LER-1979-003, /03L-0 on 790106:during Rx Runback Following Turbine Trip,Main Feedwater Block Valve FWV-30 Did Not Close.Caused by Valve Sticking on Its Back Seat.Corrective Action:Manual Cycling |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 3021979003R03 - NRC Website |
|
text
_.
NRC FORM 364 U. S. NUCLEAR REGULATORY COMMISSION
+
i7 77)
LICENSEE EVENT REPORT EXHIBIT A i
CONTROL SLCCic. l l l 1 l l l@
(PLEASE PRINT OR TYPE At,L REQUIRED INFORMATIONI t
6 o ji lF I LI Oj 0 l ;0 ; 0 lg; 4 ; 1,1 l ; 1 ;g; _;_ l q R) PI 3 lgl 0 t Ol-l 0 ] 0l 0 i g
7 a e uCassas ccoa i. u ucassa~oussa a
- s ucassa Tv.e
.a si c.r sa l
CON'T ITT~l s[**,c 11@l0151 0 t -10J 3l0121@l o f 110 l 617 I 91@lo i 112 I 61 710 l@
7 8
60 41 GQcafTsyvgga oss 69 (vtNT DAfg 7e
'l mE*CRT Dart 60 EVENT DESCRIPLON AND PROSABLE CCNSEcvENCES h a#2 l At 0242, during Rx runback following a turbine trip. it was discovered I
that a main feedwater block valve (FWV -30) did not close.
This is contrary o..
- to Technical Specification 3.3.2.1, Table 3.3-5.
No effect upon public I
ois I health and safety as redundant systems were,vailable, a nnor,hle.
Tvn I
,,, i previous occurrences of this tyoe reported, but first occurrence for FWV-30 0
7 l
I a.e; I I
SYS?t u CALSE CALSE COU8 vai,v t COCE CCCE SLBCOOE COY 80%ss? CODE SLBOOOE SL4COCE IHlHi@ W @ W @ lV l Al U VI ElXl@ W @ ] @
a et r
a 9
'3 tt 12 13 is i,
- J CCOU4afsCE REPCat RE#8DCN SE C'e. ENTI A L a
,_nE=TvnA=
ann = T w o.
C::E nas so
@ syy..o 7l9l
(--j l 01013 I W
10 ! 3 I LL_l
{, -J
[_0J a E ac"
_v u
,A 2,
2, u
u n N AC C 0
wCL*S SS e PCa 5
56 **L E UA 8A RER Ig@@ Q@
Q@
l 010 l Of Q
[_Yj @
[N_j@
[A_J@
l C l 215 l Sl@
.2 as 1
Aa
<n 2
3 u
au CAvsE cESCRiptON AND CCRREC AVE ACTIONS h io,l The cause of 'this anomaly is attributed to FWP-30 beine stuck on its back t iseat.
FWV-30 was manually taken off its backseat and eveled.
Operabilitv1 i
was restored following satisfactory completion of engineering safeguards
, i 3
[ actuation response time test (SP-1351 i 6.s I
f
.o
$TA
%80nf8 OTWimSTATUS t$
av
$ Ovgpv ;g3;.ier:ON Ljg@ l 01415 l@l Runback l [Jj@l Ooerator observation l
ies i
u u
so s,c,,s,7,..u m, =.id.,s,.s.:U,7 c..:miT @ l Lxr.2s...ae,@
7 c
..aoE MA Ng l
i 6
l
'v*t O t s;4T'ON I010lOl@[lj@l NA l
i
' '..s:ssa'. wies
=,,;...v,cs @
m l 010 I Ol@l NA i
,o ges==Av ge=ACwT g l_.zJ@L,3_
NA I
T 4
9 ga
,$jg,g @l cgg;a at Os
[
NA I IIfIIfIIII i' I a
4.
.2 r
,2 3, pJ.
C,, %-
- - esE _ _1904)795-6486 J
sv. E C...E. Aa E R j.
I (S
TTACHED SUPPLEMENTARY INFORMATION SBEET) 7902050 /87
SUPPLEMENTARY INFORMATION Report No.:
50-302/79-003/03L-0 Facility:
Crystal River Unit #3 Report Date:
26 January 1979 Occurrence Date:
6 January 1979 Identification of Occurrence:
Feedwater block valve (FWV-30) inoperable contrary to response time specified in Technical Specification 3.3.2.1, Table 3.3-5.
Conditions Prior to Occurrence:
At 0242, during a reactor runback following a turbine trip, it was discovered that a main feedwater block valve (FWV-30) did not close.
"A" feedwater line was isolated and the reactor manually tripped.
Feedwater flow was re-established with emergency feed-water pump (EFP-2).
FWV-30 was rendered operable at 0615, 6 January 1979.
