MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20058E4131993-12-0101 December 1993 Notification of Significant Licensee Meeting 93-290 W/Util on 931210 Re Enforcement Conference Concerning Licensee Failure to Comply W/Radiation Area Control Procedures ML20059F8771993-10-28028 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md Re Results of Core Shroud Insp at Plant ML20057F8771993-10-14014 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md to Discuss Certain Cost Beneficial Licensing Actions ML20056G0561993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Planned Installation of Certain Analog to Digital Retrofit Modifications During Refueling Outage Scheduled to Begin 930918 ML20056E0461993-08-17017 August 1993 Notification of 930824 Meeting W/Util in Rockville,Md to Discuss Control & Maint Qualifications & License Status for Lsros to Fuel Handling Licensed at Pbaps,Units 2 & 3 & LGS, Units 1 & 2 ML20236K8531993-04-16016 April 1993 Responds to 930212 Note Re Operability Issues During Lsft. Based on Review of Info Provided Re IR 50-277/92-32 Agree That Licensee Does Not Conform to Guidance in GL 91-18 ML20128P5341993-02-19019 February 1993 Notification of 930225 Meeting W/Util in Wayne,Pa to Discuss Evaluation for Conversion to 24-month Fuel Cycle from Current 18-month Period ML20128P5561993-02-12012 February 1993 Notification of Significant Licensee Meeting 93-19 W/Util on 930226 to Discuss QA Change Request for Facilities ML20128K2651993-02-11011 February 1993 Notification of 930222 Meeting W/Util in Rockville,Md to Discuss Planned Mod to on-site Power Distribution Sys at Plant ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20127F3901992-12-31031 December 1992 Notification of 930120 Peach Bottom SALP Mgt Meeting 92-186 on 930120 in Delta,Pa to Present NRC Assessment of Util Performance for Period 910804 - 921031 ML20127L0861992-12-29029 December 1992 Notification of Significant Licensee Meeting 92-188 on 930107 in King of Prussia,Pa to Discuss Common Emergency Plan for Plants ML20126B4721992-12-10010 December 1992 Notification of Significant Licensee Meeting 92-180 W/Util on 921218 to Discuss Needs Program.Meeting Closed to Public Due to Sensitive Personnel Related Issues 1999-08-20
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20058E4131993-12-0101 December 1993 Notification of Significant Licensee Meeting 93-290 W/Util on 931210 Re Enforcement Conference Concerning Licensee Failure to Comply W/Radiation Area Control Procedures ML20059F8771993-10-28028 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md Re Results of Core Shroud Insp at Plant ML20057F8771993-10-14014 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md to Discuss Certain Cost Beneficial Licensing Actions ML20056E0461993-08-17017 August 1993 Notification of 930824 Meeting W/Util in Rockville,Md to Discuss Control & Maint Qualifications & License Status for Lsros to Fuel Handling Licensed at Pbaps,Units 2 & 3 & LGS, Units 1 & 2 ML20236K8531993-04-16016 April 1993 Responds to 930212 Note Re Operability Issues During Lsft. Based on Review of Info Provided Re IR 50-277/92-32 Agree That Licensee Does Not Conform to Guidance in GL 91-18 ML20128P5341993-02-19019 February 1993 Notification of 930225 Meeting W/Util in Wayne,Pa to Discuss Evaluation for Conversion to 24-month Fuel Cycle from Current 18-month Period ML20128P5561993-02-12012 February 1993 Notification of Significant Licensee Meeting 93-19 W/Util on 930226 to Discuss QA Change Request for Facilities ML20128K2651993-02-11011 February 1993 Notification of 930222 Meeting W/Util in Rockville,Md to Discuss Planned Mod to on-site Power Distribution Sys at Plant ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20127F3901992-12-31031 December 1992 Notification of 930120 Peach Bottom SALP Mgt Meeting 92-186 on 930120 in Delta,Pa to Present NRC Assessment of Util Performance for Period 910804 - 921031 ML20127L0861992-12-29029 December 1992 Notification of Significant Licensee Meeting 92-188 on 930107 in King of Prussia,Pa to Discuss Common Emergency Plan for Plants ML20126B4721992-12-10010 December 1992 Notification of Significant Licensee Meeting 92-180 W/Util on 921218 to Discuss Needs Program.Meeting Closed to Public Due to Sensitive Personnel Related Issues 1999-08-20
[Table view] |
Inspection Report - - 2011005 |
---|
|
|
Text
, .
