an Approach for Plant-Specific Risk-Informed Decisionmaking for Inservice Inspection of Piping
ML032510128
Person / Time
Issue date: 09/30/2003
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.178, Rev 1
Download: ML032510128 (33)


Regulatory guides are issued to describe and make available to the public such information as methods acceptable to the NRC staff for implementingspecific parts of the NRC's regulations, techniques used by the staff in evaluating specific problems or postulated accidents, and data needed by the NRCstaff in its review of applications for permits and licenses. Regulatory guides are not substitutes for regulations, and compliance with them is not required. Methods and solutions different from those set out in the guides will be acceptable if they provide a basis for the findings requisite to the issuance orcontinuance of a permit or license by the Commission.This guide was issued after consideration of comments received from the public. Comments and suggestions for improvements in these guides areencouraged at all times, and guides will be revised, as appropriate, to accommodate comments and to reflect new information or experience. Writtencomments may be submitted to the Rules and Directives Branch, ADM, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Regulatory guides are issued in ten broad divisions: 1, Power Reactors; 2, Research and Test Reactors; 3, Fuels and Materials Facilities; 4, Environmentaland Siting; 5, Materials and Plant Protection; 6, Products; 7, Transportation; 8, Occupational Health; 9, Antitrust and Financial Review; and 10, General. Single copies of regulatory guides (which may be reproduced) may be obtained free of charge by writing the Distribution Services Section, U.S. NuclearRegulatory Commission, Washington, DC 20555-0001, or by fax to (301)415-2289, or by email to DISTRIBUTION@NRC.GOV. Electronic copies of thisguide and other recently issued guides are available at NRC's home page at <WWW.NRC.GOV> through the Electronic Reading Room, Accession NumberML032510128.U.S. NUCLEAR REGULATORY COMMISSION Revision 1September 2003REGULATORY GUIDEOFFICE OF NUCLEAR REGULATORY RESEARCHREGULATORY GUIDE 1.178AN APPROACH FOR PLANT-SPECIFIC RISK-INFORMED DECISIONMAKING FOR INSERVICE INSPECTION OF PIPING

A. INTRODUCTION

During the last several years, both the U.S. Nuclear Regulatory Commission (NRC) and thenuclear industry have recognized that probabilistic risk assessment (PRA) has evolved to be more useful in supplementing traditional engineering approaches in reactor regulation. After the publication of its Policy Statement on the use of PRA in nuclear regulatory activities, the Commission directed the NRC

staff to develop a regulatory framework that incorporated risk insights. That framework was articulated in a November 27, 1995, paper to the Commission (SECY-95-280). This regulatory guide, which addresses inservice inspection (ISI) of piping, with its companion Standard Review Plan, Section 3.9.8 of NUREG-0800 (SRP Chapter 3.9.8), and other regulatory documents (Regulatory Guides 1.174, 1.175,

1.176, and 1.177; SRP Chapters 3.9.7, 16.1, and 19 ), implement, in part, the Commission's Policy Statement and the staff's framework for incorporating risk insights into the regulation of nuclear power plants.In September 1998, the Commission published a version of this regulatory guide for trial use. Asstated therein, that regulatory guide issued for trial use did not establish any final staff positions for purposes of the Backfit Rule, 10 CFR 50.109, and any changes to the regulatory guide prior to staff adoption in final form would not be considered to be backfits as defined in 10 CFR 50.109(a)(1). This was intended to ensure that the lessons learned from the subsequent regulatory review of industry methodologies and the pilot plant applications could be adequately addressed in this document and that the guidance is sufficient to enhance regulatory stability in the review, approval, and implementation of proposed RI-ISI programs.

1.178-2The NRC staff has approved two methods describing how risk-informed ISI programs canbe developed and implemented. One methodology (EPRI TR-112657) was developed by the Electric Power Research Institute (EPRI). The other methodology (WCAP-14572) was developed by the Westinghouse Owners Group (WOG). Regulatory Guide 1.178 (for trial use) was used to support the review and approval of the two industry-developed methodologies. Based on the experience during the review and approval of the industry methodologies and the review and approval of numerous plant-specific relief requests for inservice inspection programs, the NRC

staff is now issuing this updated version of this regulatory guide. While there has been a substantial effort to provide an opportunity for stakeholders in thismethodology to intereact with the staff in the development of this guide's revisions, the revisedguide was not issued in draft form in the manner that has normally been used for regulatory guides.

Rather, a more limited stakeholder's review was utilized, including a public meeting noticed onthe NRC web site. Prior to the public meeting, the draft of this guide was placed in ADAMS with a public notice identifying the ADAMS accession number. This approach was considered adequate since the revisions are generally editorial in nature and intended to either update certain information or to clarify language without substantial changes to the methodology itself. In addition, since this guide was first issued in 1998, it has been successfully used by the industry and staff in processing numerous requests by licensees to make risk-informed changes to inservice inspection programs. Until the risk-informed inservice inspection (RI-ISI) process is approved for generic use,the NRC staff anticipates that licensees will request changes to their ISI programs by requesting NRC approval of alternative inspection programs that meet the criteria of 10 CFR 50.55a(a)(3)(i)

in Section 50.55a, "Codes and Standards," of 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," providing an acceptable level of quality and safety. As always, licensees should identify how the chosen approach, methods, data, and criteria are appropriate for the decisions they need to make.This guide's principal focus is on the use of PRA findings and risk insights for decisions onchanges proposed to plants' inservice inspection programs for piping. Such changes include (butare not limited to) license amendments under 10 CFR 50.90, requests for the use of alternatives under 10 CFR 50.55a, and exemptions under 10 CFR 50.12. This regulatory guide describes methods acceptable to the NRC staff for integrating insights from PRA techniques with traditional engineering analyses into ISI programs for piping. BackgroundDuring recent years, both the NRC and the nuclear industry have recognized that PRA hasevolved to the point that it can be used increasingly as a tool in regulatory decisionmaking. In August 1995, the NRC adopted a Policy Statement regarding the expanded use of PRA. In part, the Policy Statement states that:The use of PRA technology should be increased in all regulatory matters to the extentsupported by the state of the art in PRA methods and data and in a manner that

1.178-3complements the deterministic approach and supports the NRC's traditional philosophy ofdefense in depth.PRA and associated analyses (e.g., sensitivity studies, uncertainty analyses, and importancemeasures) should be used in regulatory matters, where practical within the bounds of the state of-the-art, to reduce unnecessary conservatism associated with current regulatory requirements, regulatory guides, license commitments, and staff practices. Where appropriate, PRA should be used to support the proposal of additional regulatory requirements in accordance with 10 CFR 50.109 (Backfit Rule). Appropriate procedures for including PRA in the process for changing regulatory requirements should be developed and followed. It is, of course, understood that the intent of this policy is that existing rules and regulations be complied with unless these rules and regulations are revised.PRA evaluations in support of regulatory decisions should be as realistic as practicable andappropriate supporting data should be publicly available for review.The Commission's safety goals for nuclear power plants and subsidiary numericalobjectives are to be used with appropriate consideration of uncertainties in making regulatory judgments on the need for proposing and backfitting new generic requirements on nuclear power plant licensees.In its approval of the Policy Statement, the Commission articulated its expectation thatimplementation of the Policy Statement will improve the regulatory process in three areas:

foremost, through safety decisionmaking enhanced by the use of PRA insights, through more efficient use of agency resources, and through a reduction in unnecessary burdens on licensees.In parallel with the publication of the Policy Statement, the staff developed a regulatoryframework that incorporates risk insights. That framework was articulated in a paper (SECY-95-280) to the Commission. This regulatory guide, which addresses ISI programs of piping at nuclear power plants, is part of the implementation of the Commission's Policy Statementand the staff's framework for incorporating risk insights into the regulation of nuclear powerplants.While the conventional regulatory framework, based on traditional engineering criteria,continues to serve its purpose in ensuring the protection of public health and safety, the current information base contains insights gained from over 2500 reactor-years of plant operating experience and extensive research in the areas of material sciences, aging phenomena, and inspection techniques. This information, combined with modern risk assessment techniques and associated data, can be used to develop a more effective approach to ISI programs for piping. The current ISI requirements for piping components are found in 10 CFR 50.55a and theGeneral Design Criteria listed in Appendix A to 10 CFR Part 50. These requirements are throughout the General Design Criteria, such as in Criterion I, "Overall Requirements"; Criterion

1.178-4II, "Protection by Multiple Fission Product Barriers"; Criterion III, "Protection and ReactivityControl Systems"; and Criterion IV, "Fluid Systems."Section XI of the American Society of Mechanical Engineers Boiler and Pressure VesselCode (ASME B&PVC) is referenced by 10 CFR 50.55a, which addresses the codes and standards for design, fabrication, testing, and inspection of piping systems. The objective of the ISI program is to identify service-induced degradation that might lead to pipe leaks and ruptures, thereby meeting, in part, the requirements set in the General Design Criteria and 10 CFR 50.55

a. ISI

programs are intended to address all piping locations that are subject to degradation. Incorporating risk insights into the programs can focus inspections on the more important locations and reduce personnel exposure, while at the same time maintaining or improving public health and safety.