Designation of Apparant Cause:
The cause of this anomaly aas attributed to FWV-30 being stuck on its back seat.
Analysis of Occurrence:
There was no hazard to the plant or general public as redundant emergency feedwater systems were available and operable.
Corrective Action
No corrective action necessary.
FWV-30 was manually taken off its back seat, cycled and rendered operable after satisfact-ory completion of engineering safeguards actuation response time test (SP-135).
Failure Data:
Two previous occurrences of this type but first occurrence of FWV-30.
/rc
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000302/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000302/LER-1979-001-03, /03L-0 on 790101:during Operating Daily Surveillance Log Survey (SP-300),noted That Pressure in B Core Flood Tank Was 630 Psi.Caused by Operator Error During Repressurization | /03L-0 on 790101:during Operating Daily Surveillance Log Survey (SP-300),noted That Pressure in B Core Flood Tank Was 630 Psi.Caused by Operator Error During Repressurization | | | 05000302/LER-1979-002-03, /03L-0 on 790102:33 Ft Wind Direction Monitor Was Inoperable.Caused by Wind Direction Sensor Bearing Being Contaminated W/Coal Dust.Sensor Renewed Thru Normal Maint | /03L-0 on 790102:33 Ft Wind Direction Monitor Was Inoperable.Caused by Wind Direction Sensor Bearing Being Contaminated W/Coal Dust.Sensor Renewed Thru Normal Maint | | | 05000302/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000302/LER-1979-003-03, /03L-0 on 790106:during Rx Runback Following Turbine Trip,Main Feedwater Block Valve FWV-30 Did Not Close.Caused by Valve Sticking on Its Back Seat.Corrective Action:Manual Cycling | /03L-0 on 790106:during Rx Runback Following Turbine Trip,Main Feedwater Block Valve FWV-30 Did Not Close.Caused by Valve Sticking on Its Back Seat.Corrective Action:Manual Cycling | | | 05000302/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000302/LER-1979-004-03, /03L-0 on 790115:cable Tunnel Sump Pump Failed to Start During Operability Verification.Maint Restored Sump Pump Operability.Caused Attributed to Failure of Pump | /03L-0 on 790115:cable Tunnel Sump Pump Failed to Start During Operability Verification.Maint Restored Sump Pump Operability.Caused Attributed to Failure of Pump | | | 05000302/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000302/LER-1979-005-01, Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Nec | Discusses Commitment Stated in LER 79-005-01T-1 Re MSIV Valves Not Closing within Design Time of Five Seconds During Double Ended Pipe Rupture.Util Has Determined That Upgrading Air Circuit to Seismic Class I Will Not Be Necessary | | | 05000302/LER-1979-006, Forwards LER 79-006/01T-0 | Forwards LER 79-006/01T-0 | | | 05000302/LER-1979-006-01, /01T-0 on 790201:figures for Transient Limits on Rapid Depressurizations & High Pressure Injection Tests in Disagreement W/Cycle 2 Reload Rept.Tech Specs Will Be Revised | /01T-0 on 790201:figures for Transient Limits on Rapid Depressurizations & High Pressure Injection Tests in Disagreement W/Cycle 2 Reload Rept.Tech Specs Will Be Revised | | | 05000302/LER-1979-007-03, /03L-0 on 790117:reactor Coolant Dose Equivalent I-131 Exceeded 1.0 Mci.Caused by Expected Transient Spikes Following Reactor Trip & Known Leaking Fuel Pins | /03L-0 on 790117:reactor Coolant Dose Equivalent I-131 Exceeded 1.0 Mci.Caused by Expected Transient Spikes Following Reactor Trip & Known Leaking Fuel Pins | | | 05000302/LER-1979-007, Forwards LER 79-007/03L-0 | Forwards LER 79-007/03L-0 | | | 05000302/LER-1979-008-03, /03L-0 on 790119:RC3-GP3-BL4 Light Did Not Extinguish When Test Switch Returned to Off Position.Caused by Dirty Contacts in Relay | /03L-0 on 790119:RC3-GP3-BL4 Light Did Not Extinguish When Test Switch Returned to Off Position.Caused by Dirty Contacts in Relay | | | 05000302/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000302/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000302/LER-1979-009-03, /03L-0 on 790124:while Performing Reactor Protection Sys Functional Testing,Rod Group 6 Dropped