Text

1LOT14 NRC JPM CHANG. 3 FROM WALKTHROUGH ADMINSTRATIVE JPMS JPM# TITLE Summary of Changes From the NRC Walkthrough Global ALL Removed the Directions from the Evaluator and Candidate Direction Sheet.

Change RO A1.1 1AD-007 Perform An Estimated Critical Position No additional Changes to the JPM.

Calculation Curve Book from the Simulator has been updated since the exam validation. The exam will be administered using the version that the exam was validated against. Curve for MTC verification was included in the curve book.

RO A1.2 1AD-016 Plot and Evaluate 1/M Data Revised JPM to add step for candidate to recommend inserting Control Rods and to provide reference procedure that contains the guidance for actions to take when 1/M predicts criticality outside of the target band.

ROA2 1AD-047 Prepare a Clearance Tagout (1 FW-P-3B) No additional Changes to the JPM.

ROA3 1AD-004 Perform Decay Tank Discharge Pre- No additional Changes to the JPM.

Release Verification Modified the Gaseous Waste Pre-Release data sheet to increase the font size of the data on the form to be more legible and included the sample number from the release cover sheet on this form.

SRO A1.1 1AD-011 Review An Estimated Critical Position Changed Acceptance criteria to match final boron concentration +/-50 ppm.

Calculation (SRO Only) Curve Book from the Simulator has been updated since the exam validation. The exam will be administered using the version that the exam was validated against. Curve for MTC verification was included in the curve book SRO A1.2 1AD-048 Determine Availability For Caii-in (3 ROs) No additional Changes to the JPM.

SRO ONLY SROA2 1AD-041 Perform a Risk Assessment (1 FW-P-3A Modified Initial Conditions to include the reason why the plant is currently in Yellow Risk, Maintenance SRO ONLY due to Nuclear Safety related to work activities near the Emergency Diesel Generator.

SROA3 1AD-042 Determine Compensatory Actions For RM- No additional Changes to the JPM.

P-1 GW-1 08 and 02A-1 GW-11 0-1 Being OOS SRO ONLY SROA4 1AD-046 Classify an Emergency Event (Scenario Revised the release information for Simulator Scenario #2.

Specific)

1LOT14 NRC JPM CHAN(; 3 FROM WALKTHROUGH SIMULATOR and PLANT JPMS JPM# TITLE Summary of Changes From the NRC Walkthrough Global ALL Removed the Directions from the Evaluator and Candidate Direction Sheet.

Change S1 1CR-072 Shift From Main Feedwater Regulating No additional Changes to the JPM.

Valves to Bypasses PAIRS4 S2 1CR-658 Discharge Laundry and Contaminated Added Evaluator cue to step 15 to inform candidate to raise discharge flow rate to a Shower Drain Tank 6A (High Radiation minimum of 10 gpm, if needed.

Received, No Auto Actions Occur) Changed value in the Fault Statement from 39" to 38" S3 1CR-596 Rod Control Assembly Partial Movement Changed task standard, due to JPM changing from stuck rod followed by dropped rod, to Test (Rods Continue to Move) continuous inward rod motion during the OST.

Added Evaluator Cue for using Manual rod control.

Changed associated procedure for the JPM (added 1OM-53C.4.1.1.3 Unexpected Control Rod Movement)

S4 1CR-659 Drain SIS Accumulator A (Low Pressure Added Evaluator Note after step 11 regarding a pre-job brief being completed.

Alarm received) Added Evaluator Cue for time compression after step 17, clearing pressure alarms.

PAIRS1 SS (ROs) 1CR-056 Place Excess Letdown in Service No additional Changes to the JPM.

S6 1CR-661 Respond to High PRT Temperature Added Evaluator Cue to have candidate drain accumulator if the level indication is not (High PRT Level Alarm Received during >78%. This was added due to the available computer trending in Control Room.

spray down)

PAIRS7 S7 1CR-660 Transfer 4KV Emergency Bus from EDG to Added Evaluator Cue for time compression in step 12 during the EDG shutdown.

Normal Feed (EDG 0/C Occurs, EDG Auto Removed Motor Operated Ground switch manipulation from the Fault Statement as it is Action fail to occur) not applicable.

PAIRS6 Step 17.2 changed PB to plural PBs.

sa 1CR-594 Respond to a Loss of the RHR System No additional Changes to the JPM.

(RHR pump trips, requiring RCP start)

I P1 1PL-003 Startup a Rod Drive MG Set No additional Changes to the JPM.

P2 1PL-004 Reset the Terry Turbine Trip Throttle Valve No additional Changes to the JPM.

P3 1PL-031 Place the Diesel Air Compressor In No additional Changes to the JPM. '

1LOT14 NRC SCENARIO CHANGES FROM WALKTHROUGH Scenario# Summary of Changes From the NRC Walkthrough 1 Removed CT-33 (ECA-2.1.A) from ES-D-1 and script.

Chal}g_ed script to terminate scenario upon transition to ECA-2.1.

2 Scripted letdown restoration activities.

Modified Event 2 initiation to Lead Evaluator discretion.

3 Changed initial power level to 4.9%.

Fixed command for Event 3, FCV-1CH-122 fails shut.

Scripted amount of expected dilution and dilution actions.

Modified initiation of Events 2,3, & 4 to occur at Lead Evaluators discretion.

4 Deleted CT-16 (E-1.C) from ES-D-1 & and scriQt.