ML22285A100
ML22285A100 | |
Person / Time | |
---|---|
Site: | 07000925 |
Issue date: | 09/14/2022 |
From: | Burns & McDonnell, Environmental Properties Management |
To: | Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML22286A041 | List: |
References | |
Download: ML22285A100 (22) | |
Text
FIGURE 6-1 CURRENT LICENSED AREA FACILITY DECOMMISSIONING PLAN REVISION 3
VV MCDONNELL environmental^BURNS
properties management. I.LC
LEGEND CERT PROPERTY LINE - MARCH 2018 CURRENTLY LICENSED AREA SUBAREAS 100 ug/L URANIUM CONCENTRATION 201 pg/L URANIUM CONCENTRATION
NOTES
- 1) Basemap: Google Earth 2017
SCALE IN FEET
Rev No: 0 Preparer: TJKIMMEL Date: 9/14/2022 Reviewer: EDULLE Date: 9/14/2022 Coordinate System
Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 6-1_Currently Licensed Area E(DC£
£O
£
9oCMO9
OO
Qo3mClTO *LEGEND NOTES MONITOR WELL IN ALLUVIUM 1) Isopleths are drawn based on representative uranium
+++ MONITOR WELL IN SANDSTONE B concentrations, expressed in micrograms per liter (pg/L). With a 1^ ro ro ^ MONITOR WELL IN SANDSTONE C conservatively estimated value of 1.3% for U -235 enrichment, the MONITOR WELL IN TRANSITION ZONE 201 pg/L isopleth, as shown, represents the 180 pCi/L (picocuries
£< © EXTRACTION WELL/SUMP per liter) isopleth. FIGURE 6-2 9oSo8l © INJECTION WELL BURIAL AREA #1 LICENSED AREA GROUNDWATER EXTRACTION PIPING 2) Subarea designations (C, F) labeled in yellow FACILITY DECOMMISSIONING PLAN co cn TREATED WATER INJECTION PIPING 3) Basemap: Google Earth 2017 REVISION 3
Q LU w LU GROUNDWATER EXTRACTION TRENCH
<t5 OISOJ 2TREATED WATER INJECTION TRENCH 201 ug/L URANIUM ISOPLETH BURNS REMEDIATION FACILITY XVMSDONNELL environmentalproperties management, LLC
°lZ©o SUBAREAS m £9 5co 031% AREA SUBJECT TO LICENSE CONTROLS Rev No: 0 RADIOLOGICALLY RESTRICTED AREA N Preparer: TJKIMMEL Date: 9/14/2022 100 200 Reviewer: EDULLE Date: 9/14/2022
-§ =5 l CO
O CM Coordinate System
- ci o SCALE IN FEET NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet N CM FIGURE 6-3 WESTERN AREA LICENSED AREA FACILITY DECOMMISSIONING PLAN REVISION 3
outfa ll Tooi
BURNS XVMSDONNELL environmental properties management,
LEGEND MONITOR WELL IN ALLUVIUM
> EXTRACTION TEST WELL
© EXTRACTION WELL/SUMP
© INJECTION WELL OUTFALL
GROUNDWATER EXTRACTION PIPING
TREATED WATER INJECTION PIPING GROUNDWATER EXTRACTION TRENCH
TREATED WATER INJECTION TRENCH
WESTERN AREA TREATMENT FACILITY
____ EXTRACTION, INJECTION, AND UTILITY CORRIDOR
WA DISCHARGE PIPING 100 pg/L URANIUM CONCENTRATION WU-BA3 REMEDIATION AREA WAA U>DCGL REMEDIATION AREA 1206-NORTH REMEDIATION AREA SUBAREAS r - AREA SUBJECT TO LICENSE
- - J CONTROLS RADIOLOGICALLY RESTRICTED AREA
- 1
NOTES
- 1) 180 picoCuries per liter (pCi/L) in the WAA U >
DCGL, 1206-NORTH, and BA3 areas was calculated at 123 micrograms per liter (pg/L). The 100 pg/L isopleth is shown for conservatism.