The justification for any reduction in the number of inspections should address the issue that an increase in leakage frequency or a loss of defense in depth should not result from decreases in the numbers of inspections. When categorizing piping segments in terms of their contribution to risk, it is theresponsibility of a licensee to ensure that the categorization of piping segments and the resulting inspection programs are consistent with the key principles and risk guidelines (e.g., core damage frequency (CDF) and large early release frequency (LERF)) addressed in Regulatory Guide 1.174.

This regulatory guide augments the guidance presented in Regulatory Guide 1.174 by providing guidance specific to incorporating risk insights to inservice inspection programs of piping. Purpose of the GuideConsistent with Regulatory Guide 1.174, this regulatory guide focuses on the use of PRAin support of a RI-ISI program. This guide provides guidance on acceptable approaches to meeting the existing Section XI requirements for the scope and frequency of inspection of ISI programs.

Its use by licensees is voluntary. Its principal focus is the use of PRA findings and risk insights for decisions on changes proposed to a plant's inspection program for piping. The current ISIprograms are performed in compliance with the requirements of 10 CFR 50.55a and with Section XI of the ASME Boiler and Pressure Vessel Code, which are part of the plant's licensing basis. This approach provides an acceptable level of quality and safety (per 10 CFR 50.55a(a)(3)(i)) by incorporating insights from probabilistic risk and traditional analysis calculations, supplemented with operating reactor data. Licensees who propose to apply RI-ISI programs would amend their final safety analysis report (FSAR, Sections 5.3.4 and 6.6) accordingly. A Standard Review Plan (SRP Chapter 3.9.8) has been prepared for use by the NRC staff in reviewing RI-ISI applications.Additional augmented inspection programs to address generic piping degradation problemshave been recommended by the NRC to preclude piping failure and implemented by the industry.

Notable examples of augmented programs for piping inspections include the following topics: intergranular stress corrosion cracking (IGSCC) of stainless steel piping in boilingwater reactors (BWRs) (Generic Letter 88-01), thermal fatigue (NRC Bulletins 88-08 and 88-11, NRC Information Notice 93-20), stress corrosion cracking in pressurized water reactors (PWRs) (IE Bulletin 79-17),

1.178-5 Service Water Integrity Program (NRC Generic Letter 89-13), flow accelerated corrosion (FAC) in the balance of plant for both PWRs and BWRs(NRC Generic Letter 89-08). Augmented programs have generally been developed to address observed degradation andthe inspections tend to be targeted at locations where the most severe effects are expected.

Selected augmented programs, or parts of the programs, may be incorporated into a RI-ISI

program provided that the licensee identifies and the staff approves the specific programs and program changes.

This document addresses risked-informed methods to develop, monitor, and update more efficient ISI programs for piping at a nuclear power facility. This guidance does not preclude other approaches for incorporating risk insights into the ISI programs. Licensees may propose other approaches for NRC consideration. It is intended that the methods presented in this guide be regarded as examples of acceptable practices; licensees should have some flexibility in satisfying the regulations on the basis of their accumulated plant experience and knowledge. This document addresses risk-informed approaches that are consistent with the basic elements identified in Regulatory Guide 1.174. In addition, this document provides guidance on the following for the purposes of RI-ISI. Estimating the probability of a leak, a leak that prevents the system fromperforming its function (disabling leak), and a rupture for piping segments, Identifying the structural elements for which ISI can be modified (reduced orincreased), based on factors such as risk insights, defense in depth, reduction of unnecessary radiation exposure to personnel,Determining the risk impact of changes to ISI programs,Capturing deterministic considerations in the revised ISI program, andDeveloping an inspection program that monitors the performance of the pipingelements for consistency with the conclusions from the risk assessment. Until the RI-ISI process is approved for generic use, the staff anticipates that licensees willrequest changes to their ISI programs by requesting NRC approval of a proposed inspection program that meets the criteria of 10 CFR 50.55a(a)(3)(i), providing an acceptable level of quality and safety. The licensee's RI-ISI program will be enforceable under 10 CFR 50.55a. Scope of the RI-ISI ProgramThis regulatory guide only addresses changes to the ISI programs for inspection of piping. To adequately reflect the risk implications of piping failure, both partial and full-scope RI-ISI

programs are acceptable to the NRC staff.

1 Generally, ASME Code Class 1 includes all reactor pressure boundary components. ASME Code Class 2 generally includessystems or portions of systems important to safety that are designed for post-accident containment and removal of heat and fission products. ASME Code Class 3 generally includes the system components or portions of systems important to safety that are designed to provide cooling water and auxiliary feedwater for the front-line systems. 1.178-6Partial Scope: A licensee may elect to limit its RI-ISI program to a subset of piping classes, forexample, ASME Class-1 piping only, including piping exempt from the current requirements.

Partial scope applications should include the full population of piping within the selected subset of piping such as ASME Class and/or plant systems. Full Scope: A full scope RI-ISI includes:All Class 1, 2, and 31 piping within the current ASME Section XI programs, andAll piping whose failure would compromise:Safety-related structures, systems, or components that are relied upon to remainfunctional during and following design basis events to ensure the integrity of the reactor coolant pressure boundary, the capability to shut down the reactor and maintain it in a safe shutdown condition, or the capability to prevent or mitigate the consequences of accidents that could result in potential offsite exposure comparable to 10 CFR Part 100 guidelines.Non-safety-related structures, systems, or components:That are relied upon to mitigate accidents or transients or are used in plantemergency operating procedures; orWhose failure could prevent safety-related structures, systems, orcomponents from fulfilling their safety-related function; orWhose failure could cause a reactor scram or actuation of a safety-relatedsystem.For both the partial and full scope evaluations, the licensee is to demonstrate compliancewith the acceptance guidelines and key principles of Regulatory Guide 1.174.The inspection locations of concern include all weld and base metal locations at whichdegradation may occur, although pipe welds are the usual point of interest in the inspection program. Within this regulatory guide, references to "welds" are intended in a broad sense to address inspections of critical structural locations in general, including the base metal as well as weld metal. Inspections will often focus on welds because detailed evaluations will often identify welds as the locations most likely to experience degradation. Welds are most likely to have fabrication defects, welds are often at locations of high stress, and certain degradation mechanisms (stress corrosion cracking) usually occur at welds. Nevertheless, there are other degradation mechanisms such as flow-assisted-corrosion (e.g., erosion-corrosion) and thermal fatigue that occur independent of welds.

2 Level 1 - accident sequence analysis, Level 2 - accident progression and source term analysis, and Level 3 - offsite consequenceanalysis.1.178-7Licensees implementing the risk-informed process may identify piping segmentscategorized as safety significant that are not currently subject to the traditional Code requirements (e.g., outside the Code boundaries, including Code exempt piping) or are not being inspected to a level that is commensurate with their risk significance. In this context, safety significant refers to a piping segment that has a relatively high contribution to risk. PRA systematically takes credit for systems with non-Code or exempt piping that provide support, act as alternatives, and act as backups to those systems with piping that are within the scope of the current Section XI of the Code. The RI-ISI program should result in inspections of safety significant piping. Organization and ContentThis regulatory guide is structured to follow the general four-element process forrisk-informed applications discussed in Regulatory Guide 1.174. The Discussion section summarizes the four-element process developed by the staff to evaluate proposed changes related to the development of a RI-ISI program. Regulatory Position 1 discusses an acceptable approach for defining the proposed changes to an ISI program. Regulatory Position 2 addresses, in general, the traditional and probabilistic engineering evaluations performed to support RI-ISI programs and presents the risk acceptance goals for determining the acceptability of the proposed change.

