Updated Inspection Plan for Turkey Point Nuclear Generating Station, Unit 3 and Unit 4 - (Report 05000250/2017005 and 05000251/2017005)
ML17234A358
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/22/2017
From: Suggs L B
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2017005
Download: ML17234A358 (6)


Text

August 22, 2017

Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd. Juno Beach, FL 33408

SUBJECT: UPDATED INSPECTION PLAN FOR TURKEY POINT NUCLEAR GENERATING STATION, UNIT 3 AND UNIT 4 - (REPORT 05000250/2017005 AND 05000251/2017005)

Dear Mr. Nazar:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Turkey Point Nuclear Generating Station Unit 3 and Unit 4. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. The NRC plans on conducting one non-routine inspection per Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4539 with any questions you have regarding this letter.

Sincerely,/RA/

LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Turkey Point Inspection/Activity Plan (09/01/2017 - 06/30/2019) cc: Distribution via Listserv

ML OFFICE RII:DRP RII:DRP NAME LPressley LSuggs DATE 8/16/2017 8/21/2017 Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteTurkey PointInspection / Activity Plan09/01/2017-06/30/2019Page 1 of 308/18/2017 15:02:28OL RQ-REQUAL INSPECTION23, 4IPLicensed Operator Requalification Program7111111B08/28/201709/01/2017OL EXAM-INITIAL LICENSE EXAM PREP33 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIESV2349209/18/201709/22/2017RP-RP OCCUPATIONAL INSPECTION WEEK 133, 4IPRadiological Hazard Assessment and Exposure Controls71124.0110/02/201710/06/20173, 4IPOccupational ALARA Planning and Controls71124.0210/02/201710/06/20173, 4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/02/201710/06/20173, 4IPOccupational Dose Assessment71124.0410/02/201710/06/20173, 4IPRadiation Monitoring Instrumentation71124.0510/02/201710/06/20173, 4IPPerformance Indicator Verification7115110/02/201710/06/2017ISI-UNIT 4 IN-SERVICE INSPECTION14IPInservice Inspection Activities - PWR7111108P10/09/201710/13/2017RP-RP OCCUPATIONAL INSPECTION WEEK 223, 4IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/201710/20/20173, 4IPOccupational ALARA Planning and Controls71124.0210/16/201710/20/20173, 4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/16/201710/20/20173, 4IPOccupational Dose Assessment71124.0410/16/201710/20/20173, 4IPRadiation Monitoring Instrumentation71124.0510/16/201710/20/20173, 4IPPerformance Indicator Verification7115110/16/201710/20/2017OL EXAM-INITIAL LICENSE EXAM33 TURKEY POINT/MAY2017 INITIAL EXAM AT POWER FACILITIESV2349210/23/201711/10/2017EP-EP PROGRAM INSPECTION33, 4IPAlert and Notification System Testing711140201/22/201801/26/20183, 4IPEmergency Preparedness Organization Staffing and Augmentation System711140301/22/201801/26/20183, 4IPEmergency Action Level and Emergency Plan Changes711140401/22/201801/26/20183, 4IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140501/22/201801/26/20183, 4IPPerformance Indicator Verification7115101/22/201801/26/2018MODS-PLANT MODIFICATIONS INSPECTION33, 4IPEvaluations of Changes, Tests, and Experiments7111117T02/05/201802/09/2018RP-RP PUBLIC INSPECTION23, 4IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/12/201802/16/20183, 4IPRadiological Environmental Monitoring Program71124.0702/12/201802/16/20183, 4IPOccupational Exposure Control Effectiveness71151-OR0102/12/201802/16/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteTurkey PointInspection / Activity Plan09/01/2017-06/30/2019Page 2 of 308/18/2017 15:02:28RP-RP PUBLIC INSPECTION23, 4IPRETS/ODCM Radiological Effluent Occurrences71151-PR0102/12/201802/16/2018TI-191-MITIGATING STRATEGIES33, 4IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19103/05/201803/09/2018PI&R-PROBLEM IDENTIFICATION AND RESOLUTION43, 4IPProblem Identification and Resolution71152B08/06/201808/10/20183, 4IPProblem Identification and Resolution7115208/20/201808/24/2018ISI-UNIT 3 IN-SERVICE INSPECTION13 IPInservice Inspection Activities - PWR7111108P10/08/201810/12/2018SGISI-UNIT 3 SG IN-SERVICE INSPECTION13 IPInservice Inspection Activities - PWR7111108P10/08/201810/12/2018RP-RAD HAZARD AND TRANSPORTATION23, 4IPRadiological Hazard Assessment and Exposure Controls71124.0110/15/201810/19/20183, 4IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/15/201810/19/2018OL EXAM-INITIAL LICENSE EXAM PREP33 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIESV2351712/03/201812/07/2018OL EXAM-INITIAL LICENSE EXAM33 TURKEY POINT / JANUARY 2019 INITIAL EXAM AT POWER FACLITIESV2351701/07/201901/25/2019EP-EP EXERCISE INSPECTION33, 4IPExercise Evaluation711140102/18/201902/22/20193, 4IPEmergency Action Level and Emergency Plan Changes711140402/18/201902/22/20193, 4IPExercise Evaluation - Scenario Review711140802/18/201902/22/20193, 4IPPerformance Indicator Verification7115102/18/201902/22/2019ISI-UNIT 4 IN-SERVICE INSPECTION14IPInservice Inspection Activities - PWR7111108P03/18/201903/22/2019RP-RP OCCUPATIONAL WEEK 123, 4IPRadiological Hazard Assessment and Exposure Controls71124.0103/18/201903/22/20193, 4IPOccupational ALARA Planning and Controls71124.0203/18/201903/22/20193, 4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/18/201903/22/20193, 4IPOccupational Dose Assessment71124.0403/18/201903/22/20193, 4IPRadiation Monitoring Instrumentation71124.0503/18/201903/22/20193, 4IPOccupational Exposure Control Effectiveness71151-OR0103/18/201903/22/20193, 4IPRETS/ODCM Radiological Effluent Occurrences71151-PR0103/18/201903/22/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteTurkey PointInspection / Activity Plan09/01/2017-06/30/2019Page 3 of 308/18/2017 15:02:28SGISI-UNIT 4 SG IN-SERVICE INSPECTION1 4IPInservice Inspection Activities - PWR7111108P03/18/201903/22/2019RP-RP OCCUPATIONAL WEEK 23 3, 4IPRadiological Hazard Assessment and Exposure Controls71124.0104/15/201904/19/2019 3, 4IPOccupational ALARA Planning and Controls71124.0204/15/201904/19/2019 3, 4IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/15/201904/19/2019 3, 4IPOccupational Dose Assessment71124.0404/15/201904/19/2019 3, 4IPRadiation Monitoring Instrumentation71124.0504/15/201904/19/2019 3, 4IPOccupational Exposure Control Effectiveness71151-OR0104/15/201904/19/2019 3, 4IPRETS/ODCM Radiological Effluent Occurrences71151-PR0104/15/201904/19/2019EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR3 3, 4IPDesign Bases Assurance Inspection (Programs)7111121N04/22/201904/26/2019 3, 4IPDesign Bases Assurance Inspection (Programs)7111121N05/13/201905/17/2019 3, 4IPDesign Bases Assurance Inspection (Programs)7111121N06/03/201906/07/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.