- 2) Subarea designations labeled in yellow
- 3) BASEMAP: GOOGLE EARTH 2017
N
Rev No: 0 Preparer: TJKIMMEL Date: 9/19/2022 Reviewer: EDULLE Date: 9/19/2022 Coordinate System NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 6-3_WA Licensed Area
- w-Mm
&£.
- TMW-24
02W45 V02W43
02W62 02W35 G E-BA 1-04
-f -r 02W37 02W44 1410 02W34 02W3802W36 02W18y
02W21 02W24 02W14 02W11 X + wX^ 02Vyi2
02W23 ^02W17 02W06 02W08
+-02W07 02W32
02W16 02W05 GE-BA1-C
H.2W28
GWI-BA1-02
LEGEND NOTES MONITOR WELL IN ALLUVIUM 1) Injection trench GWI-BA1-01 and extraction trench GETR-BA1-01
-f-+MONITOR WELL IN SANDSTONE B were installed in 2017.
ro ro ^MONITOR WELL IN SANDSTONE C 2) Injection well GWI-BA1-01A and extraction wells GETR-BA1-01A
Q.Z MONITOR WELL IN TRANSITION ZONE
(/) <Sl and GETR-BA1-01B were installed in 2017. FIGURE 8-2 0 EXTRACTION WELL/SUMP BURIAL AREA #1 GROUNDWATER SoSo 0 INJECTION WELL(INSTALLED) 3) Isopleths are drawn based on representative uranium REMEDIATION AREAS o INJECTION WELL concentrations, expressed in micrograms per liter (pg/L). With a FACILITY DECOMMISSIONING PLAN ro ^
ro a: Q lu GROUNDWATER EXTRACTION PIPING conservatively estimated value of 1.3% for U -235 enrichment, the REVISION 3
w lu TREATED WATER INJECTION PIPING 201 pg/L isopleth, as shown, represents the 180 pCi/L (picocuries
</) CD GROUNDWATER EXTRACTION TRENCH per liter) isopleth. ^BURNS IS TREATED WATER INJECTION TRENCH ^MSDONNELL. environmental 201 ug/L URANIUM ISOPLETH 4) Basemap: Google Earth 2017 properties management, LLC
REMEDIATION FACILITY BA1-A REMEDIATION AREA Rev No: 0
BA1-B REMEDIATION AREA Preparer: BELOCKWOOD Date: 10/03/2022 SUBAREAS 200 Reviewer: EDULLE Date: 10/03/2022
- PROPOSED LICENSED AREA
O CM RADIOLOGICALLY CONTROLLED AREA Coordinate System c o SCALE IN FEET NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet N CM WESTERN AREA BURIAL AREA 1 NOTES:
- 1. EXTRACTION AND INJECTION FLOW RATES ARE NOMINAL DESIGN RATES FOR EACH COMPONENT.
EXTRACTION AND INJECTION RATES WILL VARY THROUGHOUT OPERATION. THE FLOW RATES PRESENTED ON THIS SCHEMATIC REFLECT INITIAL OPERATING CONDITIONS.
- 2. THIS SCHEMATIC IS CONCEPTUAL IN NATURE AND IS NOT INTENDED TO CONVEY ALL PIPING OR PROCESS COMPONENTS THAT WILL BE REQUIRED FOR PROPER SYSTEM DESIGN, CONSTRUCTION, OR OPERATION.
- 3. THE COMBINED TREATMENT SYSTEM INFLUENT CONCENTRATIONS PRESENTED ON THIS SCHEMATIC REFLECT INITIAL OPERATING CONDITIONS.
CONCENTRATIONS WILL VARY OVER THE COURSE OF OPERATIONS.
