RA-14-033, TR-629, Rev. 0, Oyster Creek Generating Station, Development of Evacuation Time Estimates, Final Report. Page H-1 Through Page H-39

From kanterella
Jump to navigation Jump to search
TR-629, Rev. 0, Oyster Creek Generating Station, Development of Evacuation Time Estimates, Final Report. Page H-1 Through Page H-39
ML14101A179
Person / Time
Site: Oyster Creek
Issue date: 03/20/2014
From:
KLD Engineering, PC
To:
Exelon Generation Co, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RA-14-033, TMI-14-048 TR-629, Rev 0
Download: ML14101A179 (40)


Text

APPENDIX H Evacuation Regions H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i) and maps of all Evacuation Regions (Figure H-1 through Figure H-36). The percentages presented in Table H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Oyster Creek Generating Station Evacuation Time Estimate H-1 KLD Engineering, P.C.Rev. 0 Table H-1. Percent of ERPA Population Evacuating for Each Region Region Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 R01 2-Mile Ring 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%R02 5-Mile Ring 20% 20% 20% 20% 20% 20% 20% 20% 20%Rnfl FIlI FP7 ERPA Region R04 ROS R06 R07 ROB R09 RIO R11 R12......Direction 1 2 3 Toward.NNW, N20 NNE20 NE, ENE20 E, ESE, SE20 SSE, S SSW SW, WSW W, WNW20 NW20 4 5 6 7 4 5 6 7 20% 20%20%20% 20%20% 20% 20%20% 20% 20%20% 20% 20%20% 20% 20% 20%8 9 10 11 12 13 14 15 , 16 17 18 1 19 20 20% M 20% 20%2 20% 20% 20% 20% 2 20% 20%1 20%20% 1 20%20%20%20%20%20%20% 20%20%20% 20%20%20%20%20%20%20% 20%20%20% 20%20%20%20%20%20%20% 20%20%20% 20% 20%20% 20%20%20% 20%2%0% 20% 20 20% 20% 20%20%20% 20%20%20%20%20%20%20% 20%I I 4.-4 I I 20%20% 20% 20%20% 20%20%20%20%20%20%20% 20%20% 20% 20% 20% I 20% 20% 20% 20% 20% 20% 20% 2 0 20% 20" 20%20%20%20%20%20%20%20%20%20%20%20%20%20% 20%20% 20% 20% 20%20%20%20%20%20%20% I 20%20% 20% I20% 20%Region R13 R14 R15 R16 R17 Wind Direction Toward: N NNE ERPA 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 20% 20% 20% 20% 20% 20% 20%i_2%20% 204% 20% 20% 20%20% 20% 20% 20 0%2%0 2% 2%20% 20% 20% 20% 20% 20% 20%20%20%20%20%200%

% 0% 20 NE ENE, E ESE, SE Oyster Creek Generating Station Evacuation Time Estimate H-2 KLD Engineering, P.C.Rev. 0 ERPA Region Description Twr: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 R20 20%R23 W 20% 20% 20% 20% 20% 20% 20% 20%R24 WNW 20% 20% 20% 20% 20% 20% 20% 20%R25 NW 20% 20% 20% 20% 20% 20% 20% 20%R26 NNW 20% 20% 20% 20% 20% 20%Wind ERPA Region Direction______

__ _ _ Toward: 1 2 3 7 8 9 10 11 12 13 14 15 16 178 19 2 R27 5-Mile Ring 20% 2%20% 20% 20% 20% 20% 20% 20%202%R220 %S, S 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%20%2092%N2%E0%20%

20% 20% 20% 20% 20% 20% 20% 20 2%2%2%R32 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%2032%30%20S2%W0%20%