Regulatory Position 3 presents one acceptable approach for implementing and monitoring corrective actions for RI-ISI programs. The documentation the NRC will need to render its safety decision is discussed in Regulatory Position 4. Relationship to Other Guidance DocumentsAs stated above, this regulatory guide discusses acceptable approaches to incorporate riskinsights into an ISI program and directs the reader to Regulatory Guide 1.174 and SRP Chapters

19 and 3.9.8 for additional guidance, as appropriate. Further guidance is being developed in Draft Regulatory Guide DG-1122 and Draft SRP Chapter 19.1. Regulatory Guide 1.174 describes a general approach to risk-informed regulatory decisionmaking and discusses specific topics common to all risk-informed regulatory applications. Draft Regulatory Guide DG-1122, when finalized, will provide guidance on determining the quality of the PRA, in toto or for those partsthat are used to support an application and are sufficient to provide confidence in the results such that they can be used in regulatory decisionmaking for light-water reactors. Topics addressed in these documents include:PRA quality - characteristics and attributes for technical elements of a PRA,PRA scope - internal and external event initiators, at-power and shutdown modes ofoperation, consideration of requirements for Level 1, 2, and 32 analyses,PRA peer review - approach, process, and documentation,Risk metrics - CDF, LERF, importance measures,

1.178-8Sensitivity and uncertainty analyses.To the extent that a licensee elects to use PRA as an element to enhance or modify itsimplementation of activities affecting the safety-related functions of SSCs subject to the provisions of Appendix B to 10 CFR Part 50, the pertinent requirements of Appendix B are applicable. The information collections contained in this regulatory guide are covered by therequirements of 10 CFR Part 50, which were approved by the Office of Management and Budget (OMB), approval number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.Abbreviations and DefinitionsASMEAmerican Society of Mechanical EngineersBPVCBoiler and Pressure Vessel Code CCDFConditional core damage frequency CCFCommon cause failure CDFCore damage frequency CLERFConditional large early release frequency Expert ElicitationA process used to estimate failure rates or probabilities of piping whendata and computer codes are unavailable for the intended purpose.Expert PanelNormally refers to plant personnel experienced in operations,maintenance, PRA, ISI programs, and other related activities and disciplines that impact the decision under consideration.FSARFinal Safety Analysis Report IGSCCIntergranular stress corrosion cracking Importance MeasuresUsed in PRA to rank systems or components in terms of risk significance ISIInservice inspection ISTInservice testing LERFLarge early release frequency NDENondestructive examination NEINuclear Energy Institute NRCNuclear Regulatory Commission PRAProbabilistic risk assessment PSAProbabilistic safety assessment RCPBReactor coolant pressure boundary RI-ISIRisk-informed inservice inspection StaffRefers to NRC employees Sensitivity StudiesVarying parameters to assess impact due to uncertainties SRPStandard Review Plan SRRAStructural reliability/risk assessment (refers to fracture mechanicsanalysis)SSCsStructures, systems and components Tech SpecsTechnical specifications

1.178-9

B. DISCUSSION

When a licensee elects to incorporate risk insights into its ISI programs, it is anticipatedthat the licensee will build upon its existing PRA activities. The five key principles involved in the integrated decisionmaking process are described in detail in Regulatory Guide 1.174. In addition, Regulatory Guide 1.174 describes a four-element process for evaluating proposed risk-informed changes. The key principles and the section of this guide that addresses each of these principles forRI-ISI programs are as follows. 1. The proposed change meets the current regulations unless it is explicitly related to arequested exemption or rule change. (Regulatory Position 2.1.1)2. The proposed change is consistent with the defense-in-depth philosophy. (RegulatoryPosition 2.1.2)3. The proposed change maintains sufficient safety margins. (Regulatory Position 2.1.3)

4. When proposed changes result in an increase in CDF or risk, the increases should be smalland consistent with the intent of the Commission's Safety Goal Policy Statement. (Regulatory Position 2.2)5. The impact of the proposed change should be monitored by using performancemeasurement strategies. (Regulatory Position 3)Section 2 of Regulatory Guide 1.174 describes a four-element process for developingrisk-informed regulatory changes. These are: define the change, perform an engineering analysis, define the implementation and monitoring program, and submit the proposed change. The order in which the elements are performed may vary or they may occur in parallel, depending on the particular application and the preference of the program developers. The process is highly iterative. Thus, the final description of the proposed change to the ISI program as defined in Element 1 depends on both the analysis performed in Element 2 and the definition of the implementation of the ISI program performed in Element 3. While ISI is, by its nature, an inspection and monitoring program, it should be noted that the monitoring referred to in Element 3 is associated with making sure that the assumptions made about the impact of the changes to the ISI program are not invalidated. For example, if the inspection intervals are based on an allowable margin to failure, the monitoring is performed to make sure that these margins are not eroded.

Element 4 involves preparing the documentation to be submitted to the NRC and to be maintained by the licensee for later reference.

1.178-10

C. REGULATORY POSITION

1. ELEMENT 1: DEFINE THE PROPOSED CHANGES TO ISI PROGRAMSIn this first element of the process, the proposed changes to the ISI program are defined. This involves describing the scope of piping that would be incorporated in the overall assessment and how the inspection of this piping would be changed. Also included in this element is identification of supporting information and a proposed plan for the licensee's interactions with theNRC throughout the implementation of the RI-ISI program.1.1 Description of Proposed ChangesA full description of the proposed changes in the ISI program is to be prepared. Thisdescription should include:Identification of the plant's current requirements that would be affected by the proposedRI-ISI program. To provide a basis from which to evaluate the proposed changes, the licensee should also confirm that the plant's design and operation is in accordance with itscurrent requirements and that engineering information used to develop the proposed RI-ISI

program is also consistent with the current requirements.Identification of the elements of the ISI program to be changed.Identification of the piping in the plant that is both directly and indirectly involved with theproposed changes. Any piping not presently covered in the plant's ISI program butcategorized as safety significant (e.g., through an integrated decisionmaking process using PRA insights) should be identified and appropriately addressed. In addition, the particular systems that are affected by the proposed changes should be identified since this information is an aid in planning the supporting engineering analyses.Identification of the information that will be used to support the changes. This couldinclude performance data, traditional engineering analyses, and PRA information.A brief statement describing how the proposed changes meet the intent of theCommission's PRA Policy Statement.1.2Changes to Approved RI-ISI ProgramsThis section provides guidance on the need for licensees to report program activities andguidance on formal NRC review of changes made to RI-ISI programs.The licensee should implement a process for determining when RI-ISI program changesrequire formal NRC review and approval. Changes made to the NRC-approved RI-ISI program that could affect the process and results that were reviewed and approved by the NRC staff should be evaluated to ensure that the basis for the staff's approval has not been compromise

d. All

1.178-11changes should be evaluated using the change mechanisms described in the applicable regulations(e.g., 10 CFR 50.55a, 10 CFR 50.59) to determine whether NRC review and approval are required prior to implementation. If there is a question regarding this issue, the licensee should seek NRC

review and approval prior to implementation.2.ELEMENT 2: ENGINEERING ANALYSISAs part of defining the proposed change to the licensee's ISI program, the licensee shouldconduct an engineering evaluation of the proposed change, using and integrating a combination of traditional engineering methods and PRA. The major objective of this evaluation is to confirm that the proposed program change will not compromise defense in depth, safety margins, and other key principles described in this guide and in Regulatory Guide 1.174. Regulatory Guide 1.174 provides general guidance for performing this evaluation, which is supplemented by the RI-ISI

guidance herein.The regulatory issues and engineering activities that should be considered for arisk-informed ISI program are summarized here. For simplicity, the discussions are divided into traditional and PRA analyses. Regulatory Position 2.1 addresses the traditional engineering analysis, Regulatory Position 2.2 addresses the PRA-related analysis, and Regulatory Position 2.3 describes the integration of the traditional and PRA analyses. In reality, many facets of the traditional and PRA analyses are iterative.The engineering evaluations are to:Demonstrate that the change is consistent with the defense-in-depth philosophy;Demonstrate that the proposed change maintains sufficient safety margins;Demonstrate that when proposed changes result in an increase in CDF or risk, the increaseis small and consistent with the intent of the Commission's Safety Goal Policy Statement;andSupport the integrated decisionmaking process.The scope and quality of the engineering analyses performed to justify the changesproposed to the ISI programs should be appropriate for the nature and scope of the change. The decision criteria associated with each key principle identified above are presented in the following subsections. Equivalent criteria can be proposed by the licensee if such criteria can be shown to meet the key principles set forth in Section 2 of Regulatory Guide 1.174. 2.1Traditional Engineering Analysis This part of the evaluation is based on traditional engineering methods. Areas to beevaluated from this viewpoint include meeting the regulations, defense-in-depth attributes, safety

1.178-12margins, assessment of failure potential of piping segments, and assessment of primary andsecondary effects (failures) that result from piping failures. The engineering analysis for a RI-ISI piping program will achieve the following:1.Assess compliance with applicable regulations,

2.Perform defense-in-depth evaluation,

3.Perform safety margin evaluation,

4.Define piping segments,

5.Assess failure potential for the piping segment,

6.Assess the consequences (both direct and indirect) of piping segment failure,

7.Categorize the piping segments in terms of safety significance,

8.Develop an inspection program,

9.Assess the impact of changing the ISI program on CDF and LERF, and

10.Demonstrate conformance with the key principles (e.g., maintaining sufficient safetymargins, defense in depth consideration, Commission's Safety Goal Policy, etc.).2.1.1Assess Compliance with Applicable RegulationsThe engineering evaluation should assess whether the proposed changes to the ISIprograms would compromise compliance with the regulations. The evaluation should consider the appropriate requirements in the licensing basis and applicable regulatory guidance. Specifically, the evaluation should consider:10 CFR 50.55a Appendix A to 10 CFR Part 50Appendix B to 10 CFR Part 50ASME B&PVC,Section XI (10 CFR Part 50.55a)Regulatory Guide 1.84, "Design, Fabrication, and Materials Code Case Acceptability,ASME Section III" Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASMESection XI, Division 1"In addition, the evaluation should consider whether the proposed changes have affectedlicense commitments. A broad review of the licensing requirements and commitments may be

