ML23199A124

From kanterella
Revision as of 00:56, 2 August 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Form 2.3-1 Examination Outline Quality Checklist
ML23199A124
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/03/2023
From:
NRC/RGN-III/DORS/OB
To:
Florida Power & Light Energy Point Beach
Jim Nance
Shared Package
ML22007A029 List:
References
Download: ML23199A124 (1)


Text

Form ES-2.3-1 Examination Outline Quality Checklist Facility: Point Beach Date of Examination: Feb 20, 2023 (Y)es / (N)o Item Task Description a b* c#

a. The outline was systematically and randomly prepared in accordance with the instructions in Section B of ES-4.1, and all knowledge and ability (K/A) categories are Y N/A Y WRITTEN appropriately sampled.
b. The outline does not overemphasize any systems, evolutions, or generic topics. Y N/A Y
c. Justifications for deselected or rejected K/A statements are acceptable. Y N/A Y
a. Using Form 3.4-1, Events and Evolutions Checklist, verify that the proposed scenario set contains the required number of normal evolutions, reactivity evolutions, instrument and component failures, manual control evolutions, technical specifications, and major Y N/A Y transients.

SIMULATOR

b. There are enough scenarios (and spares) for the projected number and mix of applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity. Ensure that scenarios will not be repeated on Y N/A Y subsequent days.
c. Ensure that all scenarios are new or significantly modified in accordance with ES-3.4 Y N/A Y and that no scenarios are duplicated from the applicants audit test(s).
d. To the extent possible, assess whether the outline(s) conforms with the qualitative and Y N/A Y quantitative simulator set criteria specified on Form 2.3-2.
a. Verify that the administrative outline meets the criteria specified in the instructions on Y N/A Y Form 3.2-1 and that no tasks are duplicated from the applicants audit test(s).
b. Verify that the control room and in-plant systems outline meets the criteria specified in Y N/A Y JPMS the instructions on Form 3.2-2 and that no tasks are duplicated from the applicants audit test(s).
c. Determine whether the number of job performance measures (JPMs) and JPM types is sufficient for the projected number and mix of applicants and ensure that no items are Y N/A Y duplicated on subsequent days.
a. Assess whether the appropriate exam sections cover plant-specific priorities (including Y N/A Y probabilistic risk assessment and individual plant examination insights).
b. Assess whether the 10 CFR 55.41, 10 CFR 55.43, and 10 CFR 55.45 sampling is Y N/A Y appropriate.

GENERAL

c. Check whether K/A importance ratings (except for plant-specific priorities) are greater Y N/A Y than or equal to 2.5.
d. Check for duplication and overlap across the exam and with the last two NRC exams. Y N/A Y
e. Check the entire exam for balance of coverage. Y N/A Y
f. Assess whether the exam fits the appropriate job level (reactor operator or senior Y N/A Y reactor operator).

Printed Name/Signature Date

a. Author Troy Henning / Troy J. Henning_and_Jeff Correll / Jeffrey A. Correll 2/02/2023_
b. Facility Reviewer (*) _N/A_____________________________________________________________
c. NRC Reviewer (#) Randal Dean Baker / _____________________2/2/2023__

NRC Chief Examiner James C. Nance / Janes C. Nance _____________________________2/2/2023__

NRC Supervisor 2/3/2023 April Nguyen / _____________________________________________________

  • The facility licensee signature is not applicable for NRC-developed tests.
  1. An independent NRC reviewer performs the steps in column c. This may be the NRC Chief Examiner if he/she did not develop the outline under review.