LEGEND:
U-URANIUM N - NITRATE F-FLUORIDE Tc-99-TECHNETIUM-99 GPM - GALLONS PER MINUTE mg/L - MILLIGRAMS PER LITER ug/L - MICROGRAMS PER LITER ng/L - NANOGRAMS PER LITER Ci - INITIAL CONCENTRATION Cmax-MAXIMUM CONCENTRATION IX - ION EXCHANGE
FIGURE 8-3 WELL FIELD & WATER TREATMENT
^BURNS LINE DIAGRAM
^MSDONNELL FACILITY DECOMMISSIONING PLAN REVISION 3
Preparer: E. Pulcher Date: 9/15/22
Rev. No. 0 Reviewer: E. Dulle Date: 9/15/22
Z:\\CLIENTS\\ENS\\CERT\\142089_CERT-DECOM2022\\DESIGN\\CADD\\DWGS\\FIGURE 8-3_WELL FIELD & WATER TREATMENT LINE DIAGRAM.DWG 9/15/2022 3:06 PM EAPULCHER FIGURE 8-1 WESTERN AREA GROUNDWATER REMEDIATION AREAS FACILITY DECOMMISSIONING PLAN OUTFAlI 15001 REVISION 3
>BURNS CvMCDONNELL environmentalproperties management, I.LC
LEGEND MONITOR WELL IN ALLUVIUM MONITOR WELL IN SANDSTONE A MONITOR WELL IN SANDSTONE B MONITOR WELL IN SANDSTONE C MONITOR WELL IN TRANSITION ZONE PROPOSED MONITOR WELL EXTRACTION TEST WELL EXTRACTION WELL/SUMP INJECTION WELL OUTFALL GROUNDWATER EXTRACTION PIPING TREATED WATER INJECTION PIPING GROUNDWATER EXTRACTION TRENCH TREATED WATER INJECTION TRENCH WESTERN AREA TREATMENT FACILITY EXTRACTION, INJECTION, AND UTILITY CORRIDOR WA DISCHARGE PIPING 100 pg/L URANIUM CONCENTRATION WU-BA3 REMEDIATION AREA WAA U>DCGL REMEDIATION AREA 1206-NORTH REMEDIATION AREA SUBAREAS 1206 DRAINAGE PERFORATED PIPE GETR-WU-01 EXCAVATION AREA
NOTES
- 1) 180 picoCuries per liter (pCi/L) in the WAA U >
DCGL, 1206-NORTH, and BA3 areas was calculated at 119 micrograms per liter (pg/L). The 100 pg/L isopleth is shown for conservatism.
- 2) BASEMAP: GOOGLE EARTH 2017
/Plfer fr Rev No: 0
Preparer: TJKIMMEL Date: 9/9/2022 Reviewer: EDULLE Date: 9/9/2022 Coordinate System NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-1 _Western Area GW Remediation Areas FIGURE 8-4 BURIALAREA#1 PARTICLE TRACKING 2022 STAGNATION ZONE ANALYSIS FACILITY DECOMMISSIONING PLAN REVISION 3
V^MSDONNELL. environmental^BURNS
properties management, LLC
Nominal Pumping Scenario Operating Scenario 1 Operating Scenario 2 LEGEND MONITOR WELL IN ALLUVIUM MONITOR WELL IN SANDSTONE C MONITOR WELL IN TRANSITION ZONE
> EXTRACTION WELL W ZONE ANALYSIS* PARTICLE ADDED FOR STAGNATION
STAGNATION ZONE PARTICLE TRAVEL PATH
NOTES
- 1) GPM - GALLONS PER MINUTE.
- 2) BASEMAP: GOOGLE EARTH 2017
Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-4_BA1 GW Remed. Forward Particle Tracking - Stag
0 90 180
SCALE IN FEET
Rev No: 0 Preparer: BELOCKWOOD Date: 9/23/2022 Reviewer: MCRAWFORD Date: 9/23/2022 Coordinate System NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet Nominal Pumping Scenario Operating Scenario 1 Operating Scenario 2 FIGURE 8-5 WESTERN AREA PARTICLE TRACKING 2022 STAGNATION ZONE ANALYSIS FACILITY DECOMMISSIONING PLAN REVISION 3
XVMSDONNELL. environmental^BURNS
properties manarjement, LLC
LEGEND MONITOR WELL IN ALLUVIUM MONITOR WELL IN TRANSITION ZONE V Est. \\ Travel Time: '<60 Days VVAA- © EXTRACTION WELL W ANALYSIS* PARTICLE ADDED FOR STAGNATION ZONE
GROUNDWATER EXTRACTION TRENCH Est." Travel Time: <120 Days STAGNATION ZONE PARTICLE TRAVEL PATH
?1P 9HJ1 WAA-05
EstyTravel _ Time: < 120 Days
Est.-Travel Time: <120 Days
'GEJWAA-I
EsDTravel Time: <180 Days
Est.'Travel Time: <180 Days NOTES
- 1) THE DISTANCE BETWEEN ARROW HEADS REPRESENTS THE DISTANCE THE PARTICLE TRAVELS IN 60 DAYS.
lO.GPM
- 2) GPM - GALLONS PER MINUTE.
