SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000395/2025401
Dear Eric S. Carr:
On July 17, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station, Unit 1 and discussed the results of this inspection with Fikiri Newton and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000395 License No. NPF-12
Enclosure:
As stated
Inspection Report
Docket Number:
05000395
License Number:
Report Number:
Enterprise Identifier:
I-2025-401-0052
Licensee:
Dominion Energy South Carolina (DESC)
Facility:
Virgil C. Summer Nuclear Station, Unit 1
Location:
Jenkinsville, SC
Inspection Dates:
July 14, 2025 to July 17, 2025
Inspectors:
J. Justice, Senior Physical Security Inspector
J. Stovall, Physical Security Inspector
J. Tornow, Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety, and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Virgil C. Summer Nuclear Station,
Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- Tier I: 02.01(b,c,d), 02.02(c,d,e,f,g), 02.03(a), 02.04(a,c,d,e), 02.05(a)
- Tier II: 02.06(c), 02.08(a), 02.08(c), 02.08(e)
- Tier III: 02.09
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: 02.01(a), 02.02(a,b,c,d,e,f,g,h,i), 02.03(a,b,c), 02.04(a,b,c,f,g),02.05(b,c,d), 02.06(b,d,e), 02.07(a,b,c,d), 02.08(a,b,c,d,e)
- Tier II: 02.09(a,b), 02.11(d), 02.13(a)
- Tier III: 02.14
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
(1)
- Tier I: 02.02(c,d,f), 02.03(a,b,c), 02.04(a)
- Tier II: 02.05(a,b,c), 02.06(b), 02.08(a)
- Tier III: 02.10, 02.14(a)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC baseline inspection of this program area, Virgil C. Summer Nuclear Station Physical Security Plan, Revision 21, was implemented based on Virgil C. Summer Nuclear Station's evaluation, and in accordance with 10 CFR 50.54(p)(2), that the change resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan change to evaluate for potential decreases in the safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of this change.
Therefore, the change remains subject to future NRC inspection in its entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicator submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) July 2024 - June
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified that no proprietary information was retained or documented in this report.
- On July 17, 2025, the inspectors presented the security baseline inspection results to Fikiri Newton and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
263245 1283788
262756
Miscellaneous
D06638
EntryScan 4e trace detection device
March 4,
24
SPP-228
Search Equipment Operational Test Procedure
Revision 7
Search Programs
Revision 5
Procedures
Protected Area Access Control
Revision 7
Corrective Action
Documents
283475 1281577
281579 1294487
288184 1285723
283732 1283520
275259 1273619
271810
Corrective Action
Documents
Resulting from
Inspection
296478 1296479
PTP-102.022
EB and AEB Generator Loss of Power Test
Revision 0
SMP-001
Metal Detection Equipment
Revision 4
SMP-003
X-Ray Equipment
Revision 7
SMP-006
Microwave Intrusion Detection Equipment
Revision 5
SMP-011
Perifield-M Perimeter Detection Equipment
Revision 2
SMP-012
Protected Area (PA) Vehicle Barrier System
Revision 1
SMP-013
Handheld Metal Detection Equipment
Revision 1
SMP-015
N-Smart Access Control System
Revision 0
SMP-016
Owner Controlled Area (OCA) Vehicle Barrier System
Revision 0
SMP-018
OCA Microwave Early Warning System
Revision 0
SMP-019
OCA Perifield-M Early Warning System
Revision 0
SPP-222
Operational Testing of Security System Components
Revision 3
SPP-223
Security Surveillance System Operational Testing
Revision 7
Procedures
SPP-224
Operational Testing of Security, Access Control, and Intrusion
Detection Systems
Revision 6
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SPP-225
Perimeter Intrusion Detection System Operational Testing
Revision 6
SPP-225
Perimeter Intrusion Detection System Operational Testing
Revision 6
SPP-226
Operational Testing of Security Communication Systems
Revision 4
SPP-227
Special Security Equipment Operational Testing
Revision 0
SPP-228
Search Equipment Operational Test Procedure
Revision 7
SPP-229
Operational Testing of Duress Alarm Devices
Revision 1
SPP-230
Security Lighting System Inspection
Revision 2
SPP-231
Security Barrier and Lock System Operational Test or
Inspection
Revision 4
SPP-236
Operation of the Vehicle Barrier System Checkpoint
Revision 2
Security Compliance Reviews and Screenings
Revision 6
Risk Assessment Process
Revision 0
SY-AA-SCPIP-
24
Compensatory Measures
Revision 3
SY-AA-TR-102
Weapons Accountability, Testing, and Maintenance
Revision 15
Self-Assessments
25-01: Security
25 Fleet Security Audit
3/18/2025
Work Orders
201709393
88101023650
201735596
201754304
201763106
201769270
201769293
SLED Annual Review Training
Various Security Officer Training Records
Security Annual Exam 2025
Exam A
Exam B
LP 1038
React to Tampering, Vandalism, or Malicious Mischief
LP 1114
Use of Force
Miscellaneous
LP 1304
New Hire Final Examination
A Version
B Version
C Version
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
LP 2406
Firearm Familiarization
Revision 13
LP 2408
Tactical Qualification Course
Revision 28
11
ON-THE-JOB TRAINING WORKSHEET - ARMED
RESPONDER
Revision 9
SPP-300
Security Training and Qualification Program: Training
Revision 9
Procedures
SPP-301
Security Training and Qualification Program: Qualification
Revision 9
Procedures
V.C. Summer Physical Security Plan
Revision 21
NRC/INPO/WANO Performance Indicator and MOR Reporting
Revision 4
71151
Procedures
Regulatory Assessment Performance Indicator Data Reporting
Revision 2