ML23160A183

From kanterella
Revision as of 11:03, 17 July 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
3.4-1 Events and Evolutions Checklist
ML23160A183
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/16/2023
From:
Constellation Energy Generation
To:
NRC/RGN-III
Gregory Roach
Shared Package
ML22007A047 List:
References
Download: ML23160A183 (1)


Text

Form 3.4-1 Events and Evolutions Checklist Scenario 1 is the spare scenario. Scenario 1 is listed below to show the numbers if it is required to be used. The events in Scenario 1 are not included in the totals on the right.

+

Facility: Dresden Power Station Date of Exam: 4/10/2023 Operating Test No: 2023-301 NRC Exam E Scenarios A V 1 M P E 2 3 4 (Spare, numbers not I P N included in totals) T N

L T O Position Position Position Position I I T M C T A S A B S A B S A B S A B U A Y L R T O R T O R T O R T O M*

N P O C P O C P O C P O C P T E RO I U RX 5 2 4 2 1 1 0 NOR 1 1 1 1 1 1 Niedzwiecki 2,3, 2,3,4 I/C 4,6 3,5

,5,6 7 4 4 2 MAJ 7,8 6,7 7,8 4 2 2 1 Man. Ctrl 5 1 1 1 0 TS 4,6 2,3 2 0 2 2 RX 2 1 1 1 0 NOR 1 1 1 2 1 1 1 Norman I/C 4, 6 3,4,5 3,4,5 6# 4 4 2 MAJ 7,8 6,7 7,8 4 2 2 1 Man. Ctrl 4 4 1 1 1 0 TS 3,4 2 0 2 2 RX 5 4 1 1 1 0 NOR 1 1 1 1 1 Kaluzny I/C 2,3 3,4 2,6 4 4 4 2 MAJ 7,8 6,7 7,8 4 2 2 1 Man. Ctrl 2 1 1 1 0 TS 0 0 2 2 RX 2 3 4 3 1 1 0 NOR 1 1 2 1 1 1 2,3,4 2,3,4 Hanley I/C 3,5

,5 ,5,6 11 4 4 2 MAJ 6,7 6,7 7,8 6 2 2 1 Man. Ctrl 5 1 1 1 0 TS 2,4 2,3 4 0 2 2 RX 2 1 1 1 0 NOR 1 1 2 1 1 1 Edwards I/C 3,4,5 3,4,5 6# 4 4 2 MAJ 6,7 7,8 4 2 2 1 Man. Ctrl 4 1 1 1 0 TS 3,4 2 0 2 2

Form 3.4-1 Events and Evolutions Checklist Facility: Dresden Power Station Date of Exam: 4/10/2023 Operating Test No: 2023-301 NRC Exam E Scenarios A V 1 M P E (Spare, numbers not 2 3 4 I P N included in totals) T N L T Position Position Position Position O I I T M C T S A B S A B S A B S A B A U A Y R T O R T O R T O R T O L M*

N P O C P O C P O C P O C P T E RO I U RX 4 1 1 1 0 NOR 1 1 2 1 1 1 Gibney I/C 3 3,5,8 2,6 6 4 4 2 MAJ 6,7 6,7 7,8 6 2 2 1 Man. Ctrl 5 2 2 1 1 0 TS 0 0 2 2 RX 2 3 4 3 1 1 0 NOR 1 1 2 1 1 1 2,3,4 I/C 3,4,5 2,4

,5,6 10 4 4 2 Ali MAJ 6,7 6,7 7,8 6 2 2 1 Man. Ctrl 4 1 1 1 0 TS 3,4 2,3 4 0 2 2 RX 4 1 1 1 0 NOR 1 1 1 1 1 Trafton I/C 3,4 2,6 4 4 4 2 MAJ 6,7 7,8 4 2 2 1 Man. Ctrl 2 1 1 1 0 TS 0 0 2 2 RX 2 1 1 1 0 NOR 1 1 1 1 1 Johnson I/C 3,5 3,4,5 5 4 4 2 MAJ 6,7 7,8 4 2 2 1 Man. Ctrl 5 4 2 1 1 0 TS 0 0 2 2

- Extra component/instrument failure as ATC/BOP to replace missed reactivity move while acting as ATC/BOP.

Form 3.4-1 Events and Evolutions Checklist Form 3.4-1 Instructions for the Events and Evolutions Checklist

1. Mark the applicant license level for each simulator operating test number.
2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
  • Minimums are subject to the instructions in Section C.2, License Level Criteria.

KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO =

Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan