05000335/LER-1979-031-01, /01T-0:on 790927,during Planned Shutdown,Qc Check of Installation of Safety Injection Tank Sample Lines Showed Four Raceway Clips Welded to Vessel Wall.Caused by Contractor

From kanterella
Revision as of 09:20, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/01T-0:on 790927,during Planned Shutdown,Qc Check of Installation of Safety Injection Tank Sample Lines Showed Four Raceway Clips Welded to Vessel Wall.Caused by Contractor
ML17266A113
Person / Time
Site: Saint Lucie 
Issue date: 10/11/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A611 List:
References
LER-79-031-01T, LER-79-31-1T, NUDOCS 7912040444
Download: ML17266A113 (2)


LER-1979-031, /01T-0:on 790927,during Planned Shutdown,Qc Check of Installation of Safety Injection Tank Sample Lines Showed Four Raceway Clips Welded to Vessel Wall.Caused by Contractor
Event date:
Report date:
3351979031R01 - NRC Website

text

NRC FORM P 77 I LICENSEE EVENT REPORT U S NUCI.KAR REGULATORY~MISSION 2

8 CONDT

~Q 2

'Q IPI.EASE PRINT OR TYPe RL L R'EOUIREO II'JFORMATIONI 1

!IQ I

I I

I I S~l>>

11 Q~Q 9

IJCE.'cSEE CODE LIC88 $6 9Iu M6 8 R 1626 LiCEAu$6 TYJ$

20

$ 1 ~T Q

",;;~L'QD 5

00 0

5 5

~09 5

77. DS~10111 7

9 Q 60 61 DOCK~ NUMSER 66 69 EVENT DATE 14 1$

ilEPORT DATE 60 EVENT OESCRIPTION ANOPROS ABI 0 CONSeQUENCES QIO While shutdown during a planned pl'ant outage, a

gC verification check of

~03 the instal 1 ation of new Safety Injection Tank sample 1 ines showed that four racewa cl i s had been welded to the contai nment vessel wall.

The cl i. s 9

were 1 2" x 2" i n size and rovided su ort to the 3 8" sam 1 e 1 i ne.

The cl ips were installed during the 1 979 refuel ing outage, and thei r location

~DT noted after corn 1 etion of the modificati on.

Contai nment vessel inte rit

~oa r emai ned intact.

Thi s i s the first occurrence of thi s

- t e.

1 3

9 SVSTc

'M

CAUSE

C~USE VALVE CDQ E coDE SUecDDE CCM~NENT CODE DDE SUBCQOS 0 S.MS LES Lxzxix 7 1 xlS ~zS ~zS 2

8 9

10 11 12 12 1$

19 20 8 80U ENTlAL OCCURRENCE REPORT llEVISlON~

~

LERIRO EVENTYEAR REPORT NO.

CODE TYPE

~

HO.

Q57 0590'07 [779] ~

~31

~~

~01

~T

'O

'21 12 12 24.

2611 ae 29 20 31 21 ACAQN FVlllAE EPPECT SHUTDOWN A.. ACHMENT NPRD" "P.llMKCOMP.

CDMP0 11 8NT TAKEN ACTION CN PLANT METNQD NOuRS

+2'2 3'U'SMITTEQ FORM >US.

SUPPLIER MANVPA AIRER

~AS~AS

~AS

~AS

~00 0

11

~AQ

~AS

~AS

~ADI 9 9 I::

34 2$

26 31 41

~4 41 I

CAUSE DESCRIPTION ANO CORRECTIVE ACTIONS Q22 0

The

- cli s were we 1 ded to the conta inment vessel b

contractor ersonne 1..

The were -removed from the contai nment vessel wall b rindi n and h v been re-i nstal 1 ed in a proper 1 ocati on.

The wall area i n uesti on was heat-treated and 'then non-destructi vel tested PT to verif wal 1 1

8 9

FACILITY.

ST*TVS

~~a POWDER 5

~G Qaa

~00 1 0 LQD 7

8 9

10 12 ACTIVITY CONTENT

~

RELEASED OP RELEASE 8

~Z Q33

~ZQ34 l

8 9

10 11 PtA~NEL EX>QSVRES

~57

~0. 0

.0 QDD ~ZQDD 2

S 11 I'2 12 PEilSONNEL INJURIES a ~00 0

QAD NA

~

I.CSS OP QR DAMAGETO PACIUTY 3

,YPc DESCWPTtON I ~+9 ~ZQ4'A 2

- 8 2 '0 W6LIC:TAY

!SSUED DESCRIPT:Ou ~~

o ~NQ NA 90 80 DISCOVERY DESCRIPTION Q2 Control Ins ecti on METHOD OP OMEN STATUS ~

O1$ COVERY NA

'CQ31 Oual ity 4$

80 AMOUNTQP icnvlTY QSS NA LOCATIONOP RELEASE Q38 44

~l$

NA 7ggg040+++

, NRC USE ONI Y 6$

$ 9 30

. (305 552-3802 NAME oF PREPAR R

M. A. Scho man inteqri t and to assure that no further action was re ui red.

J

g>i

~

r l

~ 's