- 3) BASEMAP: GOOGLE EARTH 2017
0 125 250
SCALE IN FEET
GEJTR-WU-02A Rev No: 0 8 GPM GETR-WU-02A 8 GPMPreparer: BELOCKWOOD Date: 9/20/22
wm Reviewer: MCRAWFORD Date: 9/20/22 Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\GeospatialWlaps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-5_WA GW Remed. Forward Particle Tracking - Stag Coordinate System NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet
FIGURE 8-7 WESTERN AREA IN-PROCESS GROUNDWATER MONITORING LOCATIONS FACILITY DECOMMISSIONING PLAN REVISION 3 VVMSDONNELL environmental^ BURNS
properties management, LLC
LEGEND MONITOR WELL IN ALLUVIUM
+ MONITOR WELL IN SANDSTONE A
+ MONITOR WELL IN SANDSTONE B if + MONITOR WELL IN SANDSTONE C MONITOR WELL IN TRANSITION ZONE 0 EXTRACTION TEST WELL 0 EXTRACTION WELL/SUMP INJECTION WELL
GROUNDWATER EXTRACTION PIPING
TREATED WATER INJECTION PIPING
GROUNDWATER EXTRACTION TRENCH
TREATED WATER INJECTION TRENCH
WESTERN AREA TREATMENT FACILITY
TR-04
NOTES
- 1) WHITE BACKGROUND ON MONITOR WELL INDICATES IN-PROCESS MONITORING LOCATION.
aiH 2) BASEMAP: GOOGLE EARTH 2017
400 800
SCALE IN FEET
Rev No: 0 Preparer: TJKIMMEL Date: 9/6/2022 Reviewer: EDULLE Date: 9/6/2022 Coordinate System
___ NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-7_WA In-process GW Mon Locations
ph
m °2^45
- y" /**>>
- Q.Z NOTES CO < LEGEND FIGURE 8-8 O Q.
MONITOR WELL IN ALLUVIUM 1) WHITE BACKGROUND ON MONITOR WELL INDICATES IN-BURIAL AREA #1 IN-PROCESS GROUNDWATER s o MONITOR WELL IN SANDSTONE B PROCESS MONITORING LOCATION. MONITORING LOCATIONS MONITOR WELL IN SANDSTONE C 2) BASEMAP: GOOGLE EARTH 2017 FACILITY DECOMMISSIONING PLAN MONITOR WELL IN TRANSITION ZONE REVISION 3
03 O
£ LUo z ©EXTRACTION WELL/SUMP ^BURNS
© INJECTION WELL VWMSDONNELL environmental properties management, LLC
°,2P ° GROUNDWATER EXTRACTION PIPING TREATED WATER INJECTION PIPING Rev No: 0 LU 9 Lx 03 03 GROUNDWATER EXTRACTION TRENCH Preparer: TJKIMMEL Date: 9/9/2022 5$ TREATED WATER INJECTION TRENCH 100 200 Reviewer: EDULLE Date: 9/9/2022 I*l CD
o CM Coordinate System C o SCALE IN FEET NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet N CM FIGURE 8-9 WESTERN AREA POST-REMEDIATION GROUNDWATER MONITORING LOCATIONS FACILITY DECOMMISSIONING PLAN REVISION 3 BURNS VS.MSDONNELL. environmental properties management, LLC
LEGEND MONITOR WELL IN ALLUVIUM
' ' fU
+ MONITOR WELL IN SANDSTONE A
+ MONITOR WELL IN SANDSTONE B
+ MONITOR WELL IN SANDSTONE C MONITOR WELL IN TRANSITION ZONE feyglli 0 EXTRACTION TEST WELL
© EXTRACTION WELL/SUMP
© INJECTION WELL
GROUNDWATER EXTRACTION PIPING
. >._* * -------- TREATED WATER INJECTION PIPING
GROUNDWATER EXTRACTION TRENCH
TREATED WATER INJECTION TRENCH
WESTERN AREA TREATMENT FACILITY
P-UP2-TR-04
NOTES
- 1) WHITE BACKGROUND ON MONITOR WELL INDICATES POST-REMEDIATION MONITORING LOCATION.
