Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20216D350 | 6 April 1998 | LER 98-S02-00:on 980309,suspension of Safeguards Under 10CFR50.54(x) During Severe Storm Occurred Due to Personnel Safety Concerns.Caused by Severe Weather.Failed Surge Protection Was Replaced | |
L-96-296, LER 96-S02-00:on 961011,failed to Terminate Access of Temporary Licensee Employee.Caused by Cognitive Personnel Error.Security Unassigned Card Key & Plant Administrative Procedure 0010509 Revised | 7 November 1996 | LER 96-S02-00:on 961011,failed to Terminate Access of Temporary Licensee Employee.Caused by Cognitive Personnel Error.Security Unassigned Card Key & Plant Administrative Procedure 0010509 Revised | Time of Discovery |
05000335/LER-1981-039, Updated LER 81-039/03L-1:on 810802,during Power Operation, PORV Block Valve MV1403 Would Not Close.Caused by Loose Electrical Connection on Valve Limit Switch.Connection Tightened During Oct 1981 refueling.W/840319 Ltr | 19 March 1984 | Updated LER 81-039/03L-1:on 810802,during Power Operation, PORV Block Valve MV1403 Would Not Close.Caused by Loose Electrical Connection on Valve Limit Switch.Connection Tightened During Oct 1981 refueling.W/840319 Ltr | |
ML20062A097 | 27 September 1978 | /03L-0 on 780905:During Full Pwr Oper 2 Damper Motors in the Suction Line for ECCS Area Exhaust Fan HVE-9B Blew Control Circuit Fuses,Caused by Loss of Insulating Fluid Thru Leaking Gasket in One Motor,Shorting Both Out |