,
m
'
.:
' '
M, . ,
.a r
l
+ '
09 NOVi1987 Docket Nos.. 50-277' l
'50-27 '
]
MEMORANDUM FOR: William F. 'Kane,: Director, Division of Reactor' Project's1
-
,
'FROM: ' J. C. Linville, Chief, Reactor' ProjectsiSection~ 2A' ,
. SUBJECT: PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR THE'-
' PERIOD October 23 - November 5, 1987.- -
Enclosed is the' Peach Bottom periodic status report from/the' NRC Resident-Office at Peach Bottom. .Three.NRC. resident inspectors l monitored activ'itie at the plant during the report' perio '
~
These status reports are intene'ed to provide NRC management and the public with
"
an overview of plant activities and-NRC inspection activities. Subsequent ~
~
inspection reports will' address many of.these 'topicsLin:more detai :
'
Sign-James'C. Linville, Chief :
Reactor Projects.Section PA'. .j Enclosure: As. Stated
,
I
!
l
'!
i 0FFICIAL RECORD COPY: PB'-STATUS / REPORT - 0001.0.0l j
.
O'71'1130111 871109 . . . 11/09/87 jor mocooggy Q l, p ,
m- -- -- . - _-
-
1 '
E
William F. Kane 2 Qhg iggy j l
!
cc w/ encl: l Dickinson M. Smith,. Manager, Peach Bottom-Atomic Power S'ation t 1 John S. Kemper, Senior Vice President, Engineering and Production I Thomas S. Shaw, Jr. , Vice President, Production {
Troy B. Conner, Jr. , Esquire i W. H. Hirst, Director, Joint Generation Projects Department, d Atlantic Electric .
G. Leitch, Nuclear Generation Manager l Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report) 'l Raymond L. Hovis,. Esquire Thomas Magette, Power Plant. Siting, Nuclear Evaluations ],
W. M. Alden, Engineer in Charge,- Licensing Section Doris Poulson, Secretary of Harford County Council J Public Document Reom (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector i Commonwealth of Pennsylvania bec w/encis: -
Region I Docket Room (with concurrences) '
J. Taylor, EDO
'
T. Murley, NRR R. Starostecki, NRR F. Miraglia, NRR S. Varga, NRR 9. Boyer, NRR W. Butler, NRR R. Martin, NRR W. Rutsell, RI W. Johnston, RI T. Martin, RI ,
S. Collins, RI !
R. Gallo, RI !
K. Abraham, RI M. Miller, RI J. Williams, RI L. Scholl, RI l
i 1 l
RLDP .,,h, W. - , e ,
11M/87 11/O{/87 0FFICIAL RECORD COPY PB STATUS REPORT - 0002. j 11/09/87
_ _ _ . _ _ ____ _
!
.
. r ENCLOSURE PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR'THE PERI'00-October 23 - November 5, 1987 1 1.0 Plant Status As of 8:00 a.m. on November 5,1987, Unit 2 and- 3 are in a cold condition per the March 31, 1987,'NRC Order with coolant temperatures less than 200 -
degrees Fahrenheit. The Unit 3 core is completely off loade !
