TR-629, Rev. 0, Oyster Creek Generating Station, Development of Evacuation Time Estimates, Final Report. Page H-1 Through Page H-39
ML14101A179
Person / Time
Site: Oyster Creek
Issue date: 03/20/2014
From:
KLD Engineering, PC
To:
Exelon Generation Co, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RA-14-033, TMI-14-048 TR-629, Rev 0
Download: ML14101A179 (40)


Text

APPENDIX HEvacuation Regions H. EVACUATION REGIONSThis appendix presents the evacuation percentages for each Evacuation Region (Table H-i) andmaps of all Evacuation Regions (Figure H-1 through Figure H-36). The percentages presented inTable H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown inFigure 2-1.Note the baseline ETE study assumes 20 percent of households will not comply with the shelteradvisory, as per Section 2.5.2 of NUREG/CR-7002.

Oyster Creek Generating StationEvacuation Time EstimateH-1KLD Engineering, P.C.Rev. 0 Table H-1. Percent of ERPA Population Evacuating for Each RegionRegion Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20R01 2-Mile Ring 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%R02 5-Mile Ring 20% 20% 20% 20% 20% 20% 20% 20% 20%Rnfl FIlI FP7ERPARegionR04ROSR06R07ROBR09RIOR11R12......Direction 1 2 3Toward.NNW, N20NNE20NE, ENE20E, ESE, SE20SSE, SSSWSW, WSWW, WNW20NW204 5 6 74 5 6 720% 20%20%20% 20%20% 20% 20%20% 20% 20%20% 20% 20%20% 20% 20% 20%89101112131415 , 16 17 18 1 19 2020% M 20% 20%2 20% 20% 20% 20% 2 20% 20%1 20%20% 1 20%20%20%20%20%20%20% 20%20%20% 20%20%20%20%20%20%20% 20%20%20% 20%20%20%20%20%20%20% 20%20%20% 20% 20%20% 20%20%20% 20%2%0% 20% 2020% 20% 20%20%20% 20%20%20%20%20%20%20% 20%I I 4.-4 I I20%20% 20% 20%20% 20%20%20%20%20%20%20% 20%20% 20% 20% 20% I 20% 20% 20% 20% 20% 20% 20% 2 0 20% 20" 20%20%20%20%20%20%20%20%20%20%20%20%20%20% 20%20% 20% 20% 20%20%20%20%20%20%20% I 20%20% 20% I20% 20%RegionR13R14R15R16R17WindDirection Toward:NNNEERPA1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 2020% 20% 20% 20% 20% 20% 20%i_2%20% 204% 20% 20% 20%20% 20% 20% 20 0%2%02% 2%20% 20% 20% 20% 20% 20% 20%20%20%20%20%200%

% 0% 20NEENE, EESE, SEOyster Creek Generating StationEvacuation Time EstimateH-2KLD Engineering, P.C.Rev. 0 ERPARegion Description Twr: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20R20 20%R23 W 20% 20% 20% 20% 20% 20% 20% 20%R24 WNW 20% 20% 20% 20% 20% 20% 20% 20%R25 NW 20% 20% 20% 20% 20% 20% 20% 20%R26 NNW 20% 20% 20% 20% 20% 20%Wind ERPARegion Direction______

__ _ _ Toward: 1 2 3 7 8 9 10 11 12 13 14 15 16 178 19 2R27 5-Mile Ring 20% 2%20% 20% 20% 20% 20% 20% 20%202%R220 %S, S 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%20%2092%N2%E0%20%

20% 20% 20% 20% 20% 20% 20% 20 2%2%2%R32 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%2032%30%20S2%W0%20%