- 2) BASEMAP: GOOGLE EARTH 2017
N
Rev No: 0 Preparer: TJKIMMEL Date: 9/6/2022 Reviewer: EDULLE Date: 9/6/2022 Coordinate System NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet Z:\\Clients\\ENS\\CERT\\_Clientlnfo\\Sites\\Database\\Geospatial\\Maps & Dwgs\\ArcGIS\\BMCD_Files\\Arcdocs\\2020\\2022 - Decommissioning Plan\\Figure 8-9_WA Post-Remediation GW Mon Locations LEGEND NOTES FIGURE 8-10 MONITOR WELL IN ALLUVIUM 1) WHITE BACKGROUND ON MONITOR WELL BURIAL AREA #1 POST-REMEDIATION
+ MONITOR WELL IN SANDSTONE B INDICATES POST-REMEDIATION MONITORING LOCATION. GROUNDWATER MONITORING
+ MONITOR WELL IN SANDSTONE C 2) BASEMAP: GOOGLE EARTH 2017 LOCATIONS MONITOR WELL IN TRANSITION ZONE FACILITY DECOMMISSIONING PLAN REVISION 3
© EXTRACTION WELL/SUMP ^BURNS 0 INJECTION WELL ^MSDONNELL. environmental
properties management. ILC
GROUNDWATER EXTRACTION PIPING
TREATED WATER INJECTION PIPING Rev No: 0
GROUNDWATER EXTRACTION TRENCH N Preparer: TJKIMMEL Date: 9/9/2022
TREATED WATER INJECTION TRENCH Reviewer: EDULLE Date: 9/9/2022
BA #1 REMEDIATION FACILITY Coordinate System
NAD 1983 StatePlane Oklahoma North FIPS 3501 Feet Figure 9-1 Revision 0 Preparer: E. Dulle; Date: 08/31/22 Pre-Construction Schedule Reviewer: J. Hesemann; Date: 08/31/22
ID 7Task Name Duration Start Finish Qtr 3, 2022 Qtr 4, 2022 Qtr 1, 2023 Qtr 2 2023 Qtr 4, 2023 Qtr 1, 2024 Qtr 2. 2024 Qtr 3, 2024 Qtr 4, 2024 Qtr 1,2025 C Jul I Aug l SepOct I Nov [ Dec Jan l Feb I MarApr l May l Jun Qtr 3, 2023 Jul I Aug I SepOct I Nov I DecJan I Feb l MarJun Jul I Auq I Sep Oct I Nov l Dec Jan I Feb I Mar 1 Decom. Plan-Rev3 386 days Fri 9/30/22 Fri 3/22/24 P
2 EPM submits formal D-Plan 0 days Fri 9/30/22 Fri 9/30/22 9/30
3 NRC Accepts D-Plan for Technical 65 days Fri 9/30/22 Thu 12/29/22 Review
4 NRC Reviews D-Plan 86 days Fri 12/30/22 Fri 4/28/23
5 NRCs Issues RAIs 0 days Fri 4/28/23 Fri 4/28/23 4/28
6 EPM Prepares & Issues RAI 45 days Mon 5/1/23 Fri 6/30/23 Responses
7 NRC Drafts SER, EA, License 190 days Mon 7/3/23 Fri 3/22/24 Amendment
8 License Amendment 153 days Mon 3/25/24 Wed 10/23/24
9 NRC and EPM Reach Concurrence on 43 days Mon 3/25/24 Wed 5/22/24 Draft License Amendment
10 License Amendment Issued 110 days Thu 5/23/24 Wed 10/23/24
11 Design, Bidding, and Contracting 458 days Mon 5/1/23 Wed 1/29/25
12 Prepare remediation infrastructure 170 days Mon 5/1/23 Fri 12/22/23 and facilities bid packages
13 Bidders to prepare and submit bids 70 days Mon 12/25/23 Fri 3/29/24
14 Request and Obtain Construction 148 days Mon 4/1/24 Wed 10/23/24 Funding Approval
15 Execute Contracts 70 days Thu 10/24/24 Wed 1/29/25
16 Pre-Mobilization 14 days Thu 1/30/25 Tue 2/18/25 in
Page 1 of 1 Figure 9-2 Revision 0 Preparer: E. Dulle; Date: 08/31/22 Construction Schedule Reviewer: J. Hesemann; Date: 08/31/22