2.0 Facility Operations Summary j Unit 2 is completing a refueling outage which began March 13, 198 Final work is being performed to support the reactor pressure vessel .
hydrostatic test. Unit 3 has been in a cold condition per the March 31, I 1987, NRC Order since April 1, 1987. The Unit 3 recirculation system l pipe replacement outage is in progress. The Unit 3 core off load was d completed on October 28, 1987. In .adition, twenty-two control rod blades have been exchanged and twelve local power range monitor strings are currently being exchange .0 Items of Special Interest A public meeting was held on November 4, 1987, in Lancaster County, i Pennsylvania, to receive public comments on the' Philadelphia Electric j Company (PECo) Commitment to Excellence Action Pla Fourteen people ;
spoke to express their views on this Pla ;
!
4.0 Other Items of Interest 4.1 The licensee has implemented the following shift operations organizational changes:- (1) J. Cotton assumed the duties-of Super-intendent, Operations on October 23;'and (2) the Shift Managers assumed the duties previously held by the Shift Superintendents effective 11:00 p.m. on October 25. In addition, on October 23
'
the following announcements were made regarding the proposed PECo corporate / plant reorganization: (1) M. J. McCormick, Peach Bottom Plant Manager; and -(2) K. Powers Peach Bottom Project Manage ,
4.2 On October 26, Unit 3 received a spurious triple low reactor water )
level signal. A blocking permit hari been applied to a Yarway level -
j indicating switch so that it could be replaced. 'After the permit >
was applied, maintenance, personnel tried to dr?.in the water in the switch and went beyond the boundary of the permit. Subsequently, i the entire variable leg header was drained, causing the unplanned 'I triple low signal. The only actions that occurred were a Unit 3 l high pressure service water (HPSW) pump trip and a loss of shutdown j cooling (SOC) at Unit 2. Operators manually secured SDC on Unit 3 ;
when the HPSW pump tripped. Operators restored SDC at tsoth units 1 within three minute l OFFICIAL RECORD COPY PB STATUS REPORT - 0003. l 11/09/87 l
l- - _- -- -_ _= - -- _ _ - - - - _ _ _ - -- _ - - - . _ - - - _ _
- ___ j
,
.
!
'. :
-s ;
i 4.3 LThe licensee's security organization conducted a search of the Peach-Bottom site from 3:00 a.m. to 6:00 a.m. on October 30, using five- 1 teams composed of trained drug dogs, handlers, Pennsylvania State l Police, and PECo security representativ The' search encompassed !
areas both inside and outside the. Peach 6 : tom 2 & 3 protected l areas. The search teams were complimented by forensic experts and ]
licensee site security and station. management. No contraband was 1 found. The licensee's investigation.into alleged drug activities is q continuing. All three NRC resident inspectors were on site and !
observed the search activitie The resident' inspectors are following the licensee investigations and I corrective actions'regarding these' occurrence ,
5.0 NRC Activities During the Period l l l
Three NRC Resident Inspectors were assigned to monitor plant activities I between October 23 and November 5, 1987. These individuals consisted of the following:
Thomas P. Johnsor - Senior Resident Inspector Richard J. Urban - Resident Inspector Larry E. Myers - Resident Inspector l t
Areas inspected included operational safety, shutdown order commitments, radiation protection, physical security, control room activities and demeanor, reportable events, surveillance testing, outage activities, maintenance, and outstanding items, i
!
An inservice tdsting team inspection was perfonned at Peach Bottom by - i region based inspectors complimented by an NRC headquarters individual -l and a contractor from November 2 --November 6, 198 {
Three region based inspectors were also on site the week of November l One inspector was reviewing existing unresolved items, one inspector was i reviewing recirculation pipe replacement activities, and one inspector !
was reviewing refueling cavity bellows seal The results of these inspections will be included in a future status- ,
repor l NRC Combined Inspection Report 50-277/87-18 and 50-278/87-18 was issued October 28, 1987. The inspection was an Environmental Qualification (EQ)
Team inspection conducted June 15 - 19, 1987. A review was conducted concerning the EQ program for establishing and maintaining the qualifica-tion of electrical equipment important to safety within the scope of 10 CFR 50.49. No violations were note :
0FFICIAL RECORD COPY PB STATUS REPORT - 0004. /09/87
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ - - _ _ - __ _ . _ _ _ _ _ _ -