ML22122A068

From kanterella
Revision as of 02:13, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report
ML22122A068
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/14/2022
From: Hilbert L
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
22-110
Download: ML22122A068 (2)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

April 14, 2022

United States Nuclear Regulatory Commission Serial No.: 22-110 Attention: Document Control Desk NAPS: CNC Washington, D: C. 20555 Docket Nos.: 50-338/339 72-16 72-56 License Nos.: NPF-4/7 SNM-2507

VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION l:NERGY VIRGINIA)

NORTH ANNA POWER STATION UNITNOS.1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION {ISFSI)

ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT

Enclosed is the 2021 Annual Radioactive Effluent Release Report. This report is

If you have any questions or require additional information, please contact Mr. Marcus A. Hofmann at (540) 894-2100. ' '

A~

Lisa Hilbert Site Vice President.

Enclosure

Commitments made in.Jhis

  • letter: None ftii>9 f5z/?

/t)Jf ss z_ l.p

.w1i-1.

jVf!SS Serial No.22-110 NAPS Annual Radioactive Effluent Release Report Page 2 of 2

cc: U.S. Nuclear Regulatory Commission (w/o Enclosure)

Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257

Director, Division of Spent Fuel Management (w/o Enclosure)

Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D. C. 20555

NRC *.Senior Resident Inspector (w/o Enclosure)

North Anna Power Station