20% 20% 20% 20% 20% 20% 20%202%R34 SW, WSW 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%R35 W, WNW 20% 20% 20% 2 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%R36 NW 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%ERPA(s) Shelter-in-Place Oyster Creek Generating StationEvacuation Time EstimateH-3KLD Engineering, P.C.Rev. 0 Figure H-1. Region R01Oyster Creek Generating StationEvacuation Time EstimateH-4KLD Engineering, P.C.Rev. 0 Figure H-2. Region R02Oyster Creek Generating StationEvacuation Time EstimateH-5KLD Engineering, P.C.Rev. 0 Figure H-3. Region R03Oyster Creek Generating StationEvacuation Time EstimateH-6KLD Engineering, P.C.Rev. 0 Figure H-4. Region R04Oyster Creek Generating StationEvacuation Time EstimateH-7KLD Engineering, P.C.Rev. 0 Figure H-5. Region ROSOyster Creek Generating StationEvacuation Time EstimateH-8KLD Engineering, P.C.Rev. 0 Figure H-6. Region R06Oyster Creek Generating StationEvacuation Time EstimateH-9KLD Engineering, P.C.Rev. 0 Figure H-7. Region R07Oyster Creek Generating StationEvacuation Time EstimateH-10KLD Engineering, P.C.Rev. 0 Figure H-8. Region ROBOyster Creek Generating StationEvacuation Time EstimateH-11KLD Engineering, P.C.Rev. 0 Figure H-9. Region R09H-12 KLD Engineering, P.C.Oyster Creek Generating StationEvacuation Time EstimateH-12KLD Engineering, P.C.Rev. 0 Figure H-10. Region RIOOyster Creek Generating StationEvacuation Time EstimateH-13KLD Engineering, P.C.Rev. 0 Figure H-11. Region RllOyster Creek Generating StationEvacuation Time EstimateH-14KLD Engineering, P.C.Rev. 0 Figure H-12. Region R12Oyster Creek Generating StationEvacuation Time EstimateH-15KLD Engineering, P.C.Rev. 0 Figure H-13. Region R13Oyster Creek Generating StationEvacuation Time EstimateH-16KLD Engineering, P.C.Rev. 0 Figure H-14. Region R14Oyster Creek Generating StationEvacuation Time EstimateH-17KLD Engineering, P.C.Rev. 0 Figure H-15. Region R15Oyster Creek Generating StationEvacuation Time EstimateH-18KLD Engineering, P.C.Rev. 0 Figure H-16. Region R16Oyster Creek Generating StationEvacuation Time EstimateH-19KLD Engineering, P.C.Rev. 0 IIFigure H-17. Region R17Oyster Creek Generating Station H-20Evacuation Time EstimateKLD Engineering, P.C.Rev. 0 Figure H-18. Region R18Oyster Creek Generating Station H-21Evacuation Time EstimateKLD Engineering, P.C.Rev. 0 Figure H-19. Region R19Oyster Creek Generating StationEvacuation Time EstimateH-22KLD Engineering, P.C.Rev. 0 Figure H-20. Region R20Oyster Creek Generating Station H-23Evacuation Time EstimateKLD Engineering, P.C.Rev. 0 Figure H-21. Region R21Oyster Creek Generating StationEvacuation Time EstimateH-24KLD Engineering, P.C.Rev. 0 Figure H-22. Region R22Oyster Creek Generating StationEvacuation Time EstimateH-25KLD Engineering, P.C.Rev. 0 Figure H-23. Region R23Oyster Creek Generating StationEvacuation Time EstimateH-26KLD Engineering, P.C.Rev. 0 Figure H-24. Region R24Oyster Creek Generating StationEvacuation Time EstimateH-27KLD Engineering, P.C.Rev. 0 Figure H-25. Region R25Oyster Creek Generating StationEvacuation Time EstimateH-28KLD Engineering, P.C.Rev. 0 Figure H-26. Region R26Oyster Creek Generating StationEvacuation Time EstimateH-29KLD Engineering, P.C.Rev. 0 Figure H-27. Region R27Oyster Creek Generating StationEvacuation Time EstimateH-30KLD Engineering, P.C.Rev. 0 Figure H-28. Region R28Oyster Creek Generating StationEvacuation Time EstimateH-31KLD Engineering, P.C.Rev. 0 Figure H-29. Region R29Oyster Creek Generating StationEvacuation Time EstimateH-32KLD Engineering, P.C.Rev. 0 Figure H-30. Region R30Oyster Creek Generating StationEvacuation Time EstimateH-33KLD Engineering, P.C.Rev. 0 Figure H-31. Region R31Oyster Creek Generating StationEvacuation Time EstimateH-34KLD Engineering, P.C.Rev. 0 Figure H-32. Region R32Oyster Creek Generating StationEvacuation Time EstimateH-35KLD Engineering, P.C.Rev. 0 IIIFigure H-33. Region R33Oyster Creek Generating StationEvacuation Time EstimateH-36KLD Engineering, P.C.Rev. 0 Figure H-34. Region R34Oyster Creek Generating StationEvacuation Time EstimateH-37KLD Engineering, P.C.Rev. 0 IIFigure H-35. Region R35Oyster Creek Generating StationEvacuation Time EstimateH-38KLD Engineering, P.C.Rev. 0 Figure H-36. Region R36Oyster Creek Generating StationEvacuation Time EstimateH-39KLD Engineering, P.C.Rev. 0