ML23318A178
From kanterella
ML23318A178 | |
Person / Time | |
---|---|
Site: | Turkey Point ![]() |
Issue date: | 11/13/2023 |
From: | Theodore Fanelli NRC/NRR/DRO, NRC/NRR/DRO/IOEB |
To: | |
References | |
Download: ML23318A178 (5) | |
Similar Documents at Turkey Point | |
---|---|
Category:Licensee Event Report (LER)
MONTHYEARML23318A1782023-11-13013 November 2023
[Table view]FAQ 23-03- Turkey Point IE01 05000251/LER-2017-0012017-11-0707 November 2017 Manual Reactor Trip Due to Lowering Steam Generator Level Caused by Loss of Flow Regulating Valve Positioner Control, LER 17-001-00 for Turkey Point, Unit 4, Regarding Manual Reactor Trip Due to Lowering Steam Generator Level Caused by Loss of Flow Regulating Valve Positioner Control 05000250/LER-2017-0012017-05-16016 May 2017 Loss of 3A 4kV Vital Bus Results in Reactor Trip, Safety System Actuations and Loss of Safety Injection Function, LER 17-001-00 for Turkey Point, Unit 3, Regarding Loss of 3A 4kV Vital Bus Results in Reactor Trip, Safety System Actuations, and Loss of Safety Injection Function L-2017-090, LER Special Report Regarding Accident Monitoring Instrumentation2017-05-11011 May 2017 LER Special Report Regarding Accident Monitoring Instrumentation 05000250/LER-2016-0012016-04-0707 April 2016 Loose Breaker Control Power Fuse Caused 3B Emergency Containment Cooler to be Inoperable Longer Than Allowed, LER 16-001-00 for Turkey Point, Unit 3 Regarding Loose Breaker Control Power Fuse Caused the 3B Emergency Containment Cooler to be Inoperable Longer Than Allowed 05000250/LER-2015-0012016-01-19019 January 2016 Diesel Generator Start Resulting From Switchyard Protective Relay Actuation, LER 15-001-00 for Turkey Point, Unit 3 Regarding Diesel Generator Start Resulting from Switchyard Protective Relay Actuation L-2015-217, Turkey, Unit 3 - Special Report Regarding Accident Monitoring Instrumentation2015-08-27027 August 2015 Turkey, Unit 3 - Special Report Regarding Accident Monitoring Instrumentation L-2014-139, Special Report Regarding Accident Monitoring Instrumentation2014-05-14014 May 2014 Special Report Regarding Accident Monitoring Instrumentation L-2009-293, Special Report - Accident Monitoring Instrumentation2009-12-15015 December 2009 Special Report - Accident Monitoring Instrumentation L-2009-155, LER 09-02-00 for Turkey Point, Unit 3 MSIV Drain Line Leak Causes Technical Specification Required Shutdown; Failure to Perform PMT Causes Inoperable MSIV2009-07-0202 July 2009 LER 09-02-00 for Turkey Point, Unit 3 MSIV Drain Line Leak Causes Technical Specification Required Shutdown; Failure to Perform PMT Causes Inoperable MSIV ML0906404452008-10-0606 October 2008 Enclosure 11 - Case Study 7: Turkey Point NCV on TS 3/4.4.10, Structural Integrity (Applicability of Sr'S 'And Actions) - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML18227D3941978-08-25025 August 1978 08/25/1978 Letter Attached Report of Abnormal Indications from Metal Impact Monitoring System, Which Occurred During Unit Cooldown for Refueling ML18228A4811978-04-0404 April 1978 04/04/1978 Letter Response to Request for Additional Information on System Disturbance of May 16, 1977 L-78-104, Transmitting Evaluation Report of Abnormal Indications from Metal Impact Monitoring System, Turkey Point Unit No. 4.1978-03-23023 March 1978 Transmitting Evaluation Report of Abnormal Indications from Metal Impact Monitoring System, Turkey Point Unit No. 4. ML18227D4511977-09-30030 September 1977 09/30/1977 Letter Report of Abnormal Indications from Metal Impact Monitoring System ML18227A5101977-09-0606 September 1977 LER 1977-251-07 for Turkey Point, Unit 4 - Pressurizer Heatup Rate L-77-191, 06/23/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Proposal Submitted to Satisfy Commitment Made in Reportable Occurrence Report 250-77-5 of 05/02/19771977-06-23023 June 1977 06/23/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Proposal Submitted to Satisfy Commitment Made in Reportable Occurrence Report 250-77-5 of 05/02/1977 ML18227B2481977-06-23023 June 1977 06/23/1977 Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Analysis Performed by Applicant'S NSSS Vendor Results Related to Reactor Core Thermal Power Output ML18227B2491977-06-23023 June 1977 06/23/1977 Letter Proposed Amendment to Appendix a of Facility Operating Licenses, Concerning Analysis Performed by Applicant'S NSSS Vendor Results Related to Reactor Core Thermal Power Output ML18227A4241977-05-0202 May 1977 Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 4/18/1977 for Nominal Power ML18227A4251977-02-0707 February 1977 Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification, Occurrence on 1/8/1977 for Bfd Relays ML18227D2871977-01-14014 January 1977 Submit Personal Radiation Exposure Report in Accordance with the Requirements of 10 CFR 20.405 ML18227D2881977-01-14014 January 1977 Submit Personal Radiation Exposure Report in Accordance with the Requirements of 10 CFR 20.405 ML18227A4281976-10-20020 October 1976 Submit Licensee Event Report of Turkey Point Unit 3, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 10/6/1976 for Boron Injection Tank ML18227A4261976-10-0606 October 1976 Referring Licensee Event Report Submitted on 8/25/1976 with Occurrence Date of 7/26/1976. in the Report, Reportable Occurrence Report No 250-72-2 Should Be Changed to 250-76-2. Attached Corrected Report ML18227A4271976-08-25025 August 1976 Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification, Occurrence on 7/26/1976 for Malfunction of 4B Starting Transformer Breaker ML18227A4291976-08-19019 August 1976 Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 8/5/1976 for ECCS Analysis ML18227A4311976-06-25025 June 1976 Letter Transmitting Licensee Event Report, Low Boron Concentration Occurred in Unit 4 on 6/12/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4331976-06-25025 June 1976 Letter Transmitting Licensee Event Report, Low Boron Concentration, Occurred in Unit 4 on 6/11/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4301976-06-25025 June 1976 Letter Transmitting Licensee Event Report, Low Boron Concentration Occurred in Unit 4 on 6/12/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4321976-06-25025 June 1976 Letter Transmitting Licensee Event Report, Low Boron Concentration Occurred in Unit 4 on 6/11/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4351976-06-0404 June 1976 Transmitting Letter to Correct Report Sent on 5/27/1976. Line 2 of Description Words Steam Generator 4 Needs to Be Corrected to Steam Generator 4C Attached Corrected Page 1 ML18227D3541976-06-0404 June 1976 Correction to Licensee Event Report Which Occurred on 5/17/1976 by Correcting Steam Generator 4 to Steam Generator 4C on Event Description ML18227A4341976-05-27027 May 1976 Letter Transmitting Licensee Event Report, Steam Generator Tube Support Plate, Occurred in Unit 4 on 5/17/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4361976-05-27027 May 1976 Letter Transmitting Licensee Event Report, Steam Generator Tube Support Plate, in Unit 4 Occurred on 5/17/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4381976-02-26026 February 1976 Letter Transmitting Licensee Event Report, Low Level in Refueling Water Storage Tank in Unit 4 Occurred on 2/14/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4391976-02-26026 February 1976 Letter Transmitting Licensee Event Report, Low Level in Refueling Water Storage Tank in Unit 4 Occurred on 2/14/1976 in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification ML18227A4401976-02-25025 February 1976 Letter Transmitting Licensee Event Report, High Setpoint for Overtemperature Delta-T Reactor Trip Channel II in Unit 4 Occurred on 1/30/1976 in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification ML18227A4411975-12-22022 December 1975 Letter Reporting Abnormal Occurrence of Low Boron Concentration in Unit 4 Boron Injection Tank on 12/12/1975 ML18227B0221975-07-0707 July 1975 Reporting Unusual Event No. 251-75-1 of Revised ECCS Analysis, for Value for Peak Clad Temperature Is in Error 2023-11-13 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML23318A178&oldid=3643906"