ML14016A474
From kanterella
Revision as of 14:25, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML14016A474 | |
Person / Time | |
---|---|
Site: | Watts Bar, 07007018 |
Issue date: | 01/16/2014 |
From: | Hruby R A Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
Shared Package | |
ML14036A009 | List: |
References | |
TAC L33242 | |
Download: ML14016A474 (4) | |
Category:Letter
MONTHYEARCNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024
[Table view]Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24009A1712024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Letter ML24019A0722024-02-14014 February 2024 Request for Withholding Information from Public Disclosure IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation 2024-09-05 Category:Operating Procedures MONTHYEARML20198M4202020-07-0808 July 2020
[Table view]William Bill Sprinkle, Response to Apparent Violation, IA-20-018 CNL-15-047, Submittal of Pre-Operational Test Instruction, 2-PTI-062-03, Rev 0, Hft - Charging and Letdown.2015-03-0505 March 2015 Submittal of Pre-Operational Test Instruction, 2-PTI-062-03, Rev 0, Hft - Charging and Letdown. CNL-15-026, Submittal of Pre-operational Test Instruction2015-02-0505 February 2015 Submittal of Pre-operational Test Instruction CNL-15-024, Submittal of Pre-operational Test Instruction 2-PTI-043-02, Rev. 0, Primary Sampling System2015-02-0505 February 2015 Submittal of Pre-operational Test Instruction 2-PTI-043-02, Rev. 0, Primary Sampling System CNL-15-025, Submittal of Pre-operational Test Instruction 2-PTI-999-01, Rev. 0, Operational Vibration Testing2015-02-0505 February 2015 Submittal of Pre-operational Test Instruction 2-PTI-999-01, Rev. 0, Operational Vibration Testing CNL-14-230, Submittal of Pre-operational Test Instruction, 2-PTI-074-02B, Rev. 0, RHR Hft Heatup/Cooldown2015-01-0707 January 2015 Submittal of Pre-operational Test Instruction, 2-PTI-074-02B, Rev. 0, RHR Hft Heatup/Cooldown CNL-14-219, Submittal of Pre-operational Test Instruction, 2-PTI-999-02, Rv. 0, Thermal Expansion2015-01-0707 January 2015 Submittal of Pre-operational Test Instruction, 2-PTI-999-02, Rv. 0, Thermal Expansion ML14080A0232014-03-11011 March 2014 Submittal of Pre-Operational Test Instruction ML14055A2762014-02-18018 February 2014 Pre-Operational Test Instruction 2-PTI-063-01, Safety Injection System SIS Integrated Test. ML14016A4742014-01-16016 January 2014 Request for Additional Information Concerning Material Control and Accounting Regarding Part 70 License Renewal (TAC No. L33242) ML14015A0312014-01-0707 January 2014 Watts Bar Nuclear Plant, Unit 2, Submittal of Pre-op Test Instructions ML13226A1302013-08-0707 August 2013 Submittal of Pre-Op Test Instructions ML14055A2772013-06-19019 June 2013 Pre-Operational Test Instruction 2-PTI-068-11, Cross Calibration of RCS Temperature Sensors. ML13091A0372013-03-26026 March 2013 Submittal of Pre-op Test Instructions for Condenser Vacuum and Flood Mode Boration ML13071A3242013-03-0606 March 2013 Submittal of Pre-op Test Instruction ML12320A2952012-11-0909 November 2012 Submittal of Pre-op Test Instructions 2-PTI-003B-04, Auxiliary Feedwater Pumps & Valves Logic Test and 2-PTI-092-01, Power Range Nuclear Instrumentation ML12234A4042012-08-15015 August 2012 Submittal of Pre-Op Test Instruction ML12163A3712012-06-0505 June 2012 Submittal of Pre-op Test Instruction, 2-PTI-067-01, Revision 0 ML12041A3932012-02-0707 February 2012 Submittal of Pre-op Test Instructions ML12019A2722012-01-17017 January 2012 2-PTI-030L-01, Rev. 0, Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-op Test Instruction. ML11363A0102011-12-22022 December 2011 Submittal of Pre-op Test Instruction No. 2-PTI-099-04, Rev 0, Safeguards System ML11294A4382011-10-19019 October 2011 Submittal of Pre-op Test Instruction ML11279A1322011-10-0404 October 2011 Submittal of Pre-op Test Instruction ML11256A0492011-09-0808 September 2011 Submittal of Pre-op Test Instruction No. 2-PTI-067-03, Rev. 0, ERCW Valve Logic Test. ML1108804492011-03-25025 March 2011 Submittal of Pre-Op Test Instruction ML1106912152011-03-0707 March 2011 Submittal of Pre-op Test Instructions ML1036101142010-12-21021 December 2010 Submittal of Pre-op Test Instruction ML1020301312010-07-12012 July 2010 Submittal of Preoperational Test Instructions ML1109604472009-07-0202 July 2009 Technical Instruction TI-137, Revision 0, Control of Portable Two-Way Radios. ML0834601772008-12-0909 December 2008 Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) ML0832606712008-04-30030 April 2008 Package of Nuclear Safety Review Staff Repts for Which Complete Resolution of safety-related Issues Not Achieved. W/One Oversize Drawing. Continuation of Nuclear Safety Review Staff Repts ML0627000272006-09-27027 September 2006 Enclosure 1 Written Examination Performance Analysis with Recommended Substance Changes ML0521500332005-07-22022 July 2005 NPDES Permit No. TN0020168 - Phase II 316(b) Rule for Existing Facilities - Proposal for Information Collection for Supplemental Condenser Cooling Water System 2020-07-08 |
Retrieved from "https://kanterella.com/w/index.php?title=ML14016A474&oldid=412783"