1.178-13necessary because proposed ISI program changes could affect issues not explicitly stated in thelicensee's FSAR or ISI program documentation. The Director of the Office of Nuclear Regulation is allowed by 10 CFR 50.55a to authorizealternatives to the specific requirements of this regulation provided the proposed alternative will ensure an acceptable level of quality and safety. Thus, alternatives to the acceptable RI-ISI

approaches presented in this guide may be proposed by licensees so long as supporting information is provided that demonstrates that the key principles discussed in this guide are maintained. The licensee should include in its RI-ISI program submittal the necessary exemptionrequests, technical specification amendment requests (if applicable), and relief requests necessary to implement its RI-ISI program. NRC-endorsed ASME Code Cases that apply risk-informed ISI programs are consistentwith this regulatory guide in that they encourage the use of risk insights in the selection of inspection locations and the use of appropriate and possibly enhanced inspection techniques that are appropriate to the failure mechanisms that contribute most to risk.2.1.2Defense-in-Depth EvaluationAs stated in Regulatory Guide 1.174, the engineering analysis should evaluate whether theimpact of the proposed change in the ISI program (individually and cumulatively) is consistent with the defense-in-depth philosophy. In this regard, the intent of this key principle is to ensure that the philosophy of defense in depth is maintained, not to prevent changes in the way defense in depth is achieved. The defense-in-depth philosophy has traditionally been applied in reactor design and operation to provide multiple means to accomplish safety functions and prevent the release of radioactive material. It has been and continues to be an effective way to account for uncertainties in equipment and human performance. Where a comprehensive risk analysis can be done, it can be used to help determine the appropriate extent of defense in depth (e.g., balance among core damage prevention, containment failure, and consequence mitigation) to ensure protection of public health and safety. Where a comprehensive risk analysis is not or cannot be done, traditional defense-in-depth consideration should be used or maintained to account for uncertainties. The evaluation should consider the intent of the general design criteria, national standards, and engineering principles such as the single failure criterion. Further, the evaluation should consider the impact of the proposed change on barriers (both preventive and mitigative) to core damage, containment failure or bypass, and the balance among defense-in-depth attributes.

The licensee should select the engineering analysis techniques, whether quantitative or qualitative, appropriate to the proposed change (see Regulatory Guide 1.174 for additional guidance).An important element of defense in depth for RI-ISI is maintaining the reliability ofindependent barriers to fission product release. Class 1 piping (primary coolant system) is the second boundary between the radioactive fuel and the general public. If a RI-ISI program categorized, for example, all segments in the hot and cold legs of the primary system piping as low safety significant and calculated that, with no inspections, the frequency of leaks would not

1.178-14increase beyond existing performance history of the ASME Code, the staff would continue torequire some level of NDE inspection. 2.1.3Safety MarginsIn engineering programs that affect public health and safety, safety margins are applied tothe design and operation of a system. These safety margins and accompanying engineering assumptions are intended to account for uncertainties, but in some cases can lead to operational and design constraints that are excessive and costly, or that could detract from safety (e.g., result in unnecessary radiation exposure to plant personnel). Insufficient safety margins may require additional attention. Prior to a request for relaxation of the existing requirements, the licensee must ensure that the uncertainties are adequately addressed. The quantification of uncertainties would likely require supporting sensitivity analyses. The engineering analyses should address whether the impacts of the changes proposed tothe ISI program are consistent with the key principle that adequate safety margins are maintained.

The licensee is expected to select the method of engineering analysis appropriate for evaluating whether sufficient safety margins would be maintained if the proposed change were implemented.

An acceptable set of guidelines for making that assessment are summarized below. Other equivalent decision criteria could also be found acceptable.Sufficient safety margins are maintained when:Codes and standards (see Regulatory Position 2.1.1) or alternatives approved for use by theNRC are met, andSafety analysis acceptance criteria in the licensing basis (e.g., updated FSAR, supportinganalyses) are met, or proposed revisions provide sufficient margins to account for analysis and data uncertainty.2.1.4Piping SegmentsA systematic approach should be applied when analyzing piping systems. One acceptableapproach is to divide or separate a piping system into segments; different criteria or definitions can be applied to each piping segment. One acceptable method is to identify segments of piping within the piping systems that have the same consequences of failure. Other methods could subdivide a segment that exhibits a given consequence into segments with similar degradation mechanisms or similar failure potential. The definition of a segment could encompass multiple criteria, as long as a sound engineering and accounting record is maintained and can be applied to an engineering analysis in a consistent and sound process. Consequences of failure may be defined in terms of an initiating event, loss of a particular train, loss of a system, or combinations thereof. The location of the piping in the plant, and whether inside or outside the containment or compartment, should be taken into consideration when defining piping segments.

1.178-15The definition of a piping segment can vary with the methodology. Defining pipingsegments can be an iterative process. In general, an analyst may need to modify the description of the piping segments before they are finalized. This guide does not impose any specific definition of a piping segment, but the analysis and the definition of a segment must be consistent and technically sound. 2.1.5Assess Piping Failure PotentialThe engineering analysis includes evaluating the failure potential of a piping segment. Determining the failure potential of piping segments, either with a quantitative estimate or by categorization into groups, should be based on an understanding of degradation mechanisms, operational characteristics, potential dynamic loads, flaw size, flaw distribution, inspection parameters, experience data base, etc. The evaluation should state the appropriate definition of the failure potential (e.g., failure on demand or operating failures associated with the piping, with the basis for the definition) that will be needed to support the PRA or risk assessment. The failure potential used in or in support of the analysis should be appropriate for the specific environmental conditions, degradation mechanisms, and failure modes for each piping location. When data are analyzed to develop a categorization process relating degradation mechanisms to failure potential, the data should be appropriate and publicly available. When an elicitation of expert opinion is used in conjunction with, or in lieu of, probabilistic fracture mechanics analysis or operating data, a systematic process should be developed for conducting such an elicitation. In such cases, a suitable team of experts should be selected and trained (NUREG/CR-5424 and NUREG-1563).When implementing probabilistic fracture mechanics computer programs that estimatestructural reliability and are used in risk assessment of piping, or other analytic methods for estimating the failure potential of a piping segment, some of the important parameters that need to be assessed in the analysis include the identification of structural mechanics parameters, degradation mechanisms, design limit considerations, operating practices and environment, and the development of a data base or analytic methods for predicting the reliability of piping systems.

Design and operational stress or strain limits are assessed. This information is available to the licensee in the design information for the plant. The loading and resulting stresses or strains on the piping are needed as input to the calculations that predict the failure probability of a piping segment. The use of validated computer programs, with appropriate input, is strongly recommended in a quantitative RI-ISI program because it may facilitate the regulatory evaluation of a submittal. The analytic method should be validated with applicable plant and industry piping performance data. To understand the impact of specific assumptions or models used to characterize thepotential for piping failure, appropriate sensitivity or uncertainty studies should be performed.

These uncertainties include, but are not limited to, design versus fabrication differences, variations in material properties and strengths, effects of various degradation and aging mechanisms, variation in steady-state and transient loads, availability and accuracy of plant operating history, availability of inspection and maintenance program data, applicability and size of the data base to the specific degradation and piping, and the capabilities of analytic methods and models to predict

1.178-16realistic results. Evaluation of these uncertainties provides insights to the input parameters thataffect the failure potential and, therefore, require careful consideration in the analysis. The methodology, process, and rationale used to determine the likelihood of failure ofpiping segments should be independently reviewed during the final classification of the risk significance of each segment. Referencing applicable generic topical reports approved by the NRC is one acceptable means to standardize the process. When new computer codes are used to develop quantitative estimates, the techniques should be verified and validated against established industry codes and available data. When data are used to evaluate the likelihood of piping failures, the data should be submitted to the NRC or referenced by an NRC-approved topical report. As stated in Regulatory Guide 1.174, "data, methods, and assessment criteria used to support regulatory decisionmaking must be scrutable and available for public review." It is the responsibility of the licensee to provide the data, methods, and justification to support its estimation of the failure potential of piping segments. 2.1.6Assess Consequences of Piping Segment FailuresWhen evaluating the risk from piping failures, the analyst needs to evaluate the potentialconsequences, or failures, that a piping failure can initiate. This can be accomplished by performing a detailed walkdown of a nuclear power facility's piping network. The consequencesof the postulated pipe segment failure include direct and indirect effects of the failure. Direct effects include the loss of a train or system and associated possible diversion of flow or an initiating event such as a loss of coolant accident (LOCA) or both. Indirect effects include the spatial effects of flood, spray, pipe whip, or jet impingement that may affect adjacent SSCs or depletion of water sources and loss of associated systems. 2.2Probabilistic Risk AssessmentIn accordance with the Commission's Policy Statement on PRA, the risk-informedapplication process is intended not only to support reduction in the number of inspections, but also to identify areas where increased resources should be allocated to enhance safety. Therefore, an acceptable RI-ISI process should not focus exclusively on areas in which reduced inspection could be justified. This section addresses ISI-specific considerations in the PRA to support relaxation of inspections, enhancement of inspections, and validation of component operability. ASME has published a PRA standard that addresses a Level 1 and limited Level 2 PRA forfull-power operation for internal events (excluding internal fire) (ASME RA-S-2002). Other standards for external events (i.e., seismic, wind and flood), low power and shutdown conditions and internal fires are under development by ANS.The NRC staff is currently developing a regulatory guide to provide guidance to licenseeson determining the technical adequacy of a PRA used in a risk-informed integrated decision making process, and to endorse standards and industry guidance (see Draft Regulatory Guide DG-