Into Core,Rod Group Overlap Was Exceeded.Caused by a AC Power Breaker Being Left Open | /03L-0 on 790124:while Performing Reactor Protection Sys Functional Testing,Rod Group 6 Dropped Into Core,Rod Group Overlap Was Exceeded.Caused by a AC Power Breaker Being Left Open | | | 05000302/LER-1979-010-03, /03L-0 on 790125:during Routine Operations,Air Handling Fan Failed to Start.Caused by Faulty Overcurrent Timing Relay | /03L-0 on 790125:during Routine Operations,Air Handling Fan Failed to Start.Caused by Faulty Overcurrent Timing Relay | | | 05000302/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000302/LER-1979-011-03, /03L-0 on 790210:reactor Coolant Dose Equivalent I-131 Exceeded Tech Spec Limits.Caused by Expected Spike Following Reactor Trip & Known Leaking Fuel Pins.Reactor Coolant Sys Cleanup Returned to Acceptable Limits | /03L-0 on 790210:reactor Coolant Dose Equivalent I-131 Exceeded Tech Spec Limits.Caused by Expected Spike Following Reactor Trip & Known Leaking Fuel Pins.Reactor Coolant Sys Cleanup Returned to Acceptable Limits | | | 05000302/LER-1979-012, Forwards LER 79-012/03L-0 | Forwards LER 79-012/03L-0 | | | 05000302/LER-1979-012-03, /03L-0 on 790214:during Safeguards Test, RB-3GP-2 Light Did Not Illuminate.Caused by Burr on Relay Shaft.Relay Cleaned & Burr Removed | /03L-0 on 790214:during Safeguards Test, RB-3GP-2 Light Did Not Illuminate.Caused by Burr on Relay Shaft.Relay Cleaned & Burr Removed | | | 05000302/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000302/LER-1979-014-03, /03L-0 on 790220:decay Heat Cooler 3A Outlet Remote Shutdown Temp Indicator Inaccurate & Rendered Inoperable.Caused by Failed Resistance Temp Detector (Rtd). RTD Replaced & Sys Recalibr | /03L-0 on 790220:decay Heat Cooler 3A Outlet Remote Shutdown Temp Indicator Inaccurate & Rendered Inoperable.Caused by Failed Resistance Temp Detector (Rtd). RTD Replaced & Sys Recalibr | | | 05000302/LER-1979-015-03, /03L-0 on 790221:fire Svc Tanks 1-B & 1-A Contained Less than Min Volume Required by Tech Specs. Caused by Improper Design.Engineering Evaluation Initiated | /03L-0 on 790221:fire Svc Tanks 1-B & 1-A Contained Less than Min Volume Required by Tech Specs. Caused by Improper Design.Engineering Evaluation Initiated | | | 05000302/LER-1979-015, Forwards LER 79-015/03L-0 | Forwards LER 79-015/03L-0 | | | 05000302/LER-1979-016, Forwards Supplementary Info Re LER 79-016/04X-0 | Forwards Supplementary Info Re LER 79-016/04X-0 | | | 05000302/LER-1979-017, Forwards LER 79-017/03L-0 | Forwards LER 79-017/03L-0 | | | 05000302/LER-1979-017-03, /03L-0 on 790223:heat Trace Recorder for Concentrated Boric Acid Flowpath Was Malfunctioning & Rendered Inoperable.Caused by Failed Recorder Drive Wheel. Drive Wheel Replaced & Heat Trace Recorder Returned to Svc | /03L-0 on 790223:heat Trace Recorder for Concentrated Boric Acid Flowpath Was Malfunctioning & Rendered Inoperable.Caused by Failed Recorder Drive Wheel. Drive Wheel Replaced & Heat Trace Recorder Returned to Svc | | | 05000302/LER-1979-018, Forwards LER 79-018/03L-0 | Forwards LER 79-018/03L-0 | | | 05000302/LER-1979-018-03, /03L-0 on 790301:inner Airlock Door Found Unlatched.Caused by Inadequate Latching Design.Corrective Action Will Be Determined Upon Results of Engineering Info Request | /03L-0 on 790301:inner Airlock Door Found Unlatched.Caused by Inadequate Latching Design.Corrective Action Will Be Determined Upon Results of Engineering Info Request | | | 05000302/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000302/LER-1979-019-03, /03L-0 on 790223:motor Driven Emergency Feedwater Pump Discharge Pressure Gauge EF-2-PI Was Out of Calibr. Caused by Inoperable Dampening Snubber Located in Sensing Line.Snubber Was Replaced | /03L-0 on 790223:motor Driven Emergency Feedwater Pump Discharge Pressure Gauge EF-2-PI Was Out of Calibr. Caused by Inoperable Dampening Snubber Located in Sensing Line.Snubber Was Replaced | | | 05000302/LER-1979-020, Forwards LER 79-020/03L-0 | Forwards LER 79-020/03L-0 | | | 05000302/LER-1979-020-03, /03L-0 on 790228:following Reactor Trip,Chem/Rod