|
---|
Category:ACRS Summary Report
MONTHYEARML17037C4771974-11-15015 November 1974 Letter Enclosing Supplement No. 1 to the Safety Evaluation Report for the Application for a Full-Term Operating License ML17037C2071974-09-25025 September 1974 Letter Responding to a September 17, 1974 Letter Requesting a Response to Two ACRS Identified Items Concerning Main Steam Isolation Valve Leakage and Inservice Inspection of the Reactor Pressure Vessel and Advising That Inform. ML17037C4801974-09-13013 September 1974 Letter Transmitting ACRS Report Dated September 10, 1974, on the Application for Conversion of the Provisional Operating License to a Full-Term Operating License for the Nine Mile Point Nuclear Station Unit ML17037C4901974-02-20020 February 1974 Letter Submitting Copy of Report of the Advisory Committee on Reactor Safeguards Dated February 12, 1974 on Expected Performance of General Electric 8x8 Fuel Design for Reload Use ML17037C3691971-03-12012 March 1971 Letter Responding to a February 11, 1971 Forwarding an ACRS Report Pertaining to the Request for an Increase from 1538 to 1850 Thermal Megawatts in the Licensed Power Level ML17037C3501970-06-19019 June 1970 Letter Authorizing the Return to Operation of Unit 1 in Accordance with Your Documented Program and Subject to Conditions Defined and Enclosing an ACRS Report Dated June 16, 1970 1974-09-25
[Table view] Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] |
Text
v'EB201974DocketNo.50-220M.agaraR)hawkPowerCorporationATlM:R.PhilipD.RaymondVicePresident-sneering300ErieBoulevardWestSyracuse,NewYork13202Gentlel1)en:AcopyofthereportoftheAdvisoryCommitteeonReactorSafeguardsdatedFebruary12,1974,isenclosedforyourinformation.ThereportreflectstheCoamhtee'sreviewofthedesignandexpectedperfora)anceofGenera1E1ectric8x8fuelbundlestobeusedinpart;ialandflQ1corereloadsforboilirgwaterreactorssuchasyourNineM.lePointNuclearStationUrd.tl.Youwillbeadvisedwhenwehaveconyletedourreviewofyourrequestforoperationwith8x8fuel.Sincerely,DonaldJ.SkovholtAssistantDirectorforOperatingReactorsDirectorateofLicensing
Enclosure:
ACHSReportRNDiggsNDubecc:Seenext;pagel4JinksBsch~f(ig)SKariSVargaHBoydECaseDistributionDocketFileAECPDRLocalPDRRPReadingBranchReadingJRBuchanan,OHNL93Abernathy,DTIEWNoore,LDTSkovholt,L:ORTJCarter,L:ORRO(3)OGCVStelloJGalloJSaltzmanFLIngramHINuellerJWagner,OCWOM.lier,DRAPCollins,L:OLBDLZiemann,L:ORBg2.82........(vec....--24-9i-'74-----,HMliggsIIIL-'.2/.S/74.,.....DLZien)ann....2i~SV>-----.SURHAMCWov3-..2llgi.'.74,'............FormhFC-318(Rev.9.53)LCM0240CRI3C@31311423I320204 II i;,'iagarnlfohawkPowerCorporationFebruary20,1974ccw/enclosure:J.BruceHacDonald,EsquireDeputyCommissionerandCounsel.NewYorkStateDepartmentofCommerceandCounseltotheAtomicEnergyCouncil99WashingtonAvenueAlbany,NewYork12210ArvinE.Upton,EsquireLeBoeuf,Larry,Leiby6HacRae.1757NStreet',N.W.Washington,D.C.20036AnthonyZ.Roisman,EsquireBerlin,RoismanandKessler1712NStreet,N.W.Washington,D.C.20036Hr.DonaldX.Gleason,ChairmanCountyOfficeBuilding/>6EastBridgeStreetOswego,NewYork13126Hr."RobertP.Jones,SupervisorTownofScribaR.D.II4Oswego,NewYork13126OswegoCityLibrary~~
s~