1122). The NRC staff is continuing to evaluate PRAs submitted in support of specific applications

1.178-17using the guidelines given in Section 2.2.3 and Section 2.5 of Regulatory Guide 1.174 and in SRPChapter 19 of the Standard Review Plan.The PRA can be used to categorize the piping segments into safety-significant and low-safety-significant classifications (or more classifications, if a finer graded approach is desired) and to confirm that the change in risk caused by the change in the ISI program is in accordance with the guidance of Regulatory Guide 1.174. The licensee's submittal should discuss measures used toensure adequate quality, such as a report of a peer review, when performed, that addresses the appropriateness of the PRA model for supporting a risk assessment of the change under consideration. The submittal should address any limitations of the analysis that are expected to impact the conclusion regarding the acceptability of the proposed change. The licensee'sresolution of the findings of the peer review, certification, or cross comparison, when performed, should also be submitted. This response could indicate whether the PRA was modified or justify why no change to the PRA was necessary to support decisionmaking for the change under consideration. 2.2.1Modeling Piping Failures in a PRA Input from the traditional engineering analysis addressed in Regulatory Position 2.1includes identification of piping segments from the point of view of the failure potential (degradation mechanisms) and consequences (resulting failure modes and consequential primary and secondary effects). The traditional analysis identifies both the primary and secondary effects that can result from a piping failure. The assessment of the primary and secondary failures identifies the portions of the PRA that are affected by the piping failure. Each pipe segment failure may have one of three types of impacts on the plant. 1.Initiating event failures are when the failure directly causes a transient and may or may notalso fail one or more plant trains or systems. 2.Standby failures are those failures that cause the loss of a train or system but which do notdirectly cause a transient. Standby failures are characterized by train or system unavailability that may require shutdown because of the technical specifications or limiting conditions for operation. 3.Demand failures are failures accompanying a demand for a train or system and are usuallycaused by the transient-induced loads on the segment during system startup. The impact of the pipe segment failure on risk should be evaluated with the PRA. Evaluation may involve a quantitative estimate derived from the PRA, a systematic technique to categorize the consequence of the pipe failure on risk, or some combination of quantification and categorization. If a segment failure were to lead to plant transients and equipment failures that are not at all represented in the PRA (a new and specific initiating event, for example), the evaluation process should be expanded to assess these events.

1.178-18PRAs normally do not include events that represent failure of individual piping segmentsnor the structural elements within the segments. A quantitative estimate of the impact of segment failures can be done by modifying the PRA logic to systematically and explicitly include the impact of the individual pipe segment failures. The impact of each segment's failure on risk canalso be estimated without modifying the PRA's logic by identifying an initiating event, basicevent, or group of events, already modeled in the PRA, whose failures capture the effects of the piping segment's failure (referred to as the surrogate approach). In either case, to assess theimpact of a particular segment failure, the analyst sets the appropriate events to a failed state in the PRA and requantifies the PRA or the appropriate parts of the PRA as needed. The analysis should appropriately incorporate segment failures that only cause an initiating event, that only degrade or fail a mitigating system required to respond to an independent initiating event, and that simultaneously cause an initiating event and degrade or fail a mitigating system responding to the initiating event. The requantification should explicitly address truncation errors, since cut set or truncated sequences may not fully capture the impact of multiple failure events.If a systematic technique is used to categorize the consequence of pipe failures, it shouldalso be based on PRA results. In this case, however, the categories may be represented by ranges of conditional results, and instead of quantifying the impact of each segment failure, the process should provide for determining the range within which each segment's failure would lie. In general, the consequences would range from high, for those segments whose failure would have a high likelihood of leading to core damage or large early release, to low for those segments whose failure would likely not lead to core damage or large early release. The licensee should provide a discussion and justification of the ranges selected. The use of ranges instead of individual results estimates may require fewer calculations, but the categorization process and decision criteria should be justified, well defined, and repeatable. 2.2.1.1 Dependencies and Common Cause FailuresThe effects of dependencies and common cause failures (CCFs) for ISI components need tobe considered carefully because of the significance they can have on CDF. Generally, data are insufficient to produce plant-specific estimates based solely on plant-specific data. For CCFs, data from generic sources may be required. 2.2.1.2 Human Reliability Analyses To Isolate Piping BreaksFor ISI-specific analyses, the human reliability analysis methodology used in the PRA mustaccount for the impact that the piping segment break would have on the operator's ability to respond to the event. In addition, the reliability of the inspection program (including both operator and equipment qualification), which factors into the probability of detection, should also be addressed. 2.2.2Use of PRA for Categorizing Piping SegmentsWhen the impact of each segment's failure on plant risk metrics has been determined, thesafety significance of the segments is developed. The method of categorizing a piping segment can vary. For example, if the pipe failure event frequency or probability is estimated and the events are incorporated into the PRA logic model, importance measure calculations and the

1.178-19determination of safety significance, as discussed in Regulatory Guide 1.174 and SRP Chapter 19,may be performed. Alternatively, if a conditional core damage frequency (CCDF), conditional large early release frequency (CLERF), conditional core damage probability (CCDP), or conditional large early release probability (CLERP) (depending on the impact the segment failure has on the plant) is estimated for each segment from the PRA, a CDF and LERF caused only by pipe failures may be developed by combining the conditional consequences and segment failure probabilities or frequencies external to the PRA logic model. Importance measures can also be developed using these results and these measures compared to appropriate threshold criteria to support the determination of the safety significance of each segment. The calculations used in such a process should yield well-defined estimates of CDF, LERF, and importance measures. The licensee should provide a discussion of and justification for the threshold criteria used. As discussed in Regulatory Position 2.2.1, the consequence of segment failures may berepresented by categories of consequences instead of quantitative estimates for each segment. In this case, the potential for pipe failure as discussed in Regulatory Position 2.1.5 would also be developed as categories ranging from high to low depending on the degradation mechanisms present and the corresponding likelihood that the segment will fail. These consequence and failure likelihood categories should be systematically combined to develop categories of safety significance. The licensee should provide a discussion and justification relating the consequence and failure likelihood categories to the safety-significant category assigned to each combination. The safety-significance category of the pipe segment will help determine the level ofinspection effort devoted to the segment. In general, safety-significant segments will receive more inspections and more demanding inspections than low safety-significant segments. In any integrated categorization process, the principles in Regulatory Guide 1.174 need to be addressed.

Irrespective of the method used in the analysis, the licensee needs to justify the final categorization process as being robust and reasonable with respect to the analysis uncertainties.2.2.3Demonstrate Change in Risk Resulting from Change in ISI ProgramAny change in the ISI program has an associated risk impact. Evaluation of the change inrisk may be a detailed calculation or it may be a bounding estimate supported by sensitivity studies as appropriate. The change may be a risk increase, a risk decrease, or risk neutral. The change is evaluated and compared with the guidelines presented in Regulatory Guide 1.174. The staff expects that a RI-ISI program would lead to both risk reduction and reduction in radiation exposure to plant personnel. The change in risk estimate should appropriately account for the change in the number ofelements inspected and the effects of enhanced inspection. The methods used to determine the piping failure potential, the piping failure consequence, and the impact of the change in the number of inspections should together provide confidence that any increase in CDF or risk is small and acceptable in accordance with Regulatory Guide 1.174 guidelines and consistent with the intent of the Commission's Safety Goal Policy Statement.

1.178-202.3Integrated DecisionmakingRegulatory Positions 2.1 and 2.2 address the elements of traditional analysis and PRAanalysis of a RI-ISI program. These elements are part of an integrated decisionmaking process that assesses the acceptability of the program. The key principles of Regulatory Guide 1.174 are systematically addressed. Technical and operations personnel at the plant review the information and render a finding of the safety-significance category for each piping segment under review.