Sampling Revealed Reactor Coolant Dose Equivalent I-131 Exceeded 1.0 Mci Per Gram,Contrary to Tech Specs.Caused by Spike Following Reactor Trip & Leaking Fuel Pins | /03L-0 on 790228:following Reactor Trip,Chem/Rod Sampling Revealed Reactor Coolant Dose Equivalent I-131 Exceeded 1.0 Mci Per Gram,Contrary to Tech Specs.Caused by Spike Following Reactor Trip & Leaking Fuel Pins | | | 05000302/LER-1979-021-04, /04L-0 During 1978:difference of More than Two Std Deviations Existed Between Preoperational Study & Operational Study in Metabolic Functions of Discharge Salt Marshes Adjacent to Facility.Cause Natural or Seasonal | /04L-0 During 1978:difference of More than Two Std Deviations Existed Between Preoperational Study & Operational Study in Metabolic Functions of Discharge Salt Marshes Adjacent to Facility.Cause Natural or Seasonal | | | 05000302/LER-1979-021, Forwards LER 79-021/04L-0 | Forwards LER 79-021/04L-0 | | | 05000302/LER-1979-023, Forwards LER 79-023/03L-0 | Forwards LER 79-023/03L-0 | | | 05000302/LER-1979-023-03, /03L-0 on 790308:discovered RCS C1 Concentration Was .17ppm,contrary to Tech Specs.Caused by Appearance of Suspended Solids During Cooldown When Boron Concentration Increased.Purification Sys Reduced Concentration | /03L-0 on 790308:discovered RCS C1 Concentration Was .17ppm,contrary to Tech Specs.Caused by Appearance of Suspended Solids During Cooldown When Boron Concentration Increased.Purification Sys Reduced Concentration | | | 05000302/LER-1979-024-03, /03L-0 on 790315:during Plant Heatup,Discovered That Temp Device at 175 Ft Elevation of Meteorological Monitoring Tower Was Inoperable.Cause Unknown.Temp Device Tested Satisfactorily & Returned to Svc | /03L-0 on 790315:during Plant Heatup,Discovered That Temp Device at 175 Ft Elevation of Meteorological Monitoring Tower Was Inoperable.Cause Unknown.Temp Device Tested Satisfactorily & Returned to Svc | | | 05000302/LER-1979-024, Forwards LER 79-024/03L-0 | Forwards LER 79-024/03L-0 | | | 05000302/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000302/LER-1979-026-03, /03L-0 on 790318:during Reactor Startup,Discovered Absolute Position Indication for Rod 8 Was Inoperable.Caused by Sticking Reed Switch.Variable Ac Frequency,Applied to Reed Switch Circuit,Eliminated Sticking | /03L-0 on 790318:during Reactor Startup,Discovered Absolute Position Indication for Rod 8 Was Inoperable.Caused by Sticking Reed Switch.Variable Ac Frequency,Applied to Reed Switch Circuit,Eliminated Sticking | | | 05000302/LER-1979-027, Forwards Supplemental Info for LER 79-027/04X-0 | Forwards Supplemental Info for LER 79-027/04X-0 | | | 05000302/LER-1979-028, Forwards LER 79-028/03L-0 | Forwards LER 79-028/03L-0 | | | 05000302/LER-1979-028-03, /03L-0 on 790321:while Performing Emergency Feedwater Sys Demonstration,Discovered Pump Discharge Pressure Gauge EF-2-PI Inoperable.Caused by Failed Pressure Gauge.Gauge Replaced | /03L-0 on 790321:while Performing Emergency Feedwater Sys Demonstration,Discovered Pump Discharge Pressure Gauge EF-2-PI Inoperable.Caused by Failed Pressure Gauge.Gauge Replaced | | | 05000302/LER-1979-029, Forwards LER 79-029/03L-0 | Forwards LER 79-029/03L-0 | | | 05000302/LER-1979-029-03, /03L-0 on 790321:discovered Makeup Pump 3-C Discharge Stopcheck Valve MUV-2 Was Improperly Positioned. Cause unknown.MUV-2 Reset to Proper Throttle Setting & Returned to Svc | /03L-0 on 790321:discovered Makeup Pump 3-C Discharge Stopcheck Valve MUV-2 Was Improperly Positioned. Cause unknown.MUV-2 Reset to Proper Throttle Setting & Returned to Svc | | | 05000302/LER-1979-031-01, /01T-0 on 790412:during Routine Radwaste Release, Release Monitor Went Into High Alarm Because Radwaste Isolation Valves WDV-320 & 321 Failed to Close.Caused by Sticking Contacts in Monitor Bypass Switch | /01T-0 on 790412:during Routine Radwaste Release, Release Monitor Went Into High Alarm Because Radwaste Isolation Valves WDV-320 & 321 Failed to Close.Caused by Sticking Contacts in Monitor Bypass Switch | | | 05000302/LER-1979-031, Forwards LER 79-031/01T-0 | Forwards LER 79-031/01T-0 | |
|