. Strong, State Liaison Officer DISTRIBUTION:
RidsNrrDorl Lp13-1 RidsNrrPMDCCook Resource Tamara Bloomer RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\DCC 100708 DRS OL.DOC X Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T* f h* d ocnment, ID. d* . h e b "e" = C I enc I "E" OPY WIt. h enc I "N" o copy o receIve a COP) 0 t IS lute ID t ox OPY W 0 attac hi = C attac hi = N OFFICE RIII:DRS I RIII:DRS I Rill: DRS I I NAME JKweiser:cco DMcNeil HPeterson DATE 09/30108 10102/08 10107/08 OFFICIAL RECORD Indiana Power Nuclear Generatioo Group INIIIJINII One Cook MICHIGAN flrid'lmall, MI 49106aop,corn August 28, AEP-NRC-2008-31 10 CFR 55.31 (a)(3) Docket 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Licensing Branch Chief, Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and REQUEST FOR INITIAL LICENSE EXAMINATION This letter requests Reactor Operator Initial License Examination support by Nuclear Regulatory Commission (NRC) Region III personnel in July 2012 and July 2014 for Donald C. Cook Nuclear Plant (CNP). Enclosed is NRC Form 536, Operator Licensing Examination Data, which contains the details of our request. Indiana Michigan Power Company. the licensee for CNP, is still planning to administer reactor operator initial license examinations beginning on June 7, 2010. However, the number of candidates for this examination is different than originally submitted in letter AEP:NRC:2574-121, dated December 15, 2005. We have also included the revised numbers on the enclosed NRC Form 536. There are no new commitments identified in this submittal.
Should you have any questions, please contact Mr. Ronald E. Harrah, Operations Training Manager, at (269) 466-3407.
Sincerely, Joel P. Gebbie Plant Manager JEN/rdw Enclosure AUG
U. S. Nuclear Regulatory Commission Page 2 c: 1. A. Beltz NRC Washington DC J. R. Kweiser -NRC Region III NRC Resident Inspector H. Peterson -NRC Region III NRC FORM 536 u.s. NUCLEAR REGULATORY COMMISSION (8.2005) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO, 3150<<Q131 EXPIRES: 0813112008 Estimated burden per response to comply with this voluntary information collection request 1 hOUL This information collection is used to plan budgets and resources for operator examinations, Send comments burden estimate to the Records and FOIAIPrivacy Services Branch ( -5 F 3}. UB. Nuclear Rer,ulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to in ocoliects@nfCBOv.
and to Ihe Desk Officer, Office of Infonnatlon and Regulatory Affairs, NE B-l0202. (3150-0131), Office of Management and Budgel. Washington, DC 20503, If a means used 10 impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required 10 respond to, the information COllection, ' FACILITY Donald C. Cook Nuclear Plant One Cook Place Bridgman.
MI 49106 NRC REGION 3 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 Cy2012Cy2014--CyESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2012CY2014CYNUMBER OF REACTOR OPERATORS 8 8 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS
-LIMITED PROPOSED DATES PRIMARY DATE 06/07/2010 07/23/2012 07/21/2014 ALTERNATE DATE 06/1412010 07/30/2012 07/28/2014 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2009 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 11 11 PRINTED ON RECYCLED PAPER NRC FORM 536 (8*2005)