Detailed guidelines for the categorization of piping segments should be developed and discussed with the group responsible for the determination (typically performed by the plant's expert panel).The method for selecting the number of piping elements to be inspected should be justified. 3. ELEMENT 3: IMPLEMENTATION, PERFORMANCE MONITORING, ANDCORRECTIVE ACTION STRATEGIESIntegrating the information obtained from Elements 1 and 2 of the RI-ISI process (asdescribed in Regulatory Positions 1 and 2 of this guide), the licensee develops proposed RI-ISI

implementation, performance monitoring, and corrective action strategies. The RI-ISI program should identify piping segments whose inspection strategy (i.e., frequency, number of inspections, methods, or all three) should be increased as well as piping segments whose inspection strategies might be relaxed. The number of required inspections should be a product of the systematic application of the risk-informed process. The program should be self-correcting as experience dictates. The program should contain performance measures used to confirm the safety insights gained from the risk analyses.3.1Program ImplementationA licensee should have in place a schedule for inspecting all segments categorized as safetysignificant in its RI-ISI program. This schedule should include inspection strategies and inspection frequencies, inspection methods, the sampling program (the number of elements/areas to be inspected, the acceptance criteria, etc.) for the safety-significant piping that is within the scope of the ISI program, including piping segments identified as safety significant that are not currently in the ISI program.The analysis for a RI-ISI program will, in most cases, confirm the appropriateness of theinspection interval and scope requirements of the ASME Boiler and Pressure Vessel Code (B&PVC)Section XI Edition and Addenda committed to by a licensee in accordance with 10 CFR 50.55a. The requirements for these intervals are contained in Section XI of the B&PVC.

However, should active degradation mechanisms surface, the inspection interval would be modified as appropriate. Updates to the RI-ISI program should be performed at least periodically to coincide with the inspection program requirements contained in Section XI under Inspection Program B. The RI-ISI program should be evaluated periodically as new information becomes available that could impact the ISI program. For example, if changes to the PRA impact the decisions made for the RI-ISI program, if plant design and operations change such that they impact the RI-ISI program, if inspection results identify unexpected flaws, or if replacement activities

1.178-21impact the failure potential of piping, the effects of the new information should be assessed. Theperiodic evaluation may result in updates to the RI-ISI program that are more restrictive than required by Section XI. As plant design feature changes are implemented, changes to the input associated with the RI-ISI program segment definition and element selections should be reviewed and modified as needed. Changes to piping performance, the plant procedures that can affect system operating parameters, piping inspection, component and valve lineups, equipment operating modes, or the ability of the plant personnel to perform actions associated with accident mitigation should be reviewed in any RI-ISI program update. Leakage and flaws identified during scheduled inspections should be evaluated as part of the RI-ISI update. Piping segments categorized as safety significant that are not in the licensee's current ISIprogram should (wherever appropriate and practical) be inspected in accordance with applicable ASME Code Cases (or revised ASME Code), including compliance with all administrative requirements. Where ASME Section XI inspection is not practical or appropriate, or does not conform to the key principles identified in this document, alternative inspection intervals, scope, and methods should be developed by the licensee to ensure piping integrity and to detect piping degradation. A summary of the piping segments and their proposed inspection intervals and scope should be provided to the NRC prior to implementation of the RI-ISI program at the plant. For piping segments categorized as safety significant that were the subject of a previousNRC-approved relief request or were exempt under existing Section XI criteria, the licensee should assess the appropriateness of the relief or exemption in light of the risk significance of the piping segment. 3.2Performance Monitoring3.2.1Periodic UpdatesThe RI-ISI program should be updated at least on the basis of periods that coincide with theinspection program requirements contained in Section XI under Inspection Program B. These updates should be performed more frequently if dictated by any plant procedures to update the PRA (which may be more restrictive than a Section XI period type update) or as new degradation mechanisms are identified. 3.2.2Changes to Plant Design FeaturesAs changes to plant design are implemented, changes to the inputs associated with RI-ISIprogram segment definition and element selections may occur. It is important to address these changes to the inputs used in any assessment that may affect resultant pipe failure potentials used to support the RI-ISI segment definition and element selection. Some examples of these inputs would include:Operating characteristics (e.g., changes in water chemistry control)Material and configuration changesWelding techniques and procedures

1.178-22Construction and preservice examination resultsStress data (operating modes, pressure, and temperature changes)In addition, plant design changes could result in significant changes to a plant's CDF orLERF, which in turn could result in a change in consequence of failure for system piping segments.3.2.3Changes to Plant ProceduresChanges to plant procedures that affect ISI, such as system operating parameters, testintervals, or the ability of plant operations personnel to perform actions associated with accident mitigation, should be included for review in any RI-ISI program update. Additionally, changes in those procedures that affect component inspection intervals, valve lineups, or operational modes of equipment should also be assessed for their impact on changes in postulated failure mechanism initiation or CDF/LERF contribution. 3.2.4Equipment Performance ChangesEquipment performance changes should be reviewed with system engineers andmaintenance personnel to ensure that changes in performance parameters such as valve leakage, increased pump testing, or identification of vibration problems is included in the periodic evaluation of the RI-ISI program update. Specific attention should be paid to these conditions if they were not previously assessed in the qualitative inputs to the element selections of the RI-ISI

program.3.2.5Examination ResultsWhen scheduled RI-ISI program NDE examinations, pressure tests, and correspondingVT-2 visual examinations for leakage have been completed, and if unacceptable flaws, evidence of service related degradation, or indications of leakage have been identified, the existence of these conditions should be evaluated. This update of the RI-ISI program should follow the applicable elements of Appendix B to 10 CFR Part 50 to determine the adequacy of the scope of the inspection program.3.2.6Information on Individual Plant and Industry FailuresReview of individual plant maintenance activities associated with repairs or replacements,including identified flaw evaluations, is an important part of any periodic update, regardless of whether the activity is the result of a RI-ISI program examination. Evaluating this information as it relates to a licensee's plant provides failure information and trending information that may havea profound effect on the element locations currently being examined under a RI-ISI program.

Industry failure data is just as important to the overall program as the owner's information. Duringthe periodic update, industry data bases (including available international data bases) should be reviewed for applicability to the owner's plant.

1.178-233.3Corrective Action ProgramsEach licensee of a nuclear power plant is responsible for having a corrective actionprogram, consistent with Regulatory Guide 1.174. Measures are to be established to ensure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances, are promptly identified and corrected. In the case of significant conditions adverse to quality, the measures must ensure that the cause of the condition is determined and corrective action is taken to preclude repetition. The identification of the significant condition adverse to quality, the cause of the condition, and the corrective action are to be documented and reported to appropriate levels of management.For Code piping categorized as safety significant, this corrective action program should beconsistent with applicable Section XI provisions. For non-Code and Code-exempt piping categorized as safety significant, appropriate Section XI provisions should also be used, or the licensee should submit an alternative program based on the risk significance of the piping.3.4Acceptance GuidelinesThese acceptance guidelines are for the implementation, monitoring, and corrective actionprograms for the accepted RI-ISI program plan. 1.The evaluation of the implementation program will be based on the attributes presented inRegulatory Positions 3.1 through 3.3 of this Regulatory Guide 1.178.2.The corrective action program should provide reasonable assurance that a nonconformingcomponent will be brought back into conformance in a timely fashion. The corrective actions required in ASME Section XI should continue to be followed.3.Evaluations within the corrective action program may also include:Ensuring that the root cause of the condition is determined and thatcorrective actions are taken to preclude repetition. The identification of the significant condition adverse to quality, the cause of the condition, and the corrective action are to be documented and reported to appropriate levels of management.Determining the impact of the failure or nonconformance on system ortrain operability since the previous inspection.Assessing the applicability of the failure or nonconforming condition toother components in the RI-ISI program.Correcting other susceptible RI-ISI components as necessary.

1.178-24Incorporating the lessons in the plant data base and computer models, ifappropriate.Assessing the validity of the failure rate and unavailability assumptionsthat can result from piping failures used in the PRA or in support of the PRA, andConsidering the effectiveness of the component's inspection strategy indetecting the failure or nonconforming condition. The inspection interval would be reduced or the inspection methods adjusted, as appropriate, when the component (or group of components) experiences repeated failures or nonconforming conditions.4.The corrective action evaluation should be provided to the licensee's PRA and RI-ISIgroups so that any necessary model changes and regrouping are done, as appropriate.5.The RI-ISI program documents should be revised to document any RI-ISI program changesresulting from the corrective actions taken.6.A program is in place that monitors industry findings.

