05000440/FIN-2011004-04 | 2011Q3 | | Failure to Provide Complete and Accurate Information |
05000440/FIN-2011004-01 | 2011Q3 | H.14 | Failure to Correctly Assess Risk During \'A\' ESW Pump Maintenance Activities |
05000440/FIN-2011004-02 | 2011Q3 | P.3 | Failure to Verify Radiological Conditions Prior to Entering High Radiation Areas |
05000440/FIN-2011004-03 | 2011Q3 | H.7 | Failure to Accurately Assess Occupational Dose |
05000440/FIN-2011008-01 | 2011Q4 | | Failure to Adequately Protect Safety Related Equipment from Internal Flooding |
05000440/FIN-2011008-03 | 2011Q4 | P.3 | Failure to Test Safety-Related Contactors at Degraded Voltage Conditions |
05000440/FIN-2011008-02 | 2011Q4 | H.7 | Inadequate Control Circuit Voltage Calculation for Safety- Related Motor Starter Contactors |
05000440/FIN-2011005-06 | 2011Q4 | H.2 | Failure to Perform Adequate Evaluation of Crane Support Structure Elements |
05000440/FIN-2011005-05 | 2011Q4 | | Diesel Generator Rooms\\\' Fire Protection System Concern |
05000440/FIN-2011005-04 | 2011Q4 | P.2 | Failure To Maintain The Plant Underdrain System Within USAR Described Capabilities |
05000440/FIN-2011005-03 | 2011Q4 | H.14 | Failure To Establish A Procedure To Perfrom Maintenance On Safety-Related Equipment |
05000440/FIN-2011005-02 | 2011Q4 | | Failure To Comply With TS 5.5.11, TS Bases Control Program |
05000440/FIN-2011008-04 | 2011Q4 | | Failure to Report Unanalyzed Condition Related to Internal Flooding |
05000440/FIN-2011005-01 | 2011Q4 | | Failure To Comply With TS 5.5.11, TS Bases Control Program |
05000440/FIN-2012405-01 | 2012Q1 | | Security |
05000440/FIN-2012002-01 | 2012Q1 | H.5 | Reactor Manual Scram Associated With Inadequate Maintenance Risk Evaluation |
05000440/FIN-2012003-01 | 2012Q2 | H.2 | Failure To Follow Operations Procedures |
05000440/FIN-2012003-02 | 2012Q2 | P.5 | Failure To Appropriately Control Access To A Locked High Radiation Area |
05000440/FIN-2012003-03 | 2012Q2 | H.2 H.11 | Inadequate Lift Plan Causes Lifting Rig Failure |
05000440/FIN-2012008-01 | 2012Q2 | | Failure to Implement Transient Combustible Program |
05000440/FIN-2012008-02 | 2012Q2 | | Failure to Ensure Design Spray Density is Achieved |
05000440/FIN-2012008-03 | 2012Q2 | P.5 | Failure to Ensure Sprinkler Piping Could Be Drained |
05000440/FIN-2012008-04 | 2012Q2 | P.6 | Failure to Install Sequential Timing Device for Fire Pumps |
05000440/FIN-2012008-05 | 2012Q2 | P.6 | Failure to Provide Full Area Detection |