Security Baseline Inspection Report 05000395/2025401
ML25212A142
Person / Time
Site: Summer 
Issue date: 08/05/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS/NSB
To: Carr E
Dominion Energy South Carolina
References
IR 2025001
Download: ML25212A142 (1)


Text

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - SECURITY BASELINE INSPECTION REPORT 05000395/2025401

Dear Eric S. Carr:

On July 17, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station, Unit 1 and discussed the results of this inspection with Fikiri Newton and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000395 License No. NPF-12

Enclosure:

As stated

Inspection Report

Docket Number:

05000395

License Number:

NPF-12

Report Number:

05000395/2025401

Enterprise Identifier:

I-2025-401-0052

Licensee:

Dominion Energy South Carolina (DESC)

Facility:

Virgil C. Summer Nuclear Station, Unit 1

Location:

Jenkinsville, SC

Inspection Dates:

July 14, 2025 to July 17, 2025

Inspectors:

J. Justice, Senior Physical Security Inspector

J. Stovall, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Virgil C. Summer Nuclear Station,

Unit 1, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: 02.01(b,c,d), 02.02(c,d,e,f,g), 02.03(a), 02.04(a,c,d,e), 02.05(a)
  • Tier II: 02.06(c), 02.08(a), 02.08(c), 02.08(e)
  • Tier III: 02.09

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: 02.01(a), 02.02(a,b,c,d,e,f,g,h,i), 02.03(a,b,c), 02.04(a,b,c,f,g),02.05(b,c,d), 02.06(b,d,e), 02.07(a,b,c,d), 02.08(a,b,c,d,e)
  • Tier II: 02.09(a,b), 02.11(d), 02.13(a)
  • Tier III: 02.14

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1)

  • Tier I: 02.02(c,d,f), 02.03(a,b,c), 02.04(a)
  • Tier II: 02.05(a,b,c), 02.06(b), 02.08(a)
  • Tier III: 02.10, 02.14(a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

procedure elements: Security Plan Changes

(1) Since the last NRC baseline inspection of this program area, Virgil C. Summer Nuclear Station Physical Security Plan, Revision 21, was implemented based on Virgil C. Summer Nuclear Station's evaluation, and in accordance with 10 CFR 50.54(p)(2), that the change resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan change to evaluate for potential decreases in the safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of this change.

Therefore, the change remains subject to future NRC inspection in its entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicator submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) July 2024 - June

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On July 17, 2025, the inspectors presented the security baseline inspection results to Fikiri Newton and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

263245 1283788

262756

Miscellaneous

D06638

EntryScan 4e trace detection device

March 4,

24

SPP-228

Search Equipment Operational Test Procedure

Revision 7

SY-AA-117

Search Programs

Revision 5

71130.02

Procedures

SY-AA-119

Protected Area Access Control

Revision 7

Corrective Action

Documents

283475 1281577

281579 1294487

288184 1285723

283732 1283520

275259 1273619

271810

Corrective Action

Documents

Resulting from

Inspection

296478 1296479

PTP-102.022

EB and AEB Generator Loss of Power Test

Revision 0

SMP-001

Metal Detection Equipment

Revision 4

SMP-003

X-Ray Equipment

Revision 7

SMP-006

Microwave Intrusion Detection Equipment

Revision 5

SMP-011

Perifield-M Perimeter Detection Equipment

Revision 2

SMP-012

Protected Area (PA) Vehicle Barrier System

Revision 1

SMP-013

Handheld Metal Detection Equipment

Revision 1

SMP-015

N-Smart Access Control System

Revision 0

SMP-016

Owner Controlled Area (OCA) Vehicle Barrier System

Revision 0

SMP-018

OCA Microwave Early Warning System

Revision 0

SMP-019

OCA Perifield-M Early Warning System

Revision 0

SPP-222

Operational Testing of Security System Components

Revision 3

SPP-223

Security Surveillance System Operational Testing

Revision 7

71130.04

Procedures

SPP-224

Operational Testing of Security, Access Control, and Intrusion

Detection Systems

Revision 6

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SPP-225

Perimeter Intrusion Detection System Operational Testing

Revision 6

SPP-225

Perimeter Intrusion Detection System Operational Testing

Revision 6

SPP-226

Operational Testing of Security Communication Systems

Revision 4

SPP-227

Special Security Equipment Operational Testing

Revision 0

SPP-228

Search Equipment Operational Test Procedure

Revision 7

SPP-229

Operational Testing of Duress Alarm Devices

Revision 1

SPP-230

Security Lighting System Inspection

Revision 2

SPP-231

Security Barrier and Lock System Operational Test or

Inspection

Revision 4

SPP-236

Operation of the Vehicle Barrier System Checkpoint

Revision 2

SY-AA-109

Security Compliance Reviews and Screenings

Revision 6

SY-AA-129

Risk Assessment Process

Revision 0

SY-AA-SCPIP-

24

Compensatory Measures

Revision 3

SY-AA-TR-102

Weapons Accountability, Testing, and Maintenance

Revision 15

Self-Assessments

25-01: Security

25 Fleet Security Audit

3/18/2025

Work Orders

201709393

88101023650

201735596

201754304

201763106

201769270

201769293

SLED Annual Review Training

Various Security Officer Training Records

Security Annual Exam 2025

Exam A

Exam B

LP 1038

React to Tampering, Vandalism, or Malicious Mischief

LP 1114

Use of Force

71130.07

Miscellaneous

LP 1304

New Hire Final Examination

A Version

B Version

C Version

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

LP 2406

Firearm Familiarization

Revision 13

LP 2408

Tactical Qualification Course

Revision 28

SP-300

11

ON-THE-JOB TRAINING WORKSHEET - ARMED

RESPONDER

Revision 9

SPP-300

Security Training and Qualification Program: Training

Revision 9

Procedures

SPP-301

Security Training and Qualification Program: Qualification

Revision 9

71130.09

Procedures

V.C. Summer Physical Security Plan

Revision 21

LI-AA-500

NRC/INPO/WANO Performance Indicator and MOR Reporting

Revision 4

71151

Procedures

SY-AA-126

Regulatory Assessment Performance Indicator Data Reporting

Revision 2