SECTION 10.0 -AUXILIARY SYSTEMS
TABLE OF CONTENTS
SECTION TITLE
10.1
SUMMARY
DESCRIPTION
10.2 NEW FUEL STORAGE 10.2.1 Introduction 10.2.2 Description
10.3 SPENT FUEL STORAGE 10.3.1 Power Generation Objective 10.3.2 Power Generation Design Basis 10.3.3 Safety Design Basis 10.3.4 Description 10.3.4.1 High Density Spent Fuel Storage Racks 10.3.4.1.1 Cell Assembly 10.3.4.1.1.1 Cell Enclosure 10.3.4.1.1.2 Neutron Absorbing Material 10.3.4.1.1.3 Wrapper Plate 10.3.4.1.1.4 Neutron Absorbing Inserts 10.3.4.1.1.4.1 Seismic and Structural Integrity 10.3.4.1.1.4.2 Fuel Handling Accidents 10.3.4.1.1.4.3 Criticality Analysis 10.3.4.1.1.4.4 Abnormal or Accident Conditions 10.3.4.1.1.4.5 Boraflex Credit for the Interim Period 10.3.4.1.2 Base Plate 10.3.4.1.3 Base Support Assembly 10.3.4.2 Spent Fuel Pool 10.3.4.3 Fuel Pool Level Alarms 10.3.5 Safety Evaluation 10.3.6 Inspection and Testing 10.3.6.1 Boraflex Inspection and Testing 10.3.6.2 Neutron Absorbing Inserts Surveillance Program 10.3.6.2.1 Fast Start Coupon Surveillance Program 10.3.6.2.2 Long-Term Coupon Surveillance Program 10.3.6.2.3 Full rack Insert Surveillance Inspections
10.4 TOOLS AND SERVICING EQUIPMENT 10.4.1 Introduction 10.4.2 Fuel Servicing Equipment 10.4.3 Servicing Aids
CHAPTER 10 10-i REV. 25, APRIL 2015 PBAPS UFSAR
TABLE OF CONTENTS (cont'd)
SECTION TITLE
10.4.4 Reactor Vessel Servicing Equipment 10.4.5 In-Vessel Servicing Equipment 10.4.5.1 Reactor Cavity Work Platform 10.4.6 Refueling Equipment 10.4.7 Storage Equipment 10.4.8 Under-Reactor-Vessel Servicing Equipment 10.4.9 Equipment Storage Pit 10.4.10 Reactor Building Crane 10.4.11 Heavy Loads Compliance 10.4.11.1 NUREG-0612 Phase I Requirements 10.4.11.2 NUREG-0612 Phase II Requirements 10.4.11.3 Safety Evaluation
10.5 FUEL POOL COOLING AND CLEANUP SYSTEM 10.5.1 Power Generation Objective 10.5.2 Power Generation Design Basis 10.5.3 Description 10.5.4 Inspection and Testing
10.6 SERVICE WATER SYSTEM 10.6.1 Power Generation Objective 10.6.2 Power Generation Design Basis 10.6.3 Description 10.6.4 Inspection and Testing
10.7 HIGH-PRESSURE SERVICE WATER SYSTEM 10.7.1 Safety Objective 10.7.2 Safety Design Basis 10.7.3 Power Generation Objective 10.7.4 Power Generation Design Basis 10.7.5 Description 10.7.6 Safety Evaluation 10.7.7 Inspection and Testing
10.8 REACTOR BUILDING COOLING WATER SYSTEM 10.8.1 Power Generation Objective 10.8.2 Power Generation Design Basis 10.8.3 Description 10.8.4 Inspection and Testing
10.9 EMERGENCY SERVICE WATER SYSTEM 10.9.1 Safety Objective 10.9.2 Safety Design Basis 10.9.3 Description
CHAPTER 10 10-ii REV. 25, APRIL 2015 PBAPS UFSAR
TABLE OF CONTENTS (cont'd)
SECTION TITLE
10.9.4 Safety Evaluation 10.9.5 Inspection and Testing
10.10 TURBINE BUILDING COOLING WATER SYSTEM 10.10.1 Power Generation Objective 10.10.2 Power Generation Design Basis 10.10.3 Description 10.10.4 Inspection and Testing
10.11 CHILLED WATER SYSTEM 10.11.1 Power Generation Objective 10.11.2 Power Generation Design Basis 10.11.3 Description 10.11.4 Inspection and Testing
10.12 FIRE PROTECTION PROGRAM
10.13 MAIN CONTROL ROOM AIR CONDITIONING 10.13.1 Power Generation Objective 10.13.2 Power Generation Design Basis 10.13.3 Safety Design Basis 10.13.4 Description 10.13.4.1 Control Room Habitability 10.13.5 Safety Evaluation 10.13.6 Inspection and Testing
10.14 EMERGENCY VENTILATING SYSTEMS 10.14.1 Safety Objective 10.14.2 Safety Design Basis 10.14.3 Description 10.14.3.1 Emergency Switchgear and Battery Rooms 10.14.3.2 Standby Diesel Generator Rooms 10.14.3.3 Service Water Pump Rooms 10.14.4 Safety Evaluation 10.14.5 Inspection and Testing
10.15 PLANT HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS 10.15.1 Power Generation Objective 10.15.2 Power Generation Design Basis 10.15.3 Description 10.15.3.1 General 10.15.3.2 Turbine Building 10.15.3.3 Radwaste Building 10.15.3.4 Miscellaneous Rooms and Buildings
