ML22139A229

From kanterella
Revision as of 01:12, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search

Transmittal Letter for Point Beach Final SE for SLRA Review Rev1
ML22139A229
Person / Time
Site: Point Beach  
Issue date: 05/25/2022
From: Beverly Smith
NRC/NRR/DNRL
To: Coffey B
Florida Power & Light Co
Vera Amadiz M
Shared Package
ML22139A228 List:
References
EPID L-2020-SLR-0002
Download: ML22139A229 (3)


Text

May 25, 2022

Mr. Bob Coffey Executive Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - FINAL SAFET Y EVALUATION FOR THE SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW, REVISION 1 (EPID NO. L-2020-SLR-0002)

Dear Mr. Coffey:

By letter dated November16,2020 (Agencywide Documents Access and Management System (ADAMS) Package Accession No.ML20329A292), as supplemented by letters dated April21, 2021 (ADAMS Accession No. ML21111A 155), May6, 2021 (ADAMS Acce ssion No.

ML21126A239), May27, 2021 (ADA MS Accession No. ML21147A115), J uly8, 2021 (ADAMS Accession No. ML21189A173), July8, 2021 (ADAMS Accession No. M L21189A174), July26, 2021 (ADAMS Accession No. ML21207A066), August11, 2021 (ADAMS Accession No. ML21223A308), August25, 2021 (ADAMS Accession No. ML21237A 055), August30, 2021 (ADAMS Accession No. ML21242A230), September10, 2021 (ADAMS Ac cession No.

ML21253A138), September10, 2021 (ADAMS Accession No. ML21253A1 40), September 13, 2021 (ADAMS Accession No. ML21256A129), September16, 2021 (ADA MS Accession No. ML21259A153), September20, 2021 (ADAMS Accession No. ML21263A0 52), October1, 2021 (ADAMS Accession No. ML21274A053), October25, 2021 (ADAMS Acce ssion No.

ML21298A090), November3, 2021 (ADAMS Accession No. ML21307A286 ), November4, 2021 (ADAMS Accession No. ML21308A282), November4, 2021 (ADAMS Acc ession No.

ML21308A283), November 23, 2021 (ADAMS Accession No. ML21327A07 7), November 30, 2021 (ADAMS Accession No. ML21334A293), December 9, 2021 (ADAMS Accession No. ML21343A294), January 6, 2022 (ADAMS Accession No. ML22006A 074), and January 6, 2022 (ADAMS Accession No. ML22006A046), NextEra Energy Point Be ach, LLC (NextEra) submitted an application for subsequent renewal of Renewed Faci lity Operating License Nos. DPR-24 and DPR-27 for Point Beach Nuclear Plant, Units 1 a nd 2 (Point Beach),

respectively, to the U.S. Nuclear Regulatory Commission (NRC). NextEra submitted the application pursuant to Title 10 of the Code of Federal Regulations Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, for su bsequent license renewal.

The NRC staff determined that the application was complete and acceptable for docketing as communicated by email dated January 8, 2021 (ADAMS Accession No. ML21012A365) and by letter dated January 15, 2021 (ADAMS Accession No. ML21006A417), and noticed in the Federal Register on January 22, 2021 (86 FR 6684).

The NRC staff has reviewed the Point Beach Subsequent License R enewal Application (SLRA) and has developed the enclosed Safety Evaluation Related to th e Subsequent License B. Coffey Renewal of Point Beach Nuclear Plant, Units 1 and 2, Revision 1 hereinafter referred to as the Safety Evaluation (SE). The SE reflects the status of the NRC staffs safety review of the SLRA, as supplemented, through January 6, 2022. Revision 1 of the SE corrects errors that were inadvertently introduced into the SE during its final processin g.

If you have any questions regarding this matter, please contact the subsequent license renewal project manager, Mr. Bill Rogers, by e-mail at bill.rogers@nrc.gov or Ms. Marieliz Johnson, by e-mail at marieliz.johnson@nrc.gov.

Sincerely,

/RA/

BrianW.Smith,Director DivisionofNew and Renewed Licenses OfficeofNuclearReactorR egulation

Docket Nos. 50-266 and 50-301

Enclosure:

SE

cc w/encl: Listserv

B. Coffey

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - FINAL SAFE TY EVALUATION FOR THE SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW, REVISION 1 (EPID NO. L-2020-SLR-0002) MAY 25, 2022

DISTRIBUTION:

E-MAIL:

PUBLIC RidsNrrDnrl Resource

RidsNrrPMPointBeach Resource LGibson, NRR/DNRL SBurnell, HQ/OPA RidsACRS_MailCTR Resource PClark, NMSS/REFS DMcIntyre, HQ/OPA RidsRgn3MailCenter Resource RElliott, NMSS/REFS CWolf, OCA RidsRgn3Dnms Resource BSmith, NRR/DNRL LWilkins, OCA RidsRgn3Drp Resource BThomson, NRR/DNRL VMitlying, RGN III/OPA RidsRgn3Drs Resource RHaskell, NRR/DORL PChandrathil, RGN III/OPA RidsRgn3Ora Resource NSalgado, NRR/DORL NFeliz-Adorno, RGN III RidsRgn3Opa Resource DRoth, OGC RNg, RGN III RidsNrrOd Resource JWachutka, OGC William.Maher@fpl.com RidsNrrPMPointBeach Resource TJones, OGC Steve.Franzone@fpl.com BRogers, NRR/DNRL RSkokowski, OEDO MJohnson, NRR/DNRL MMcCoppin, OEDO

ADAMS Accession Nos.:

PKG: ML22139A228 LTR: ML22139A229 SE: ML22140A252 *via-e-mail. **Concurrence on SE issued 2/23/20 22 NRR-106 OFFICE DEX/ELTB:BC* DEX/ESEB:BC* DSS/SPCB:BC* DRA/APLB:BC*

NAME JJohnston** JColaccino** BWittick** JWhitman**

DATE 06/02/2021 11/23/2021 06/05/2021 10/08/2021 OFFICE DNRL/NVIB:BC* DNRL/NPHP:BC* DNRL/NCSG:BC* DNRL/NLRP:PM*

NAME DWidrevitz** MMitchell** SBloom** BRogers**

DATE 09/03/2021 11/15/2021 01/26/2022 02/18/2022 OFFICE DNLR/NLRP: BC* OGC (NLO)* DNRL: D DNLR/NLRP:PM NAME LGibson** JWachutka** BSmith: BThomson for** MJohnson (ltr)

DATE 02/23/2022 02/23/2022 02/23/2022 05/19/2022 OFFICE DNLR/NLRP:LA OGC (NLO) DNLR/NLRP:BC DNRL:D NAME YEdmonds (ltr) JWachutka LGibson BSmith DATE 05/24/2022 05/25/2022 05/25/2022 05/25/2022