ONS-2017-070, Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002

From kanterella
Revision as of 23:17, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002
ML17285A032
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/05/2017
From: Dunton C T
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONS-2017-070
Download: ML17285A032 (2)


Text

e.f-..DUKE

., ENERGY Carrie T. Dunton Vice President*

Oconee Nuclear Station , ____ ------ONS-2017-070 October 5, 2017 Attn: Document Control Desk U. S. Nucle.ar Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-27 46 10 CFR 50.54(q)

Subject:

Duke Energy Carolinas, LLC. Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002 Duke Energy ON01VP J 7800 Rochester Hwy Seneca, SC 29672 o: 864.873.3477 f 864.873.4208 Carrie.dunton@duke-energy.com Please find attached for your use and review copies of the enclosed revisions along with the associated supporting documentation and 10 CFR 50.54(q) evaluation.

These procedures are Emergency Plan Implementing Procedures.

This revision is being submitted in accordance with 10 CFR 50.54(q) and does not reduce the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.

If there are any questions or concerns pertaining to this revision please call William Mcintyre, Emergency Preparedness Manager, at 864-873-3389.

By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia. Sincerely, Carrie T. Dunton Director, Site Support Oconee Nuclear Station Attachments:

EPIP Volume 2 -Revision 2017-002 Revision Instructions EPIP Procedure:

HP/O/B/1009/020 Rev. 006 50.54(q) Evaluation Screening Evaluation Form 50.54(q) Effectiveness Evaluation Form www.duke-energy.com ONS-2017-070 U.S. Nuclear Regulatory Commission October 5, 2017 xc: w/2 copies of attachments Ms. Catherine Haney Administrator, Region II Marquis One Tower 245 Peachtree Center., NE Suite 1200 Atlanta GA 30303-1257 w/copy of attachments Ms. Audrey Klett, Project Manager (ONS) (by electronic mail only) U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 w/o attachments Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station ELL-EC2ZF