CHAPTER 10 10-iii REV. 25, APRIL 2015 PBAPS UFSAR
TABLE OF CONTENTS (cont'd)
SECTION TITLE
10.15.4 Inspection and Testing 10.16 MAKEUP WATER TREATMENT SYSTEM 10.16.1 Power Generation Objective 10.16.2 Power Generation Design Basis 10.16.3 Description 10.16.4 Inspection and Testing
10.17 INSTRUMENT AIR, SERVICE AIR, AND INSTRUMENT NITROGEN SYSTEMS 10.17.1 Safety Objective 10.17.2 Safety Design Basis 10.17.3 Power Generation Objective 10.17.4 Power Generation Design Basis 10.17.5 Description 10.17.6 Safety Evaluation 10.17.7 Inspection and Testing
10.18 DOMESTIC AND SANITARY WATER SYSTEM 10.18.1 Power Generation Objective 10.18.2 Power Generation Design Basis 10.18.3 Description 10.18.4 Inspection and Testing
10.19 PLANT EQUIPMENT AND FLOOR DRAINAGE SYSTEM 10.19.1 Power Generation Objective 10.19.2 Power Generation Design Basis 10.19.3 Description 10.19.3.1 Radioactive Equipment Drainage System 10.19.3.2 Floor Drainage System 10.19.3.3 Non-Radioactive Drainage System 10.19.3.4 Miscellaneous Drainage System 10.19.3.5 Torus Dewatering Facilities 10.19.4 Inspection and Testing
10.20 PROCESS SAMPLING SYSTEM 10.20.1 Power Generation Objective 10.20.2 Power Generation Design Basis 10.20.3 Description 10.20.4 Inspection and Testing
10.21 COMMUNICATIONS SYSTEMS 10.21.1 Power Generation Objective 10.21.2 Power Generation Design Basis 10.21.3 Description 10.21.4 Inspection and Testing
CHAPTER 10 10-iv REV. 25, APRIL 2015 PBAPS UFSAR
TABLE OF CONTENTS (cont'd)
SECTION TITLE
10.22 STATION LIGHTING SYSTEM 10.22.1 Power Generation Objective 10.22.2 Power Generation Design Basis 10.22.3 Description 10.22.4 Inspection and Testing
10.23 PLANT AUXILIARY BOILERS 10.23.1 Power Generation Objective 10.23.2 Power Generation Design Basis 10.23.3 Description 10.23.4 Inspection and Testing
10.24 EMERGENCY HEAT SINK 10.24.1 Power Generation Objective 10.24.2 Power Generation Design Basis 10.24.3 Description 10.24.4 Inspection and Testing
CHAPTER 10 10-v REV. 25, APRIL 2015 PBAPS UFSAR
SECTION 10.0 -AUXILIARY SYSTEMS
LIST OF TABLES
TABLE TITLE
10.3.1 Available Makeup Water Sources
10.3.2 Rack Module Data (per unit)
10.3.6.1 Long-Term Surveillance Coupons
10.3.6.2 Long-Term Surveillance General Coupon Characterization
10.3.6.3 Frequency for Coupon Inspection
10.5.1 Fuel Pool Cooling and Cleanup System
10.5.2 Summary of Cooling System Analysis Results
10.6.1 Service Water System Data
10.7.1 High-Pressure Service Water System Equipment Data
10.8.1 Reactor Building Cooling Water System Equipment Data
10.9.1 Emergency Service Water System Equipment Data
10.10.1 Turbine Building Cooling Water System Equipment Data
10.20.1 Process Sampling System
10.24.1 Emergency Heat Sink Equipment Data
CHAPTER 10 10-vi REV. 25, APRIL 2015 PBAPS UFSAR
SECTION 10.0 -AUXILIARY SYSTEMS
LIST OF FIGURES
FIGURE TITLE
10.3.1 Rack Assembly
10.3.2 Spent Fuel Storage Cell Nominal Dimensions
10.3.3 Consolidated Fuel Canister Arrangement
10.3.4 Spent Fuel Pool Storage Rack Arrangement (Unit 2)
10.3.5 Spent Fuel Pool Storage Rack Arrangement (Unit 3)
10.3.6 Fuel Rack Plan View
10.3.7 Fuel Storage Rack Assembly Details
10.4.1 Plant Refueling Outage Diagram
10.4.2 Thermal Sleeve
10.4.3 Thermal Sleeve Installation Tool
10.5.1 Deleted
10.5.2 Deleted
10.6.1 Deleted
10.7.1 Deleted
10.8.1 Deleted
10.10.1 Deleted
10.11.1 Deleted
10.12.1a Deleted
10.12.1b Deleted
10.13.1 Deleted
10.13.2 Deleted
CHAPTER 10 10-vii REV. 25, APRIL 2015 PBAPS UFSAR
LIST OF FIGURES (cont'd)
FIGURE TITLE
10.14.1 Deleted
10.14.2 Deleted
10.15.1 Deleted
10.15.2 Deleted
10.16.1 Deleted
10.16.2 Deleted
10.17.1 Deleted
10.17.1 Deleted
10.23.1 Deleted
10.24.1 Deleted
10.24.2 Deleted
10.24.3 Deleted
10.24.4 Emergency Heat Sink Facility