ADVISORYCOMMITTEEONREACTORSAFEGUARDSUNlTEDSTATESATOMlCENERGYCOMMlSSlONWASHINGTON,D.C.R054bFebruary12,1974HanorableDixyLeeRayChaiznsnU.S.AtaoiaEmmgyGmni'ssion545458dxJect:HEX'ORCCNGENEBALELECXREC8XSPGELXESX(ÃK)RHEZQADUSE'earDx'.BaysAtits166thmeeting,XhhemLxy7<<9,1974ttheAdvisoryCGHlAitteeanReactorSafeguazdscampletedagexxericreviewofthedesignandex.-pandpeeiarxtlaxxceofGeneralElectric8xSfuelbuncllestobesplayedinpartialandfullcarereloadsinboilingwaterreaclurs.Thesetopicswerediscussedatthe165thACRSmeetingonJanuary10-12,1974t555'te',,~,5574,andinDenver,Colorado,anJanuary24,1974.DuringitsravinestheOmmi.tteehadthebermCit.ofdiscussianswithrepresentativesoftheGenamlZXa~icGxnpxxzy,theAECRegu3atozyStaff,andofthedocu-maxtslistedbeld.TheGeneralElectricSxSfuelassalhlyconsistsof63fuelxoclsplusoneunfueled;water-fle@,spacex"~ptxxrexodinasctuareSx8bundlearraywithina-squaxmchannelbox.ThedesignofthefuelxcdsandfuelxcdbundleintheSxSreloadfuelassemblyis,exceptfardiffexencesinthelength.ofthefuelandgasplenam,thesameasinthe8x8fuelBSSHllblyused3Ilthe~6bo113LIlgwaterxitorconceptreferredtointheCaanittee'sn~ofSex~her21,1972.TheSxSfuelbundlesareinterchangeableinGeneralElectricboilingwaterreactorswiththepeeviouslyused7x7bundles.Xhgeneral,thethexualmarginstofueldamagedesignbasesaregreaterfarSxSfuelthanfar'x7fuel.%hedesignvalueafthelinearheatgemmationratefarnormalopexmtionis33.4kw/ftfarSxSfueland17.5to18.5lee/ftfar.7x7fuelspecificpowerisslightlygreaterfarthe8xSfuelthanforthe7x7fuel.TheGenera.ElectricCatapanybelievesthe3xeerlinearheatgenerationrateandslightlygreaterratioofcladtlxxc1cnesstoxaddietershouMresultinfeweefailuresinSxSftxelthanin7x7fuel.AlthoughthehyQraulicresistaxxceofSx8bunDesisslightlygreaterthanthatof7x7buxxllm,thethecal-hydraulicpex-faxmanceofboxeseitherpartiallyorfullyloadedwithSxSassembliesisnotchsgnldedrelativetocaresloadedwith7x7assemblies.
EmeableicyLee.RayFebruary12,1974SincetheU-235enrichnentsfortheindivMmQ.fuelrods,thenumberl~tlh~lllggtlhd,Ithratioaresimilax'ntheSxSand7x7designs,theneutnnicbehaviorofthetsmdesignsisnotsignificantlydiffanmt.TheintexnallylocatedwaterxodintheSxSdesignreducesxod-to-xodpowerpeaking.Sincethenextmaniaandthemal~rauLiccharacteristicsofSxSand7x7fuelhuxG.esaresimilar,thoraxbehaviorunderahnoxnsloperatianalt'\PlbWbl.Ih~fl'hdcantxolxoddrop,'uelhandling,andsteamlinebreakacx68entsarenatexitedtobesignificantlydifferentforthetwofueldesigns.II~51'WWW,'lkU'tV~h~waterreactors,andtheRegulatoryStaffhaveperfamtectanalysesofthebehaviorof8x8fuelinseveralmixedandfullyreloadedcca~undertxansientandaccidentcxmditions.TheseanalysesymBictthat,,farboilingwatermectxuwwhichhavejetpumps,thepeakcladtemperaturesduringapo.~~tedlarge-breakIQCAusingtheXnterimAcceptanceCriteriaaxelessforSxSthanfor7x7assariblies.ERwmrer,forlargepostulatedbreaksinnan-)etpumpplantsandfarsmallandintexaectiatesizebreaksfarallplants,thepr~x8peakcladtemperaturesareinthesamerangefarbothSxSa+i7x7fuel.Consequently,indivtitualreviewsbytheRegu-latoryStaffoftheequiperfarmmceofSxSreloadfuel,incluKLngplantmpecificsystemeffectsazxlanysignificantcorefuelloadLingil1bIIfhIfwHth8xSfueltodeteexninelimitsanreactoroperatingconditiorm.TheCce-mitteewishestobeirdhraedconcerningtheresultsofthesereviewsfortheinitialSxSfuelload:tngsineachoftheseveralGeneralElectricboilingwaterreactarproductlines.TheRegulatoryStaffplanstousetheresultsofrecentlycanductedN~~~8~~~I'llanalyticalnedelsfarSxBfuel.TheQanaitteewishestobekeptinfcemd.IlE!fS16andhun31eswhosedesignsbrac]setthedimensiansoftheSxSfuelandantheperfarmanceofcarescantainingmixbmesofassaablieswithdifferentrmobersandsizesoffuelrcds.Althoughmechanicaltestshavebeenperfaxned'an8xSfuelassembliesanRcampanentstodaaanstratetheirintegri.ty,additionalteststovex'ifyspacergridstrengthhavebeenrequestedbytheRegulatoryStaff.ThismattershouldberesolvedinaninersatisfactarytotheRecpQatoxyStaff.
