May 3, 2012 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Dr. Richard E. Wardwell Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. Michael F. Kennedy Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of NEXTERA ENERGY SEABROOK, LLC (Seabrook Station, Unit 1)
Docket No. 50-443-LR
Dear Administrative Judges:
Pursuant to 10 C.F.R. §§ 2.1203 and 2.336 and as modified by the Atomic Safety and Licensing Boards (Board) Initial Scheduling Order dated April 4, 2011 (as amended Orders dated August 23, 2011 and October 3, 2011), and the Boards Memorandum and Order (Granting Joint Motion Regarding Mandatory Disclosures) (Order), dated November 10, 2011, the staff of the Nuclear Regulatory Commission (Staff) is providing an index (Attachment 1) identifying documents subject to disclosure under the Boards Order.
On or about Mary 3, 2012, materials in the hearing file may be accessed through the Agencywide Documents Access and Management System (ADAMS) and through the Electronic Hearing Docket (EHD). The index contains the ADAMS accession number, document date, and the document title.
Pursuant to 10 C.F.R. § 2.336(c), attached is the Affidavit of Michael Wentzel, certifying that all relevant materials required by this section have been disclosed, and that the disclosures are accurate and complete as to documents identified by April 15, 2012.
Judge Ryerson May 3, 2012 Judge Kennedy Judge Wardwell The NRC Staff notes that it has made a good faith effort to identify and characterize all documents meeting the criteria of 10 C.F.R. § 2.336(b) and 10 C.F.R. § 2.1203 in this proceeding. In identifying these documents, the Staff does not concede their relevance to the license renewal issues to be decided in this proceeding.
Sincerely, Signed (electronically) by
_______________________________
Mary B. Spencer Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1324 E-mail: mary.spencer@nrc.gov Date of signature: May 3, 2012
Enclosures:
Attachment 1: Hearing File Index Attachment 2: Affidavit of Michael Wentzel
ATTACHMENT 1 SEABROOK LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Update 1-May 3, 2012 ID #
Accession Number Document Date Title ML101590098 05/25/2010 Seabrook Station - License Renewal Application, Volume I.
NRC000312 ML101590101 05/25/2010 Seabrook Station - License Renewal Application, Volume II.
NRC000313 ML101590091 05/25/2010 Seabrook Station - License Renewal Application, Volume III.
NRC000314 ML102220571 08/10/2010 Seabrook Station License Renewal Process Overview and Scoping Public Meeting Slides.
NRC000315 ML12009A007 01/25/2012 Project Manager Change for the License Renewal of Seabrook Station.
NRC000316 ML12080A137 03/19/2012 Seabrook Station, Supplement 2 to Severe Accident Mitigation Alternatives Analysis, License Renewal Application.
NRC000317 ML12066A139 03/20/2012 Summary of Telephone Conference Call Held on March 1, 2012 Between the NRC and NextEra Energy Seabrook LLC., Concerning the DRAI Pertaining to the Seabrook Station, LRA Environmental Review (TAC NO. ME3959).
NRC000318
ATTACHMENT 1 SEABROOK LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Update 1-May 3, 2012 ID #
Accession Number Document Date Title ML12074A096 03/22/2012 Schedule Revision for the Environmental Review of the Seabrook Station License Renewal Application (TAC NO. ME3959).
NRC000319 ML120860049 03/23/2012 04/23/2012 Corrected Notice of Forthcoming Meeting with NextEra Energy Seabrook, LLC (NextEra) Regarding Seabrook Station Concrete Degradation.
NRC000320 ML121070659 03/23/2012 04/23/2012 Revised Notice of Forthcoming Meeting with NextEra Energy Seabrook, LLC Regarding Seabrook Station Concrete Degradation.
NRC000321 ML113360175 03/23/2012 04/23/2012-Notice of Forthcoming Meeting with Nextera Energy Seabrook, LLC, (Nextera) Regarding Seabrook Station Concrete Degradation.
NRC000322 ML120870217 03/23/2012 04/23/2012-Revised Notice of Forthcoming Meeting with Nextera Energy Seabrook, LLC (Nextera) Regarding Seabrook Station Concrete Degradation.
NRC000323 ML12054A766 03/26/2012 022312, Telecon Summary Between NRC and NextEra Seabrook, Discussing RAIs Response (TAC No. ME4028).
NRC000324 ML12094A364 03/30/2012 Seabrook Station, Response to Request for Additional Information NextEra Energy Seabrook License Renewal Application Supplemental Response - Alkali Silica Reaction (ASR).
NRC000325
Attachment 2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
NextEra Energy Seabrook, LLC ) Docket No. 50-443-LR
)
(Seabrook Station, Unit 1) ) ASLBP No. 10-906-02-LR-BD01
)
AFFIDAVIT OF MICHAEL WENTZEL CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(b)
I, Michael Wentzel, do hereby state as follows:
- 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Seabrook Station, Unit 1, license renewal application (LRA).
Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
- 2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed in the attached Initial Disclosures and that the disclosures are accurate and complete for documents identified as of April 15, 2012.
- 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
Executed in Accord with 10 C.F.R. § 2.304(d)
Michael Wentzel Executed in Rockville, Maryland this 3rd day of May, 2012
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
NEXTERA ENERGY SEABROOK, LLC ) Docket No. 50-443-LR
)
(Seabrook Station, Unit 1) ) ASLBP No. 10-905-02-LR-BD01
)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing letter from Mary B. Spencer to the Board, dated May 3, 2012; Attachment 1 - Seabrook License Renewal Hearing File Index Initial Disclosures; - Affidavit of Michael Wentzel Concerning Mandatory Disclosure Requirement of 10 C.F.R. § 2.336(b), have been served upon the following by the Electronic Information Exchange, this 3rd day of May, 2012.
Administrative Judge Paul S. Ryerson, Chair Atomic Safety and Licensing Board Office of Commission Appellate Mail Stop - T-3 F23 Adjudication U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mail Stop - O-16G4 E-mail: Paul.Ryerson@nrc.gov Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Administrative Judge Dr. Michael F. Kennedy Office of the Secretary Atomic Safety and Licensing Board Attn: Rulemakings and Adjudications Staff Mail Stop - T-3 F23 Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: Michael.Kennedy@nrc.gov E-mail: HEARINGDOCKET@nrc.gov Administrative Judge Anne Siarnacki, Law Clerk Dr. Richard E. Wardwell Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: Anne.Siarnacki@nrc.gov E-mail: Richard.Wardwell@nrc.gov
Steven Hamrick, Esq.
NextEra Energy Seabrook, LLC David R. Lewis, Esq.
801 Pennsylvania Ave NW Suite 220 Pillsbury, Winthrop, Shaw, Pittman, LLP Washington, DC 20004 2300 N Street, NW E-mail: Steven.hamrick@fpl.com Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com Raymond Shadis Friends of the Coast Mitchell Ross, Esq.
New England Coalition James Petro, Esq.
Post Office Box 98 NextEra Energy Seabrook, LLC Edgecomb, Maine 04556 700 Universe Boulevard E-mail: shadis@prexar.com Juno Beach, FL 33408 E-mail: mitch.ross@fpl.com James.petro@fpl.com Matthew Brock Assistant Attorney General Environmental Protection Division Office of the Attorney General One Ashburton Place, 18th Floor Boston, Massachusetts 02108 E-mail: matthew.brock@state.ma.us Signed (electronically) by