Duane Arnold Energy Center, Inservice Inspection Report
ML15054A007
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/19/2015
From: Vehec T A
NextEra Energy Duane Arnold
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NG-15-0020
Download: ML15054A007 (8)


Text

NEXTera EN ERGYOM February 19, 2015 NG-1 5-0020 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 Inservice Inspection Report In accordance with the Code of Federal Regulations, Title 10, Part 50.55a, NextEra Energy Duane Arnold, LLC, submits the attached Inservice Inspection (ISI) Summary Report (Owner's Activity Report, Form OAR-i) for the Duane Arnold Energy Center (DAEC). This report has been prepared in accordance with Section Xl of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 2001 Edition with addenda through 2003, and ASME Code Case N-532-4. This report includes the examinations performed at the DAEC during Cycle 24 operations and Refueling Outage No. 24 (RF024) of the fourth 10-year ISI interval.This letter contains no new commitments nor revises any previous commitments.

If you h e any questions, please contact J. Michael Davis at (319) 851-7032.T. A. Vehec Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Attachment cc: Administrator, Region Ill, USNRC Project Manager, DAEC, USNRC Senior Resident Inspector, DAEC, USNRC NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 Attachment for NG- 15-0020 Page 1 of 6 NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center Inservice Inspection Summary Report For Cycle 24 and RFO 24 Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 Date of Commercial Service February 1, 1975 Attachment for NG- 15-0020 Page 2 of 6 INDEX Sum m ary .................................................................................................................

Section 1 O A R-1 Form , O w ner's A ctivity Report .................................................................

Section 2 Table 1 ...................................................................................................................

Section 3 Table 2 ...................................................................................................................

Section 4 Attachment for NG-15-0020 Page 3 of 6 Section 1 Summary The Duane Arnold Energy Center, Fourth Ten-Year Inservice Inspection (ISI) Plan was developed to comply with 10 CFR 50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2001 Edition with 2003 Addenda.The following summary report is being submitted pursuant to the reporting requirements of ASME Section XI as amended by ASME Code Case N-532-4.This summary report contains the Form OAR-I Owner's Activity Report and Tables 1 and 2 of the Code Case for Duane Arnold Energy Center during Cycle 24 and Refueling Outage No. 24 (RF024). Delamination found on the Torus was evaluated for continued service under Condition Evaluation 2003574-02.

RF024 is the first outage of the third period in the fourth inspection interval.

This report includes Repair/Replacement Activities from November 27, 2012 to November 25, 2014.

Attachment for NG- 15-0020 Page 4 of 6 Section 2 OAR-1 Form Owner's Activity Report FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number NG-15-0020 Plant Duane Arnold Energy Center, 3277 DAEC Road, Palo, IA 52324 Unit No. 1 Commercial Service Date February 1, 1975 Refueling Outage No. RF024 Current Inspection Interval ISI -Fourth Interval IWE -Second Interval Current Inspection period ISI -Third Period IWE -Second Period Edition and Addenda of Section Xl applicable to the inspection plan 2001 Edition with 2003 Addenda Date and revision of inspection plan ISI -April 8, 2014 Rev. 9 IWE- December 6, 2011 Rev. 2 Edition and Addenda of Section X1 applicable to repairs and replacements, if different than the inspection plan Same Code Cases used: N-460, N-532-4, N-702 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this Owner's Activity Report are correct; (b) and the examinations and tests metthe Inspection Plan as required by the ASME Code,Section XI; and (c)the repair/replacement act *i es and evaluations supporting the completion of RF024 conform to the requirements of SectioF,01/.

Signed ///Date 2,11&113 Site Ai4e President CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacements activities and evaluation described in this report.Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NB14084ANI, IA1622 National Board, State, Province, and Endorsements Attachment for NG-l15-0020 Page 5 of 6 Section 3 Table 1 Items with Flaws or Relevant Condition that Required Evaluation for Continued Service Examination Category and Item Number Item Description Evaluation Description IWE Torus Shell Surfaces Accessible CE 2003574-02 E-C E4.11 areas and Wetted Areas Evaluation of coatings which compared coating thickness allowances in accordance with calculation CAL-A 1l-001 Attachment for NG- 15-0020 Page 6 of 6 Section 4 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code Item Description Description of Date Repair/Replacement Class Work Completed Plan Number 1E235A Chiller 3 Condenser Replaced Head 06/12/2014 40250850-01 3 1E235B Chiller Replaced Head 06/26/2014 40309663-02 Condenser 1E237B Chiller Oil 3 Cooler Replaced Head 06/26/2014 40311201-01 3 1E053B3 Jacket Water Weld Repair Cover 07/08/2014 40292949-01 Cooler Plate V22-0017 HPCI 2 Turbine Steam Exhaust Repaired Disc 11/01/2014 40210757-07 Check/Stop Valve 2 Pipe Support on Replace Pipe Strap 11/02/2014 40267420-01 EBC008 2 1T219B Pipe Support Replace Pipe Strap 11/02/2014 40272112-01 2 EBB0l4 HPCI Steam Replaced Pipe Clamp 11/21/2014 40077652-01

____ ___ Supply _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

BLIND CARBON COPY LIST FOR NG-15-0020 February 19, 2015 F. Dohmen S. Presler IRMS D. Church GDS Associates, Inc. CTS Project ORG (P. Vandersee)

CNRB M. Davis Ryan Lange (ANII)G. Pry D. Slivon

Subject:

Inservice Inspection Report