8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1A, Tables
ML20189A069
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/29/2020
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20189A066 List:
References
RA-20-0136
Download: ML20189A069 (5)


Text

Oconee Nuclear Station UFSAR Appendix 1A. Tables Appendix 1A. Tables

Oconee Nuclear Station UFSAR Table 1-1 (Page 1 of 2)

(31 DEC 2000)

Table 1-1. Key Dates in Oconee History Oconee Unit 1

1. Construction Permit (CPPR-33)

Application Approved by NRC Expiration Date Original November 28, 1966 November 6, 1967 February 28, 1971 Extensions

1. Feb. 19, 1971 &

Feb. 23, 1971 February 27, 1971 September 30, 1971

2. Aug. 6, 1971 August 30, 1971 January 31, 1972
3. Dec. 20, 1971 January 28, 1972 June 30, 1972
4. June 2, 1972 June 27, 1972 February 28, 1973
2. Operating License (DPR-38)

February 6, 1973 February 6, 2013

3. Renewed Operating License (DPR-38)

May 23, 2000 February 6, 2033 Oconee Unit 2

1. Construction Permit (CPPR-34)

Application Approved by NRC Expiration Date Original November 28, 1966 November 6, 1967 February 28, 1971 Extensions

1. Jan. 25, 1972 March 1, 1972 February 28, 1973
2. Jan. 25, 1973 February 28, 1973 September 1, 1973
3. July 3, 1973 July 30, 1973 October l, 1973
4. Aug. 29, 1973 September 24, 1973 November 4, 1973
2. Operating License (DPR-47)

October 6, 1973 October 6, 2013

3. Renewed Operating License (DPR-47)

May 23, 2000 October 6, 2033 Oconee Unit 3

1. Construction Permit (CPPR-35)

Application Approved by NRC Expiration Date Original May 25, 1967 November 6, 1967 August 1, 1973 Extensions

1. July 3, 1973 July 30, 1973 June 30, 1974
2. May 14, 1974 July 5, 1974 September 30, 1974
2. Operating License (DPR-55)

July 19, 1974 July 19, 2014

3. Renewed Operating License (DPR-55)

May 23, 2000 July 19, 2034 Commercial Operation Dates:

Unit l July 15, 1973

Oconee Nuclear Station UFSAR Table 1-1 (Page 2 of 2)

(31 DEC 2000)

Unit 2 September 9, 1974 Unit 3 December 16, 1974

Oconee Nuclear Station UFSAR Table 1-2 (Page 1 of 1)

(31 DEC 2000)

Table 1-2. Engineered Safeguards Equipment System Total Equipment Installed/Unit High Pressure Injection System 3 pumps 1 storage tank Low Pressure Injection System 2 pumps1 2 heat exchangers Core Flooding Tanks 2 tanks Reactor Building Spray System 2 pumps 2 spray headers Reactor Building Coolers 3 coolers 3 fans Penetration RoomVentilation System 2 fans 2 filter assemblies Low Pressure Service Water System 3 pumps (Units 1&2) 2 pumps (Unit 3)

Note:

1. Plus one installed spare pump

Oconee Nuclear Station UFSAR Table 1-3 (Page 1 of 1)

(31 DEC 2000)

Table 1-3. Deleted Per 1997 Update