7.Piping is subject to examination. The examination requirements include all pipingevaluated by the risk-informed process and categorized as safety significant.8.The inspection program is to be completed during each ten-year inspection interval withthe following exceptions.8.1If, during the interval, a re-evaluation using the RI-ISI process isconducted and scheduled items are no longer required to be examined, these items may be eliminated.8.2If, during the interval, a re-evaluation using the RI-ISI process isconducted and items must be added to the examination program, those items will be added.9.If additional examinations are needed following the identification of unacceptable flaws,additional examinations will be performed on the elements with the same root cause or degradation mechanisms as the identified flaw or relevant condition. The number of additional examinations should be equivalent to the number of elements required to be inspected during the current outage. If unacceptable flaws or relevant conditions are again found similar to the initial problem, the remaining elements identified as susceptible will be examined. All additional examinations should be performed during the current outage.10.Examination and Pressure Test Requirements. Pressure testing and VT-2 visualexaminations are to be performed on Class 1, 2, and 3 piping systems in accordance with

1.178-25Section XI, as specified in the licensee's ISI program. The pressure testing and VT-2examinations are also to be performed on non-Code safety-significant piping. The non- Code safety-significant piping will be treated as ASME Code Class piping for the purposes of examination and pressure testing.Examination methods, equipment qualification, personnel qualification, and procedurequalification are to be in accordance with the edition and addenda endorsed by the NRC

through 10 CFR 50.55a, "Codes and Standards."11.Acceptance standards for identified flaws and repair or replacement activities are to beperformed in accordance with the B&PVC Section XI requirements.12.Records and reports should be prepared and maintained in accordance with the B&PVCSection XI Edition and Addenda as specified in the licensee's ISI program.4.ELEMENT 4: DOCUMENTATIONThe recommended contents for a plant-specific risk-informed ISI submittal are presentedhere. This guidance will help ensure the completeness of the information provided and aid in minimizing the time needed for the review process. 4.1Documentation that Should Be Included in a Licensee's RI-ISI SubmittalReferences to NRC-approved generic topical reports that address the methodology andissues requested in a submittal are acceptable. Documentation guidelines specified in approved topical reports may be used instead of the following guidelines when the methodology from an approved topical report is used. Since topical reports could cover more issues than applied by a licensee or the licensee may elect to deviate from the full body of issues addressed in the topical report, such distinctions should be clearly stated.The following items should be included in the application to implement a RI-ISI program.

A request to implement a RI-ISI program as an authorized alternative to the current NRCendorsed ASME Code pursuant to 10 CFR 50.55a(a)(3)(i). The licensee should also provide a description of how the proposed change impacts any commitments made to the NRC. Discussions on each of the following five key principles of risk-informed regulations (seeSection 2 of Regulatory Guide 1.174 for more details).1.The proposed change meets the current regulations unless it is explicitly related toan alternative requested under 10 CFR 50.55a(a)(3)(i), a requested exemption, or a rule change.

1.178-262.The proposed change is consistent with the defense-in-depth philosophy (seedetailed discussions in Section 2.2.1.1 of Regulatory Guide 1.174). 3.The proposed change maintains sufficient safety margins (see detailed discussionsin Section 2.2.1.2 in Regulatory Guide 1.174). 4.When proposed changes result in an increase in CDF and/or risk, the increasesshould be small and consistent with the guidance in Regulatory Guide 1.174.5.The impact of the proposed change should be monitored using performancemeasurement strategies.Identification of the aspects of the plant's current requirements that would be affected bythe proposed RI-ISI program. This identification should include all commitments and augmented programs (for example, the IGSCC inspections and other commitments arising from generic letters affecting piping integrity) that the licensee intends to change or terminate as part of the RI-ISI program. The application of the RI-ISI methodology to incorporate and change the augmented program should be justified. Identification of the specific revisions to existing inspection schedules, locations, andmethods that would result from implementation of the proposed program.Plant procedures or documentation containing the guidelines for all phases of evaluatingand implementing a change in the ISI program based on probabilistic and traditional insights. These should include a description of the integrated decisionmaking process and criteria used for categorizing the safety significance of piping segments, a description of how the integrated decisionmaking was performed, a description and justification of the number of elements to be inspected in a piping segment, the qualifications of the individuals making the decisions, and the guidelines for making those decisions.The results of the licensee's ISI-specific analyses used to support the program change withenough detail to be clearly understandable to the reviewers of the program. These results should include the following information. A list of the piping systems reviewed.A list of each segment, including the number of welds, weld type, and properties ofthe welding material and base metal, the failure potential, CDF, CCDF/CCDP,

LERF, CLERF, importance measure results (risk achievement worth (RAW),

Fussel-Vesely (F-V), etc.) and justification of the associated threshold values, degradation mechanism, test and inspection intervals used in or in support of the PRA, etc. Results from other methods used to develop the consequences and categorization of each segment (or weld) should be documented in a similar level of detail.

3 In April 2000, the Nuclear Energy Institute submitted a process (Letter to S.J. Collins, NRC) for peer review of licensee PRAs. It was submitted for staff review in the context of its use in categorizing SSCs with respect to special treatment requirements (i.e.,supporting NRC's risk-informed proposed rulemaking to add new section 10 CFR 50.69, "Risk-Informed Categorization andTreatment of Structures, Systems, and Components""Option 2" work (SECY-02-0176)). This process, when endorsed by the NRC, may also be of use in making licensing basis changes (as well as other regulatory activities not addressed here); if so, future revisions of this regulatory guide may endorse this certification process for this purpose.1.178-27The degradation mechanisms for each segment (if segments contain welds exposedto different degradation mechanism, for each weld) used to develop the failure potential of each segment. For the selected limiting locations, provide examples of the failure mode, failure potential, failure mechanism, weld type, weld location, and properties of the welding material and base metal. A detailed description and justification for the number of elements to be inspected.Equipment assumed to fail as a direct or indirect consequence of each segment'sfailure (if segments contain welds with different failure consequences, for each weld).A description of how the impact of the change between the current Section XI andthe proposed RI-ISI programs is evaluated or bounded, and how this impact compares with the risk guidelines in Section 2.2.2.2 of Regulatory Guide 1.174.The means by which failure probabilities, frequencies, or potential were determined. A description of the PRA used for the categorization process and for the determination ofrisk impact, in terms of the process to ensure quality, scope, and level of detail, and how limitations in quality, scope, and level of detail are compensated for in the integrated decisionmaking process supporting the ISI submittal. At a minimum, the submittal should include the following information.The CDF and LERF estimates and the version, calculation, or other referencenumber that identifies which version of the PRA was used.A description of the process used to up-date the PRA to ensure that the PRAanalyses adequately represent the current design, construction, operational practices, and operational experience of the plant and its operator.A description of the staff and industry reviews performed on the PRA.3 Limitations, weakness, or improvements identified by the reviewers that could change the results of the PRA should be discussed. The resolution of the reviewer comments, or an explanation of the insensitivity of the analysis used to support the submittal to the comment, should be provided.If the submittal includes modified inspection intervals, the methodology and results of theanalysis should be submitted.

1.178-28A description of the implementation, performance monitoring, and corrective actionstrategies and programs in sufficient detail for the staff to understand the new ISI program and its implications.Applicable documentation discussed under the cumulative risk documentation forsubmittal in Section 1.3 of Regulatory Guide 1.174.Reference to NRC-approved topical reports on implementing a RI-ISI and supportingdocuments. Variations from the topical reports and supporting documents should be clearly identified.4.2 Documentation that Should Be Available Onsite for InspectionThe licensee should maintain at its facility the technical and administrative records used insupport of its submittal or should be able to generate the information on request. This information should be available for NRC review and audit. If changes are planned to the ISI program based on internal procedures and without prior NRC approval, the following information should also be placed in the plant's document control system so that the analyses for any given change can beidentified and reviewed. The record should include, but not be limited to, the following information:All the documentation discussed in 4.1. Although the documentation requirements in asubmittal may be reduced when referring to NRC-approved topical reports, all the documentation included under 4.1 should be available for onsite inspection.Plant and applicable industry data used in support of the RI-ISI program. All analyses andassumptions used in support of the RI-ISI program and communications with outside organizations supporting the RI-ISI program (e.g., use of peer and independent reviews, use of expert contractors).

Detailed procedures and analyses performed by an expert panel, or other technical groups,if relied upon for the RI-ISI program, including a record of deliberations, recommendations, and findings.Documentation of the plant's baseline PRA used to support the ISI submittal should be ofsufficient detail to allow an independent reviewer to ascertain whether the PRA reflects the current plant configuration and operational practices commensurate with the role the PRA

results play in the integrated decisionmaking process. In addition to documentation on the PRA itself, analyses performed in support of the ISI submittal should be documented in a manner consistent with the baseline documentation. Such analyses may include: The process used to identify initiating events developed in support of the RI-ISIsubmittal and the results from the process.Any event and fault trees developed during the RI-ISI submittal preparation.

