NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 0857 Question# 23 SRO Question: The Control Room Radiation Monitor has different alarm levels, they are Warn and High. Did the monitor fail to the High setpoint level or to full meter scale?

  1. 11 Response: Assume the monitor has failed full scale.

0915 Question# 34 SRO Question: I am unsure of what the word "STUCK" means. Can the PORV be manually cycled?

  1. 12 Note - The candidate then re-read the question and saw the wording about manually cycling and stated that he did not have a question Response: No Response given, self answered by candidate.

1019 Question# 62 SRO Question: Can I assume that non-isolable Instrument Air Leak mans a complete loss

=

of Air pressure, 0 psig?

  1. 12 Response: Per the question stem, AOP-1.34.1 was entered for a non-isolable instrument air system piping failure.

1028 Question # 63 RO Question: Am I to determine the impact on TV-1CN-100 solely on the indications received? (in the question stem)

  1. R4 Response: Yes 1045 Question# 7 SRO Question: Asked about the status of the other pressurizer heaters.
  1. 12 Response: Reminded the candidate to assume all systems function as designed.

Beaver Valley BV1 LOT14 7/14/14 Page 1 of 3

NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1100 Question# 55 RO Question: Stated- with given conditions, CIB and SIS should have actuated by now.

Choice B says pressure will continue to rise until CIB is automatically actuated. Am I

  1. R4 to assume that automatic CIB failed to actuate?

Response: You have enough information to answer the question.

1120 Question# 94 SRO Question: Does choice #2 mean the physical act of turning the trip switch or direct the action to trip the reactor?

  1. 11 Response: Physical act of turning the trip switch to trip the reactor (also informed other SRO candidates per chief examiner discussion) 1125 Question# 65 RO Question: Can you assume the transformer faults if doused with water?
  1. R1 Response: Assume there are no other failures of detection or plant equipment. (also informed other candidates, via white board of the status, per discussion with chief examiner) 1255 Question # 37 RO Question: For distractor "C", is it assuming "Normal" pressurizer spray or "Aux" spray?
  1. R1 Response: Assume NSA for the given power level.

1403 Question # 65 SRO Question: Clarification as to previous statement on white board. Is that saying that there are no subsequent failures of plant equipment?

  1. 11 Response: Yes Beaver Valley BV1 LOT14 7/14/14 Page 2 of 3

NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1417 Question# 7 SRO Question: PC-1 RC-445 is in Auto at 45% in the initial conditions. Am I understanding that after the 1st stage failure it stayed at 45% demand?

  1. 13 Response: Yes, just as it is stated 1424 Question# 67 RO Question: Is this diamond symbol actually in the procedure?
  1. R3 Response: Yes 1440 End of the exam no further questions Beaver Valley BV1 LOT14 7/14/14 Page 3 of 3

Beaver Valley BV1LOT14 NRC Written Exam Seating Chart 7/14/14 Rear [ j Lunch Tables , - ]

Door j RO R4 Chudy I r i SPARE L.._

I ~~ RO R1 Hicks I

-4 Feet -4 Feet

-4 Feet -4 Feet -4 Feet j SRO 12 Keener 1

~r SPARE l .I SRO 11 Hovanec I

I I

-4 Feet -4 Feet

-4 Feet -4 Feet -4 Feet l RO R3 Frable I

L J SRO 13 Tabinowski l~

r

-4 Feet

.*: RO R2 Williams I

-4 Feet 11 Steve Hovanec 12 Shawn Keener 13 Craig Tabinowski R1 Roger Hicks R2 Jon Williams Proctor Desk R3 Dave Frable Door I Proctor Desk I Proctor Desk R4 Steve Chudy Front Room 103 BVPS Training Center