Category:License-Operator
MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23107A2502023-04-18018 April 2023 Requalification Program Inspection ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21105A3712021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C3342019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A9822017-08-28028 August 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17072A0122017-03-0909 March 2017 Senior Reactor and Reactor Operator Initial License Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17003A2812016-11-28028 November 2016 Handouts to Applicants (Folder 3) ML17003A2782016-11-28028 November 2016 Final Qa/Related Forms - Forms ES-401 (Folder 1) ML16342C5202016-11-21021 November 2016 Exam Folder 1, Post-Exam Comments, Resolution and Tech References ML16300A1552016-10-26026 October 2016 Initial Operator Licensing Written Examination Approval - Beaver Valley Power Station, Unit 1 ML16342C5222016-10-24024 October 2016 Final Written Exam, Folder 3 ML17003A2762016-10-24024 October 2016 Final Qa/Related Forms (Folder 1) 2023-05-10
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A9822017-08-28028 August 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17072A0122017-03-0909 March 2017 Senior Reactor and Reactor Operator Initial License Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17003A2812016-11-28028 November 2016 Handouts to Applicants (Folder 3) ML17003A2782016-11-28028 November 2016 Final Qa/Related Forms - Forms ES-401 (Folder 1) ML16342C5202016-11-21021 November 2016 Exam Folder 1, Post-Exam Comments, Resolution and Tech References ML16300A1552016-10-26026 October 2016 Initial Operator Licensing Written Examination Approval - Beaver Valley Power Station, Unit 1 ML16342C5222016-10-24024 October 2016 Final Written Exam, Folder 3 ML17003A2802016-10-24024 October 2016 Final Outlines (Folder 3) ML17003A2762016-10-24024 October 2016 Final Qa/Related Forms (Folder 1) ML17003A2822016-10-24024 October 2016 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17003A2832016-09-30030 September 2016 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML16342C5212016-09-28028 September 2016 Exam Folder 3, Final Operating Examination 2023-05-10
[Table view] |
Text
NRC Examination Student Questions During Exam and Proctor Responses Time Individual 0857 SRO # 11 0915 SRO # 12 1019 SRO # 12 1028 RO # R4 1045 SRO # 12 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#
23 Question:
The Control Room Radiation Monitor has different alarm levels, they are Warn and High. Did the monitor fail to the High setpoint level or to full meter scale? Response:
Assume the monitor has failed full scale. Question#
34 Question:
I am unsure of what the word "STUCK" means. Can the PORV be manually cycled? Note -The candidate then re-read the question and saw the wording about manually cycling and stated that he did not have a question Response:
No Response given, self answered by candidate.
Question#
62 Question:
Can I assume that non-isolable Instrument Air Leak mans a complete loss of Air pressure, = 0 psig? Response:
Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure. Question # 63 Question:
Am I to determine the impact on TV-1CN-100 solely on the indications received? (in the question stem) Response:
Yes Question#
7 Question:
Asked about the status of the other pressurizer heaters. Response:
Reminded the candidate to assume all systems function as designed.
Page 1 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual 1100 RO # R4 1120 SRO # 11 1125 RO # R1 1255 RO # R1 1403 SRO # 11 Beaver Valley BV1 LOT14 7/14/14 Question/Response Question#
55 Question:
Stated-with given conditions, CIB and SIS should have actuated by now. Choice B says pressure will continue to rise until CIB is automatically actuated.
Am I to assume that automatic CIB failed to actuate? Response:
You have enough information to answer the question.
Question#
94 Question:
Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor? Response:
Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion)
Question#
65 Question:
Can you assume the transformer faults if doused with water? Response:
Assume there are no other failures of detection or plant equipment. (also informed other candidates, via white board of the status, per discussion with chief examiner)
Question # 37 Question:
For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray? Response:
Assume NSA for the given power level. Question # 65 Question:
Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment?
Response:
Yes Page 2 of 3 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1417 Question#
7 SRO Question:
PC-1 RC-445 is in Auto at 45% in the initial conditions.
Am I understanding
- 13 that after the 1st stage failure it stayed at 45% demand? Response:
Yes, just as it is stated 1424 Question#
67 RO Question:
Is this diamond symbol actually in the procedure?
- R3 Response:
Yes 1440 End of the exam no further questions Beaver Valley BV1 LOT14 7/14/14 Page 3 of 3 Door Door Beaver Valley BV1LOT14 NRC Written Exam Seating Chart 7/14/14 Rear [ j Lunch Tables ,-] j RO R4 Chudy I i SPARE L.._ r I -4 Feet -4 Feet -4 Feet -4 Feet j SRO 12 Keener 1 SPARE l I I -4 Feet -4 Feet -4 Feet -4 Feet l RO R3 Frable L J SRO 13 Tabinowski I r -4 Feet -4 Feet Proctor Desk I Proctor Desk I Proctor Desk Front Room 103 BVPS Training Center RO R1 Hicks -4 Feet .I SRO 11 Hovanec -4 Feet .*: RO R2 Williams 11 Steve Hovanec 12 Shawn Keener 13 Craig Tabinowski R1 Roger Hicks R2 Jon Williams R3 Dave Frable R4 Steve Chudy I I I