ML18059A207

From kanterella
Revision as of 01:24, 6 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
NRC Staff February 2018 Disclosures
ML18059A207
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 02/28/2018
From: Ghosh A K
NRC/OGC
To: Sekazi Mtingwa, Spritzer R M, Trikouros N G
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-443 LA-2, ASLBP 17-953-02-LA-BD01, RAS 54230
Download: ML18059A207 (5)


Text

February 28, 2018 Administrative Judge Ronald M. Spritzer, Chair Atomic Safety and Licensing Board Panel Mail Stop T

-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop T

-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 Administrative Judge Dr. Sekazi Mtingwa Atomic Safety and Licensing Board Panel Mail Stop T

-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 In the Matter of NEXTERA ENERGY SEABROOK, LLC (Seabrook Station Unit 1

) Docket No. 50-443-LA-2; ASLBP No. 17

-953-LA-BD01

Dear Administrative Judges:

Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Board's ("Board") November 29, 2017 Initial Scheduling Order , the staff of the U.S. Nuclear Regulatory Commission ("Staff") herein notifies the Licensing Board and the parties that the hearing file has been supplemented for this proceeding. On or about March 9, 201 8, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System ("ADAMS") and through the Electronic Hearing Docket ("EHD").

The EHD may be accessed at the following URL: http://adams.nrc.gov/ehd/. The hearing file will be contained in a sub

-folder entitled, "Seabrook LA2 Hearing File" in the "Seabrook Docket No. 50

-443-LA-2" folder of the EHD.

An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1.

Pursuant to 10 C.F.R. § 2.336(c), attached is the affidavit of Justin C. Poole, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete for documents identified as of February 16, 2018

. The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the issues to be decided in this proceeding.

U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O NWASHINGTON, DC 20555 - 0001

R. Spritzer February 28, 2018 N. Trikouros S. Mtingwa Sincerely, /Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff

Enclosures:

Attachment 1

- Hearing File Index Affidavit of Justin C. Poole cc: Service List

Attachment 1 - Seabrook LA 2 Hearing File Index Update 2 - February 28, 2018 ID# Accession Number Document Date Title NRC-00290 ML18043A821 02/12/2018 Seabrook Station, Unit No. 1: Integrated Inspection Report 05000443/2017004.

NRC-00291 ML18054A355 01/29/2018 2018/01/29 Seabrook LA

- FINAL REQUESTS FOR ADDITIONAL INFORMATION FOR THE SAFETY REVIEW OF THE SEABROOK STATION LICENSE RENEWAL APPLICATION docket no.05-443 February 28

, 2018 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

) ) NEXTERA ENERGY SEABRO O K ) Docket No. 50

-443-LA-2 ) (Seabrook Station Unit 1)

) AFFIDAVIT OF JUSTIN C. POOLE CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)

I, Justin C. Poole, do hereby state as follows:

1. I am employed as a Project Manager in the U.S. Nuclear Regulatory Commission's (NRC) Office of Nuclear Reactor Regulation. I currently serve as a project manager for Seabrook Station

, Unit 1. Among other things, I have been assisting with the preparation of the hearing file and mandatory disclosures in connection with the license amendment request at issue in this proceeding.

2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. §§ 2.336 (b)

-(c) and 2.1203 and the Board's November 29, 2017 Initial Scheduling Order in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified as of February 16 , 2018. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

Executed in Accord with 10 CFR 2.304(d)

Justin C. Poole Project Manager U.S. Nuclear Regulatory Commission Washington, DC 20555 Telephone: (301) 415

-2048 Email: Justin.Poole@nrc.gov Executed in Rockville, Maryland this 28 t h day of February 201 8 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

) ) NEXTERA ENERGY SEABROOK LLC

) Docket No. 50

-443-LA2 ) (Seabrook Station, Unit 1)

) ) CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing Letter to the Atomic Safety and Licensing Board regarding the Seabrook Station License Amendment 2 Hearing File, including:

Attachment 1

- Seabrook License Amendment 2 Hearing File Index

- Update 2 and Affidavit of Justin C. Poole , dated February 28 , 2018 , in the above

-captioned proceeding have been served upon the Electronic Information Exchange

, the NRC's E

-Filing System, this 28 t h day of February, 201 8. /Signed (electronically) by/

Anita Ghosh Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O1 4-A44 Washington, DC 20555 Telephone: (301) 287-9175 E-mail: Anita.Ghosh@nrc.gov