ML17311A154

From kanterella
Revision as of 06:57, 23 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Cooper, Submittal of Change to Emergency Plan Implementing Procedure
ML17311A154
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/01/2017
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2017090
Download: ML17311A154 (1)


Text

.. H Nebraska Public Power District NLS2017090 November 1, 2017 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

Dear Sii-or Madam:

50.54(q) The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.14, Stable Iodine Thyroid Blocking (KI) (Revision 22), and provide a summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP. This letter contains no commitments. If you have any questions regarding this submittal, please contact me at (402) 825-2788. Licensing Manager /bk

Attachment:

Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.14, Revision 22

Enclosure:

Emergency Plan Implementing Procedure 5.7.14, Revision 22 cc: Regional Administrator, w/ attachment and enclosure (2) USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment (enclosure per controlled document distribution) USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 /Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 wvvw.nppd.com