~~lyRIMmableDixyLeeHayFehrum~12,1974TheAneealElectricCaqxmyhasplannedaprecgamofbothpre-andpost-inmHatianenauninatianstomonitortheperformanceof8xSfuel!!!!~!.1lprogramandwishestobekeptinformed.TheHegulatoryStaffiscurrentlyrevhm9xgthetreatment.ofuncextaintiesintheestablishmentandmmi;toringofoperatinglimitsfarboilingwaterreactors.TheCcxanitteewishestobekeptinfarneQ.He-evaluationofcareoperatinglimitswillbenecessaryasaresultoftherecentlygcanulgatedAccephmceCriteriaforEmergencyCoreCoolingSystems.TheGanmitteevrishestobekeptinfarrneci.The~tteebelievesthat,withduereganltotheabavecomments,incluQiLngtheindividualreloadreviewsbytheHegulatoryStaffwhichwilladdressspecificplantfeatures,theGenera.Electric8x8fuelassanbliesareacceptableforuseinthereloadofGeneralElectricboilingwaterxeactxam.&E.m.H.StrattonChaixaenStBefezencesattached.
HonorableDDTLeeRayPebruary12,1974203Q45.6."Dresden3NuclearPowerStation,SecondReloadLicenseSuhnittal",GeneralElectricCo.,NuclearPuelD@lartment,SepteInber1973@andSuppleIRRItAgRR%6her17~1973~SupplementB~DeceH58K'p1973SupplatentC,Decanber6,1973;SupplementD,Deliber17,1973;SupplementEcDe~Mr17'973'upplementPrJanuazp's1974'upplementG,Januaxy9~1974)SupplementH,January'23,1974"NineMilePointUnit1-SemndRefueling",P.D.RayIImdtoA.Giambusso,September14,1973'NineMi1ePointUnit1SafetyAnalysisforType5andType6ReloadPuelgNiagaraHat'uvr8cPower~aratiangOctober15,1973"NineMilePointUnitlrPartlcNan<<ProprietaryResponseandPart2,ProprietaryRespanse,"Jamlary15,1974MonticelloNuclearGeneratingPlalltgPexlIBnentPlantChangestoAccamncdateF~ilibriumCoreScramReactivityInsertianCharac-teristics",January23,1974NED0-20103,"QerumalDesignInfoxIoatianforGeneralElectricBoilingWaterReactorReloadFuelCamellcinginSpriIlg,'74",September1973H.E.Wi11iamsanaIldD.C.Ditmore,"Experiencewith.HWRFuel9hroughSeptarher1971",NED0-10505,May1972GEAP-4059,"VibrationofPuelRodsinP~elPlow",E.P.Quinn,July1962708Letter,J.A.HindstoV.Nmre,'ebruary4,1974,"P~lrietaryInfoxmation,SxSPuelWearTests"X~.JA,HindstoVMoorePehnlary41974SXSPue1Sur-veillancePIugramNEM-10735,"DensificationCansiderationsinHNRFuelDesignandPerfoxmallce",D.C.DitmareandRB.E13dns,Decaaber1972/Supplement2,"ResponsetoAECQuestions,NEW&-10735Apri11973"(Proprietary)gSupplement2,"ResponsetoAK'.Questions,NEDDY-10735Supplement1",May1973'Proprietary),Supplement3,"RespansetoAECQuestions,NEDH10735@Supplement1gJune,1973(Proprietary),Supplement4g"ResponsestoAECQuestionsNEXT-10735",tuly1973,(Proprietary)fSupplement5'g',DensifxcatiaIl.Consideratians1nHNRFuel'gJuly1973(Proprietary).gSUpplements6j7gaIKlSgFuelDensificatiaIlEffectsanGeneIzLElectricHoiUingWaterPpm~Fuel"~
a~'v~~
~~Q~Hceozab3aDixy'eeRayFebruary12,1974,References'contend)NEDO20181'uppl6fMlt1gDecember3t1973(Pxoprj~~)g~GAPIII"AJ4xM.forthePredictionofPelletConductanceinBNRFuelRods"10."TechnicalReportanDensificationofGm~ElectricReat'~Fuels",U.S~AtomicEntryCamaission,August23,1973,and"Supple>rent1totheTechnicalReportonDensificationofCanexalElectricReactorFuels",December14,197311."SensitivityStayon~6FuelBuntsResponsetoaPoshQatedIDGE,C.M.MaserandR.W.Grume,Deaeaher197312.NEIPr10801,"Mod~theE+/6Los~&DcelantAccident"CoreSprylyandBottxxnFloodix@HeatTransferEffectiveness",J..D.DuncanandJ.E.Leenaxd,'Maxch1973,and"ResponsetoAECRet:gmstforAdditionalInformationanNEDE-10801",May19739'mpa5.etary),13,.ME0-10993,"CoreSprayandBottcmFloodingEffectivenessinthe~6"gJ.D.DurbanandJ.E.Leceard,Segteaher197314."CoreTkmenal'AnalysesofaStainlessSteelCladHeaterRodBundle",C.M.userandR.W.Griebe,December197315."StatusRepI~'ntheGeneralElectricCompanySx8FuelAssembly",January18,1974,USAECRegu1atoryStaff16."TechnicalReportontheGeneralElectricOarttpanySxSFuelAssembly",February5,1974,USMCRegulatoryStaff~ff~~L~A 0