ID Task Name Duration Start 2026 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter Feb Mar Apr May Jun Jul Auq SepOct Nov DecJan Feb 1 Remediation Well Field Infrastructure 132 days Tue 2/18/25 2 Mobilization and Site Preparation 35 days Tue 2/18/25 3 Equipment Mobilization 15 days Tue 2/18/25 h 4 BMPs, Road Installation, and Site Work 20 days Tue 3/11/25 5 Extraction and Injection Infrastructure 117 days Tue 3/11/25 6 Extraction Well Installation 15 days Tue 3/11/25 7 Extraction Trench Installation 43 days Tue 4/8/25 8 Injection Trench Installation 60 days Tue 4/8/25 9 Utilities and Outfall Installation 37 days Tue 7/1/25 10 1206 Drainage 15 days Fri 6/6/25 11 Facilities Infrastructure 132 days Tue 4/8/25 12 WATF Facility Infrastructure 132 days Tue 4/8/25 13 WATF Grading and Foundations 45 days Tue 4/8/25 14 Building Construction and Fit-out 87 days Tue 6/10/25 V
15 BA1 Facility Infrastructure 25 days Tue 6/10/25 16 BA1 Grading and Foundations 10 days Tue 6/10/25 17 Construction and Fit-out 15 days Tue 6/24/25 18 Startup and Commissioning 60 days Thu 10/9/25 19 Startup and Commissioning 30 days Thu 10/9/25 11/19
20 Weather Delays 30 days Thu 11/20/25
Page 1 of 1 Figure 9 Revision 0 Preparer: E. Dulle; Date: 09/16/22 Reviewer: J. Hesemann; Date: 09/23/22 Remediation Schedule
CO 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 a> -c Remediation Area E go rH IS *3 rH IS ro rH IS co rf rH (N ro rH (N no rt rH IS co rt rH IS co rH IS co rH IS co rH IS co rt rH IS co rH IS co rt rH IS cr cr cr cr cr or cr a cr cr cr a a a a a cr a a a a a a a a a a a cr a a a or a a a a a a a cr a a a a a a cr a a
BA1-A 150 Time to Reduce Uranium to < NRC Criterion BA1-B 62 Time to Reduce Uranium to < NRC Criterion Water Treatment 126 Time Uranium Treatment System Operates Water Pumping & Injection 150 Time Pumping & Injection Continues
WAA U>DCGL 135 Time to Reduce Uranium to < NRC Criterion 1206 North Time to Reduce Uranium to < NRC Criterion WU-BA3 48 Time to Reduce Uranium to < NRC Criterion Water Pumping & Treatment 135 Time Pumping & Uranium Treatment System Operates WU-BA3 Injection 48 Treated Water Injection
Notes:
1Either treatment system may be bypassed if the concentration of uranium in the influent is less than 30 [xg/L
Facility Decommissioning Plan - Rev 3 Page 1 of 1
Trust Administrator
Trustee Project Manager
Radiation Construction Decommissioning License Quality Safety (EPC Lead) Operations Termination Assurance (RSO) (QAC)
Radiation Quality Safety See Figure 10-2 See Figure 10-3 See Figure 10-4 Assurance Personnel Personnel
Indirect Reporting Relationship RSO = Radiation Safety OfficerEPC Lead = Engineering, Procurement, and Construction Lead QAC = Quality Assurance Coordinator
Direct Reporting Relationship
Activities occur sequentially FIGURE 10-1 DECOMMISSIONING ORGANIZATION OVERVIEW FACILITY DECOMMISSIONING PLAN REVISION 3
Preparer: A. Anstaett Date: 9/09/22
Rev. No. 0 Reviewer: E. Pulcher Date: 9/09/22
Z:\\CLIENTS\\ENS\\CERT\\129852_CERT-DECOM2021\\STUDIES\\REMEDIATION\\DP REV 3\\FIGURES\\NATIVE FILES\\FIGURE 10-1.DWG 9/9/2022 10:39 AM ALANSTAETT Trust Administrator
Trustee Project Manager
