|
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21) Deficiency Report (per 10CFR50.55e and Part 21)
[Table view] Category:Letter
MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24088A2062024-03-26026 March 2024 Annual Operating Report ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. 2024-09-26
[Table view] |
Text
V.C. Summ e r N ucl ea r Sta tio n P Dominion Bra dh am Blvd & Hwy 2 15, J enk insvi lle, SC 29065 M ai ling Address : r:J Energy P.O. Box 88, J e n kin sville, SC 29065 Dom in ion Energy.co m May 26, 2022
Document Control Desk Serial No.: 22-096A U.S. Nuclear Regulatory Commission VCS-LIC/JB R1 Washington, DC 20555 Docket No. 50-395 License No. NPF-12
DOMINION ENERGY SOUTH CAROLINA (DESC)
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 UPDATED10CFR21REPORT FEEDWATER ISOLATION VALVE POPPET SEAL FAILURE
Dominion Energy South Carolina hereby submits the enclosed updated written notification of the identification of a defect, in accordance with the requirements of 10 CFR 21.21 (d)(3)(ii). This notification pertains to the failure of a poppet seal used in a safety-related application on the control block of feedwater isolation valves (FWIV) at VCSNS.
- Should you have any questions, please call Mr. Michael Moore at (803) 345-4752.
Sincerely,
~ George Lippard
Site Vice President V.C. Summer Nuclear Station
Enclosure
Commitments contained in this letter: None
cc:
G. J. Lindamood - Santee Cooper L. Dudes - NRC Region II G. Miller - NRC Project Mgr.
NRC Resident Inspector J. N. Bassett-INPO Marsh USA, Inc.
Serial No. 22-096A Enclosure
Updated 10 CFR 21 Report
Feedwater Isolation Valve (FWIV) Poppet Seal Failure Serial No. 22-096A Enclosure
10 CFR 21 REPORT
FWIV POPPET SEAL FAILURE
- 1. Name and address of the individual or individuals informing the Commission.
George A. Lippard Site Vice President V.C. Summer Nuclear Station Mail Code 800 PO Box 88 Jenkinsville, SC 29065
- 2. Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which contains a defect or noncompliance.
V.C. Summer Nuclear Station Docket No. 50-395 License No. NPF-12 Basic Component: Feedwater Isolation Valve Control Block Poppet Seals
- 3. Identification of the firm constructing the facility or supplying the basic component which contains a defect or noncompliance.
Dominion Energy South Carolina V.C. Summer Nuclear Station PO Box 88 Jenkinsville, SC 29065
- 4. Nature of the defect or noncompliance and the safety hazard which is created or could be created by such defect or noncompliance.
It was determined that the poppet seal failure was the result of laminations in the Viton material from which the seals are machined. The poppet seals are purchased Commercial Grade and dedicated for use in a Safety-Related application on the FWIVs.
- 5. The date on which the information of such defect or noncompliance was obtained.
June 22, 2021
Page 1 of 3 Serial No. 22-096A Enclosure
- 6. In the case of a basic component which contains a defect or noncompliance, the number and location of all such components in use at, supplied for, or being supplied for or may be supplied for one or more facilities or activities subject to the regulations in this part.
VC Summer SKU 30-8091-0920-13, Feedwater Isolation Valve Poppet Seal, is unique to VC Summer. The poppet seals were designed and manufactured specifically for application in the VC Summer Feedwater Isolation Valves. VC Summer also uses these seals in its Main Steam Isolation Valves.
The laminations were identified via microscope inspection in a single batch of poppet seals during a post failure investigation. These seals were manufactured in May 2017 by Infinity Seal of Columbia, South Carolina. Infinity Seal is a commercial grade supplier. VC Summer performs Commercial Grade Dedication of the seals onsite.
VC Summer received two shipments, under two different Purchase Orders, that contained poppet seals. In May 2017 VC Summer received 60 seals (VC Summer Lot Number 7064051 ). In May 2021 VC Summer received 5 additional seals (VC Summer Lot Number 7081558) from the impacted batch manufactured in May 2017.
At this time there are no other seals from Lots 7064051 and 7081558 in inventory at VC Summer, and none have been delivered to any other facility. VC Summer has identified seals from Lot 7064051 in its Main Steam Isolation Valves (MSIV) 'B' and 'C'; however, they do not serve any function that would be reportable under 1 0CFR21.
VC Summer performs the Commercial Grade Dedication of these poppet seals. VC Summer does not perform Commercial Grade Dedication of these poppet seals for any other facility.
- 7. The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
All poppet seals from Lots 7064051 and 7081558 have been removed from the Feedwater Isolation Valves and from warehouse inventory. All other Lots onsite have undergone additional testing to ensure that laminations are not present in the qualified seals currently in inventory.
Additionally, Plant Support Engineering is working with the Supply Chain Management to identify the appropriate additional testing and/or inspection to ensure future procurements of Feedwater Isolation Valve poppet seals are free of laminations.
Page 2 of 3 Serial No. 22-096A Enclosure
- 8. Any advice related to the defect or noncompliance about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
None. The affected seals were purchased commercial grade and dedicated onsite to be used in safety-related application in the FWIV control block application at VCSNS.
- 9. In the case of an early site permit, the entities to whom the early site permit was transferred.
Not applicable, does not involve an early site permit.
Page 3 of 3