20% 20% 20% 20% 20% 20% 20%202%R34 SW, WSW 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%R35 W, WNW 20% 20% 20% 2 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%R36 NW 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%ERPA(s) Shelter-in-Place Oyster Creek Generating Station Evacuation Time Estimate H-3 KLD Engineering, P.C.Rev. 0 Figure H-1. Region R01 Oyster Creek Generating Station Evacuation Time Estimate H-4 KLD Engineering, P.C.Rev. 0 Figure H-2. Region R02 Oyster Creek Generating Station Evacuation Time Estimate H-5 KLD Engineering, P.C.Rev. 0 Figure H-3. Region R03 Oyster Creek Generating Station Evacuation Time Estimate H-6 KLD Engineering, P.C.Rev. 0 Figure H-4. Region R04 Oyster Creek Generating Station Evacuation Time Estimate H-7 KLD Engineering, P.C.Rev. 0 Figure H-5. Region ROS Oyster Creek Generating Station Evacuation Time Estimate H-8 KLD Engineering, P.C.Rev. 0 Figure H-6. Region R06 Oyster Creek Generating Station Evacuation Time Estimate H-9 KLD Engineering, P.C.Rev. 0 Figure H-7. Region R07 Oyster Creek Generating Station Evacuation Time Estimate H-10 KLD Engineering, P.C.Rev. 0 Figure H-8. Region ROB Oyster Creek Generating Station Evacuation Time Estimate H-11 KLD Engineering, P.C.Rev. 0 Figure H-9. Region R09 H-12 KLD Engineering, P.C.Oyster Creek Generating Station Evacuation Time Estimate H-12 KLD Engineering, P.C.Rev. 0 Figure H-10. Region RIO Oyster Creek Generating Station Evacuation Time Estimate H-13 KLD Engineering, P.C.Rev. 0 Figure H-11. Region Rll Oyster Creek Generating Station Evacuation Time Estimate H-14 KLD Engineering, P.C.Rev. 0 Figure H-12. Region R12 Oyster Creek Generating Station Evacuation Time Estimate H-15 KLD Engineering, P.C.Rev. 0 Figure H-13. Region R13 Oyster Creek Generating Station Evacuation Time Estimate H-16 KLD Engineering, P.C.Rev. 0 Figure H-14. Region R14 Oyster Creek Generating Station Evacuation Time Estimate H-17 KLD Engineering, P.C.Rev. 0 Figure H-15. Region R15 Oyster Creek Generating Station Evacuation Time Estimate H-18 KLD Engineering, P.C.Rev. 0 Figure H-16. Region R16 Oyster Creek Generating Station Evacuation Time Estimate H-19 KLD Engineering, P.C.Rev. 0 I I Figure H-17. Region R17 Oyster Creek Generating Station H-20 Evacuation Time Estimate KLD Engineering, P.C.Rev. 0 Figure H-18. Region R18 Oyster Creek Generating Station H-21 Evacuation Time Estimate KLD Engineering, P.C.Rev. 0 Figure H-19. Region R19 Oyster Creek Generating Station Evacuation Time Estimate H-22 KLD Engineering, P.C.Rev. 0 Figure H-20. Region R20 Oyster Creek Generating Station H-23 Evacuation Time Estimate KLD Engineering, P.C.Rev. 0 Figure H-21. Region R21 Oyster Creek Generating Station Evacuation Time Estimate H-24 KLD Engineering, P.C.Rev. 0 Figure H-22. Region R22 Oyster Creek Generating Station Evacuation Time Estimate H-25 KLD Engineering, P.C.Rev. 0 Figure H-23. Region R23 Oyster Creek Generating Station Evacuation Time Estimate H-26 KLD Engineering, P.C.Rev. 0 Figure H-24. Region R24 Oyster Creek Generating Station Evacuation Time Estimate H-27 KLD Engineering, P.C.Rev. 0 Figure H-25. Region R25 Oyster Creek Generating Station Evacuation Time Estimate H-28 KLD Engineering, P.C.Rev. 0 Figure H-26. Region R26 Oyster Creek Generating Station Evacuation Time Estimate H-29 KLD Engineering, P.C.Rev. 0 Figure H-27. Region R27 Oyster Creek Generating Station Evacuation Time Estimate H-30 KLD Engineering, P.C.Rev. 0 Figure H-28. Region R28 Oyster Creek Generating Station Evacuation Time Estimate H-31 KLD Engineering, P.C.Rev. 0 Figure H-29. Region R29 Oyster Creek Generating Station Evacuation Time Estimate H-32 KLD Engineering, P.C.Rev. 0 Figure H-30. Region R30 Oyster Creek Generating Station Evacuation Time Estimate H-33 KLD Engineering, P.C.Rev. 0 Figure H-31. Region R31 Oyster Creek Generating Station Evacuation Time Estimate H-34 KLD Engineering, P.C.Rev. 0 Figure H-32. Region R32 Oyster Creek Generating Station Evacuation Time Estimate H-35 KLD Engineering, P.C.Rev. 0 I I I Figure H-33. Region R33 Oyster Creek Generating Station Evacuation Time Estimate H-36 KLD Engineering, P.C.Rev. 0 Figure H-34. Region R34 Oyster Creek Generating Station Evacuation Time Estimate H-37 KLD Engineering, P.C.Rev. 0 I I Figure H-35. Region R35 Oyster Creek Generating Station Evacuation Time Estimate H-38 KLD Engineering, P.C.Rev. 0 Figure H-36. Region R36 Oyster Creek Generating Station Evacuation Time Estimate H-39 KLD Engineering, P.C.Rev. 0