Radiation EPC General Quality Safety Contractor Assurance (RSO) (EPC Lead) (QAC)
Radiation Quality Safety Assurance Personnel Personnel
Extraction/Injection Site Development; Well Field Electrical WATF Building Equipment Extraction/Injection Trench Well Field Utility & & Communications Erection & MEP Procurement &
Well Installation Installation Foundation Equipment Fitout Installation (1)
Installations Installation
Indirect Reporting RelationshipRSO = Radiation Safety Officer EPC = Engineer-Procure-Construct QAC = Quality Assurance Coordinator Direct Reporting Relationship MEP = Mechanical-Electrical-Piping
Notes:
(1)Includes water treatment and resin processing systems, tanks, pre-engineered building well field pumps and FIGURE 10-2 Denotes Activity instrumentation, injection skids, electrical distribution, DECOMMISSIONING CONSTRUCTION equipment, etc. ORGANIZATION FACILITY DECOMMISSIONING PLAN REVISION 3
Denotes Position Preparer: A. Anstaett Date: 9/09/22
Rev. No. 0 Reviewer: E. Pulcher Date: 9/09/22
Z:\\CLIENTS\\ENS\\CERT\\129852_CERT-DECOM2021\\STUDIES\\REMEDIATION\\DP REV 3\\FIGURES\\NATIVE FILES\\FIGURE 10-2.DWG 9/9/2022 8:46 AM ALANSTAETT Trust Administrator
Trustee Project Manager
Radiation Groundwater Water Treatment Waste Disposal & Quality Safety Extraction/ (FLS) Processing Assurance (RSO) Injection/Discharge (FLS) (QAC)
(FLS)
Radiation Groundwater Water Logistics/Waste Quality Safety Monitoring Treatment Management Assurance
Indirect Reporting Relationship RSO = Radiation Safety Officer FLS = Front Line Supervisor QAC = Quality Assurance Coordinator
Direct Reporting Relationship Note:
Personnel may fill multiple positions, being responsible to manage some tasks, while functioning as operations personnel for other tasks.
Denotes Activity
FIGURE 10-3 DECOMMISSIONING OPERATIONS ORGANIZATION FACILITY DECOMMISSIONING PLAN Denotes Position REVISION 3
Preparer: A. Anstaett Date: 9/09/22
Reviewer: E. Pulcher Date: 9/09/22
Z:\\CLIENTS\\ENS\\CERT\\129852_CERT-DECOM2021\\STUDIES\\REMEDIATION\\DP REV 3\\FIGURES\\NATIVE FILES\\FIGURE 10-3.DWG 9/9/2022 8:55 AM ALANSTAETT Rev. No. 0 Trust Administrator
Trustee Project Dose Model &
Manager License Determination
Radiation Front Line Demobilization Quality Safety Supervisor Contractor Assurance (RSO) (QAC)
Decontamination Post-Remediation Waste Treatment
& Release Monitoring System & Waste Surveys for Processing System Demobilization Demobilization
Final Status Survey Extraction/Injection (Plan, Survey, & Treatment Report) System Shutdown RSO = Radiation Safety Officer QAC = Quality Assurance Coordinator
Indirect Reporting Relationship FIGURE 10-4 Denotes Position LICENSE TERMINATION ORGANIZATION Direct Reporting Relationship FACILITY DECOMMISSIONING PLAN REVISION 3
Activities Occur Sequentially Denotes Activity Preparer: A. Anstaett Date: 9/09/22
Reviewer: E. Pulcher Date: 9/09/22
Z:\\CLIENTS\\ENS\\CERT\\129852_CERT-DECOM2021\\STUDIES\\REMEDIATION\\DP REV 3\\FIGURES\\NATIVE FILES\\FIGURE 10-4.DWG 9/9/2022 9:00 AM ALANSTAETT Rev. No. 0