ENS 57090

From kanterella
Revision as of 19:59, 14 May 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 57090 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge

10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000259/LER-2024-002
Reactor Scram Due to Generator Step-Up Transformer Failure
Time - Person (Reporting Time:+-0.88 h-0.0367 days <br />-0.00524 weeks <br />-0.00121 months <br />)
Opened: Chase Hensley
02:22 Apr 25, 2024
NRC Officer: Bill Gott
Last Updated: Apr 25, 2024
57090 - NRC Website
Loading map...