(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:License-Operator
MONTHYEARML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML22083A1892022-03-24024 March 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22083A1812022-03-24024 March 2022 Final Qa/Related Forms (Folder 1) ML22083A2032022-03-24024 March 2022 Draft Operating Test (Section C) (Folder 2) ML22059B0452022-01-21021 January 2022 Final Operating Test (Section C Only) ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21293A2432021-09-21021 September 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21293A2712021-09-21021 September 2021 Post Exam Comments Resolution and References (Folder 1) ML21293A2302021-09-21021 September 2021 Draft Written Examination (Folder 2) ML21293A2202021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21293A2272021-09-21021 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21293A2502021-09-21021 September 2021 Handouts to Applicants (Folder 3) ML21293A2472021-09-21021 September 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21263A1442021-09-21021 September 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21263A1472021-09-21021 September 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21293A1412021-09-21021 September 2021 Miscellaneous Exam Material (Folder 1) ML21293A2182021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21293A1142021-09-21021 September 2021 Final QA Related Forms (Folder 1) 2024-10-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML22083A1812022-03-24024 March 2022 Final Qa/Related Forms (Folder 1) ML22083A2032022-03-24024 March 2022 Draft Operating Test (Section C) (Folder 2) ML22083A1892022-03-24024 March 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22059B0452022-01-21021 January 2022 Final Operating Test (Section C Only) ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21293A2272021-09-21021 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21293A2502021-09-21021 September 2021 Handouts to Applicants (Folder 3) ML21293A2472021-09-21021 September 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21293A2302021-09-21021 September 2021 Draft Written Examination (Folder 2) ML21293A2432021-09-21021 September 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21293A2182021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21263A1472021-09-21021 September 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21293A2202021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21263A1442021-09-21021 September 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21293A2712021-09-21021 September 2021 Post Exam Comments Resolution and References (Folder 1) ML21293A1142021-09-21021 September 2021 Final QA Related Forms (Folder 1) ML21293A1412021-09-21021 September 2021 Miscellaneous Exam Material (Folder 1) ML21293A1222021-09-21021 September 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) 2023-02-09
[Table view] |
Text
Millstone Unit 3 - Post Exam Comments Resolution / References (Folder 1)
ADAMS Package Accession No. ML20275A100
Millstone 3 submitted 2 emailed proposals for a change to the answer key of Technical Specifications for Scenario 1, Event 3, Loss of VIAC 3. The two emails dated September 27, 2021, and October 6, 2021, can be found in ADAMS with Accession numbers ML21293A125 and ML21293A 130, respectively.
The NRC agreed with only one out of the two proposals and made changes to the key, then regraded everyone. The two proposals conflicted with eachother in that in the first proposal (ML21293A125 dated September 27, 2021), Millstone asked that TS 3. 0.3 be considered an accurate answer for loss of VIAC 3 because if we had ran the scenario longer and let the crews reach Step 11 of AOP 3564, they may have found themselves in TS 3.0.3. On the other hand in their second proposal (ML21293A130 dated October 6, 2021), Millstone asked that the candidates be evaluated against TS calls related to only Step 7 of AOP 3564. After careful consideration of the technical basis for both proposals we agreed with the removal of 2 TS calls based on the description in TSs for Total and Minimum channels available, as well as based on the drawings Millstone submitted. The TS key for Scenario 1, Event 3, Loss of VIAC 3, was reduced by 2 calls as they proposed on October 6, 2021: