ML15280A508
From kanterella
Revision as of 15:56, 27 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Letter Sequence Other | |
---|---|
CAC:MF6609, SFDP Clarifications (Approved, Closed) | |
MONTHYEARCNL-15-052, Annual Insurance Status Report2015-04-0101 April 2015
[Table View]Annual Insurance Status Report Project stage: Request CNL-15-051, Guarantee of Payment of Deferred Premiums - 2014 Annual Report2015-04-0707 April 2015 Guarantee of Payment of Deferred Premiums - 2014 Annual Report Project stage: Request CNL-15-121, Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation2015-06-17017 June 2015 Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation Project stage: Request CNL-15-130, Distributed Control System (DCS) Data Storm Test Plan2015-07-10010 July 2015 Distributed Control System (DCS) Data Storm Test Plan Project stage: Request CNL-15-168, Notification of Construction Substantially Complete and Request for Operating License2015-08-12012 August 2015 Notification of Construction Substantially Complete and Request for Operating License Project stage: Request CNL-15-149, Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01)2015-08-13013 August 2015 Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01) Project stage: Request CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results2015-08-20020 August 2015 Submittal of Electromagnetic Interference (EMI) Survey Results Project stage: Request CNL-15-176, Financial Protection Requirements and Indemnity Agreements, Insurance Status2015-08-26026 August 2015 Financial Protection Requirements and Indemnity Agreements, Insurance Status Project stage: Request CNL-15-185, Supplement to Application to Update to License Condition 2.F to Allow Two-Unit Operation and Add License Condition (WBN-TS-15-01)2015-08-27027 August 2015 Supplement to Application to Update to License Condition 2.F to Allow Two-Unit Operation and Add License Condition (WBN-TS-15-01) Project stage: Request CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request2015-08-28028 August 2015 Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request Project stage: Request CNL-15-202, Financial Protection Requirements and Indemnity Agreements - Insurance Status Supplement2015-09-24024 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Supplement Project stage: Request CNL-15-211, Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement2015-09-29029 September 2015 Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement Project stage: Request CNL-15-208, Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 02015-09-30030 September 2015 Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 0 Project stage: Request CNL-15-206, Response to Follow-Up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results2015-10-0808 October 2015 Response to Follow-Up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results Project stage: Request CNL-15-193, Distributed Control System (DCS) Data Storm Test Results2015-10-0909 October 2015 Distributed Control System (DCS) Data Storm Test Results Project stage: Request ML15282A0512015-10-31031 October 2015 NUREG-0847, Supp. 29, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Docket No. 50-391, Tennessee Valley Authority. Project stage: Request ML15344A3182015-12-23023 December 2015 Issuance of Amendment Regarding Fire Protection License Conditions Project stage: Approval 2015-08-12 |
ML15280A508 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 10/07/2015 |
From: | Shea J W Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CNL-15-214, TAC ME3091 | |
Download: ML15280A508 (22) | |
Similar Documents at Watts Bar | |
---|---|
Category:Fire Protection Plan
MONTHYEARWBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022
[Table view]Update to Fire Protection Report Figures Redacted WBL-22-015, Update to Fire Protection Report2022-05-11011 May 2022 Update to Fire Protection Report CNL-15-214, Updated Pages for As-Constructed Fire Protection Report2015-10-0707 October 2015 Updated Pages for As-Constructed Fire Protection Report CNL-15-174, Submittal of Updated Pages for Unit 1/Unit 2 As-Constructed Fire Protection Report & License Condition 2.C(9) Addition Request2015-08-27027 August 2015 Submittal of Updated Pages for Unit 1/Unit 2 As-Constructed Fire Protection Report & License Condition 2.C(9) Addition Request CNL-15-149, Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01)2015-08-13013 August 2015 Application to Update Watts Bar Nuclear Plant Unit 1 License Condition 2.F to Allow Two-Unit Operation and Add License Condition 2.I (WBN-TS-15-01) ML15175A5082015-06-24024 June 2015 Watts Bar, Unit 2 - Transmits Unit 1/Unit 2 As-Constructed Fire Protection Report (TAC No. ME3091) CNL-14-235, Transmittal of Part V of the Unit 1/Unit 2 Fire Protection Report2015-01-0909 January 2015 Transmittal of Part V of the Unit 1/Unit 2 Fire Protection Report ML14265A4492014-09-18018 September 2014 Watts Bar, Unit 2 - Transmittal of Unit 1/Unit 2 As-Constructed Fire Protection Report ML13081A0022013-03-13013 March 2013 Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 1 of 2 ML13081A0032013-03-13013 March 2013 Revised Watts Bar Nuclear Plant Unit 1/Unit 2 As-Designed Fire Protection Report. Part 2 of 2 ML12181A5312012-06-27027 June 2012 Resolution of Concerns with Fire Protection Report (Fpr) Operator Manual Action (OMA) 732 and Response to Requests for Additional Information ML0411303572004-04-19019 April 2004 Watt Bar Nuclear Plant (Wbn), Unit 1 - Update to the WBN Fire Protection Report 2022-08-01 Category:Letter MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024
[Table view]Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24009A1712024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Letter ML24019A0722024-02-14014 February 2024 Request for Withholding Information from Public Disclosure IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation 2024-09-05 |
Retrieved from "https://kanterella.com/w/index.php?title=ML15280A508&oldid=389345"