ML22061A155

From kanterella
Revision as of 14:42, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Gns Proposed Agenda for Technical Meeting to Discuss the Application for the Model No. Castor Geo 69 Storage System
ML22061A155
Person / Time
Site: 07201052
Issue date: 02/07/2022
From: Bussmann D
GNS Gesellschaft fur Nuklear-Service mbH
To: Garcia-Santos N
Storage and Transportation Licensing Branch
Garcia-Santos N
Shared Package
ML22061A150 List:
References
001028, EPID L-2021-NEW-0006
Download: ML22061A155 (1)


Text

Agenda Topic: Technical Meeting, 10 CFR 72 Application for CASTOR geo69 Dry Storage System

Date: February, yy and zz, 2022; 08.30 - 12.00 AM EST

Location: MS Teams

Public Meeting (approx. 30 min - 1h)

1. Project Overview Intend and Scope of 10 CFR 72 Application
2. Applicable Regulations and Guidelines
3. Comparison to Application Process in Germany
4. Status of Application

Closed Meeting (approx. 5 h) - Topics 1-3 may be separately discussed for each technical discipline

1. CASTOR geo69 DSS:
i. Definition of configuration for the DSS o Detailed description of the DSS and its components o Detailed description of handling operations foreseen

ii. Detailed description of the evaluation concept within the current application

iii. Discussion regarding possibilities of acceptance of the application

o Evaluations to be performed for normal, off-normal and accident and natural phenomena

2. CASTOR geo69 CLU and Implementation in 10 CFR 72 Application
i. Design and functional overview o Detailed description of Transfer Cask and Transfer Lock o Detailed description of handling operations

ii. Boundary conditions to the reactor facility (incl. handling equipment) resulting from the CLU design (crane design, etc.)

iii. Evaluations for off-normal conditions

3. Further topics of RSI incl. observations previously not discussed (in 1. and 2.),

if necessary.

4. Discussion and agreement on further steps and project schedule.