1.178-29Documentation of the methods and techniques used to identify and quantify theimpact of pipe failures using the PRA, or in support of the PRA, if different from those used during the development of the baseline PRA.The techniques used to identify and quantify human actions. The data used in any uncertainty calculations or sensitivity calculations, consistentwith the guidance provided in Regulatory Guide 1.174. How uncertainty was accounted for in the segment categorization, as well as thesensitivity studies performed to ensure the robustness of the categorization.Detailed results of the inspection program corresponding to the ISI inspection recordsdescribed in the implementation, performance monitoring, and corrective action program accompanying the RI-ISI submittal.For each piping segment, information on weld type, weld location, and properties ofwelding material and base metal.For each piping segment, information regarding the process and assumptions used todevelop failure mode and failure potential (frequency/probability), in addition to the identification of the failure mechanism.

1 Copies may be obtained from the American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016.2 Requests for single copies of draft or active regulatory guides (which may be reproduced) or for placement on an automaticdistribution list for single copies of future draft guides in specific divisions should be made in writing to the U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention: Reproduction and Distribution Services Section, or by fax to

(301)415-2289; email <DISTRIBUTION@NRC.GOV>. Copies are available for inspection or copying for a fee from the NRC

Public Document Room at 11555 Rockville Pike (first floor), Rockville, MD; the PDR's mailing address is USNRC PDR,Washington, DC 20555; telephone (301)415-4737 or 1-(800)397-4209; fax (301)415-3548; e-mail <PDR@NRC.GOV>. Copies of many regulatory guides are available on NRC's web site, <WWW.NRC.GOV>.3 Copies may be obtained from the EPRI Distribution Center, 207 Coggins Drive, P.O. Box 23205, Pleasant Hill, CA 94523.4 Electronic copies are available on the NRC web site at <WWW.NRC.GOV> in the Document Collections under GenericCommunications. Copies are available for inspection or copying for a fee from the NRC Public Document Room at 11555 Rockville Pike (first floor), Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone(301)415-4737 or 1-(800)397-4209; fax (301)415-3548; e-mail <PDR@NRC.GOV>.1.178-30REFERENCESASME B&PVC, "Rules for Inservice Inspection of Nuclear Power Plant Components," AmericanSociety of Mechanical Engineers, Boiler and Pressure Vessel Code,Section XI, 1989 Edition.1ASME RA-S-2002, "Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications," American Society of Mechanical Engineers, April 5, 2002.1Draft Regulatory Guide DG-1122, "An Approach for Determining the Technical Adequacy ofProbabilistic Risk Assessment Results for Risk-Informed Activities," USNRC, November 2002.2Draft SRP Chapter 19.1, "An Approach for Determining the Technical Adequacy of ProbabilisticRisk Assessment Results for Risk-Informed Activities," USNRC, November 2002.2EPRI TR-112657, "Revised Risk-Informed Inservice Inspection Evaluation Procedure," ElectricPower Research Institute, Revision B-A, December 1999.3Generic Letter 89-13, "Service Water System Problems Affecting Safety-Related Equipment,"USNRC, July 18, 1989.4Generic Letter 89-08, "Erosion/Corrosion-Induced Pipe Wall Thinning," USNRC, May 2, 1989.4Generic Letter 88-01, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping,"USNRC, January 25, 1988.4IE Bulletin 79-17, "Pipe Cracks in Stagnant Borated Water Systems at PWR Plants," USNRC,October 29, 1979.4Letter to S.J. Collins, NRC, from Ralph E. Beedle, NEI, with attached "Probabilistic Risk Analysis (PRA) Peer Review Guidance," Rev. A3, NEI 00-02, Prepared for NEI Risk-Based Applications

5 Copies are available for inspection or copying for a fee from the NRC Public Document Room at 11555 Rockville Pike (firstfloor), Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone (301)415-4737 or 1-(800)397-4209; fax (301)415-3548; e-mail <PDR@NRC.GOV>.6 Copies are available at current rates from the U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20402-9328(telephone (202)512-1800); or from the National Technical Information Service by writing NTIS at 5285 Port Royal Road, Springfield, VA 22161; <http://www.ntis.gov/ordernow>; telephone (703)487-4650. Copies are available for inspection orcopying for a fee from the NRC Public Document Room at 11555 Rockville Pike, Rockville, MD; the PDR's mailing address isUSNRC PDR, Washington, DC 20555; telephone (301)415-4737 or (800)397-4209; fax (301)415-3548; email is PDR@NRC.GOV. Certain NUREG documents are available electronically at <WWW.NRC.GOV> under DocumentCollections.1.178-31Task Force by WOG/Westinghouse Electric Co., and B&WOG/Framatome Technologies, Inc.,April 24, 2000.5 NRC Bulletin No. 88-11, "Pressurizer Surge Line Thermal Stratification," USNRC, December 20,1988.4NRC Bulletin No. 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant Systems,"USNRC, June 22, 1988.4NRC Information Notice 93-20, "Thermal Fatigue Cracking of Feedwater Piping to SteamGenerators," USNRC, March 24, 1993.4NUREG-1563, J.P. Kotra et al., "Branch Technical Position on the Use of Expert Elicitation in theHigh-Level Radioactive Waste Program," USNRC, November 1996.6NUREG/CR-5424, M.A. Meyer and J.A. Booker, "Eliciting and Analyzing Expert Judgment,"(Prepared for the NRC by Los Alamos National Laboratory), USNRC, January 1990.6Policy Statement, "Use of Probabilistic Risk Assessment Methods in Nuclear Regulatory Activities; Final Policy Statement," Federal Register, Vol. 60, p 42622, USNRC, August 16,1995.Regulatory Guide 1.84, "Design, Fabrication, and Materials Code Case Acceptability, ASMESection III," USNRC, Regulatory Guide 1.84, Revision 32, June 2003.2Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI,Division 1," USNRC, Regulatory Guide 1.147, Revision 13, June 2003.2Regulatory Guide 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Current Licensing Basis," USNRC, Regulatory Guide 1.174, Revision 1, November 2002.2Regulatory Guide 1.175, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:

Inservice Testing," USNRC, August 1998.2Regulatory Guide 1.176, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:

Graded Quality Assurance," USNRC, August 1998.2

7 Electronic copies are available at <WWW.NRC.GOV> in the Document Collections under Commission papers. Copies areavailable for inspection or copying for a fee from the NRC Public Document Room at 11555 Rockville Pike (first floor),

Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone (301)415-4737 or 1-(800)397-4209; fax (301)415-3548; e-mail <PDR@NRC.GOV>.1.178-32Regulatory Guide 1.177, "An Approach for Plant-Specific, Risk-Informed Decisionmaking:Technical Specifications," USNRC, August 1998.2Safety Goal Policy Statement, "Safety Goals for the Operations of Nuclear Power Plants; PolicyStatement," USNRC, Federal Register, Vol. 51, p. 30028 (51 FR 30028), August 4, 1986.SECY-02-0176, Proposed Rulemaking To Add New Section 10 CFR 50.69, "Risk-InformedCategorization and Treatment of Structures, Systems, and Components," September 30, 2002.7SECY-00-0162, "Addressing PRA Quality in Risk-Informed Activities," USNRC, July 28, 2000.7 SECY-95-280, "Framework for Applying Probabilistic Risk Analysis in Reactor Regulation,"USNRC, November 27, 1995.7SRP Chapter 3.9.7, "Standard Review Plan for Risk-Informed Decision Making: Inservice Testing," USNRC, NUREG-0800, Chapter 3.9.7, Revision 1, April 2003.2SRP Chapter 3.9.8, "Standard Review Plan for the Review of Risk-Informed Inservice Inspection of Piping," USNRC, NUREG-0800, Chapter 3.9.8, September 2003.2SRP Chapter 16.1, "Standard Review Plan for Risk-Informed Decision Making: Technical Specifications," USNRC, NUREG-0800, Chapter 16.1, August 1998.2SRP Chapter 19, "Standard Review Plan for Risk-Informed Decision Making," USNRC,

NUREG-0800, Chapter 19, Revision 1, November 2002.2WCAP-14572, "Westinghouse Owners Group Application of Risk Informed Methods to Piping Inservice Inspection Topical Report," WCAP-14572, Revision 1, NP-A, Westinghouse Energy Systems, February 199

9.

1.178-33REGULATORY ANALYSISA separate regulatory analysis was not prepared for this regulatory guide. The regulatoryanalysis prepared for Draft Regulatory Guide DG-1063, October 1997, provides the regulatory basis for this regulatory guide as well. DG-1063 was issued for public comment as the draft of this regulatory guide. A copy of the regulatory analysis is available for inspection and copying for a fee at the U.S. Nuclear Regulatory Commission Public Document Room, 11555 Rockville Pike, Rockville, MD; the PDR's mailing address is USNRC PDR, Washington, DC 20555; telephone(301)415-4737 or 1-(800)397-4209; fax (301)415-3548; e-mail <PDR@NRC.GOV>.