MONTHYEARML24277A0812024-10-0303 October 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon Collected on 10/02/2024 ML24269A0362024-09-24024 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/24/2024 ML24248A0452024-09-0303 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/3/2024 ML24229A0422024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding ML24229A0432024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding ML24228A1942024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form for a Live - Atlantic Sturgeon 8/14/2024 ML24227A5092024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 8/13/2024 ML24219A2472024-07-0909 July 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Shortnose Sturgeon 7/9/2024 ML24123A0522024-05-0101 May 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - One Deceased Sturgeon 4/30/2024 ML24106A0542024-04-12012 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Alive Atlantic Sturgeon 4/12/2024 ML24101A2192024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 4/8/24 ML24093A1222024-04-0101 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Atlantic Sturgeon 4/1/2024 ML24075A1862024-03-14014 March 2024 NRR E-mail Capture - (External_Sender) Biological Opinion Gar 2020-02842 - PSEG Salem and Hope Creek Generating Station Annual Incidental Take Report - 2023 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24030A8432024-01-30030 January 2024 NRR E-mail Capture - (External_Sender) 2023 PSEG Sturgeon Pit Tag Data ML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemp'S Ridley Sea Turtle Collected on 06/12/2023 ML24250A0572023-06-0606 June 2023 PSEG to NMFS, Request for Sturgeon Fin Clip Analysis Facilities ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 ML22357A0102022-12-21021 December 2022 NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2392022-12-20020 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 ML22333A9022022-11-29029 November 2022 NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG ML22291A3702022-10-18018 October 2022 NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) ML22290A2202022-10-17017 October 2022 NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG 2024-09-03
[Table view] |
Text
From: Cary, Richard H. <Richard.Cary@pseg.com>
Sent: Wednesday, June 21, 2023 9:05 AM To: nmfs.gar.incidental-take@noaa.gov; EndangeredSpecies Resource Cc: Corbett, Heather [DEP]; Fehring, Shana [DEP]; Neilan, Brian [DEP]
Subject:
[External_Sender] Salem Generating Station - Incidental Take Report - Kemp's ridley sea turtle Attachments: Sea turtle Incidental Take Report 6-20-23.pdf Attached is the Incidental Take Report for a deceased Kemps ridley sea turtle collected on 06/20/2022 from the Salem Generating Station during routine raking of the cooling water intake trash bars. The NJ Marine Mammal Stranding Center did not take possession of the specimen for potential necropsy due to the advanced state of decomposition. The specimen has been held for study pending direction from NOAA/NMFS. This incidental take is authorized under Biological Opinion GAR-2020-02842.
Thanks, and please let me know if you have any questions or need additional information.
Richard Cary Environmental Compliance & Program Manager PSEG Nuclear Environmental Affairs O: 856-339-1487 The information contained in this e-mail, including any attachment(s), is intended solely for use by the named addressee(s). If you are not the intended recipient, or a person designated as responsible for delivering such messages to the intended recipient, you are not authorized to disclose, copy, distribute or retain this message, in whole or in part, without written authorization from PSEG. This e-mail may contain proprietary, confidential or privileged information. If you have received this message in error, please notify the sender immediately. This notice is included in all e-mail messages leaving PSEG. Thank you for your cooperation.
Hearing Identifier: NRR_DRMA Email Number: 2138 Mail Envelope Properties (c3e06deb8fc04ef39003aa473574dede)
Subject:
[External_Sender] Salem Generating Station - Incidental Take Report - Kemp's ridley sea turtle Sent Date: 6/21/2023 9:04:31 AM Received Date: 6/21/2023 9:06:49 AM From: Cary, Richard H.
Created By: Richard.Cary@pseg.com Recipients:
"Corbett, Heather [DEP]" <Heather.Corbett@dep.nj.gov>
Tracking Status: None "Fehring, Shana [DEP]" <Shana.Fehring@dep.nj.gov>
Tracking Status: None "Neilan, Brian [DEP]" <Brian.Neilan@dep.nj.gov>
Tracking Status: None "nmfs.gar.incidental-take@noaa.gov" <nmfs.gar.incidental-take@noaa.gov>
Tracking Status: None "EndangeredSpecies Resource" <EndangeredSpecies.Resource@nrc.gov>
Tracking Status: None Post Office: pseg.com Files Size Date & Time MESSAGE 1355 6/21/2023 9:06:49 AM Sea turtle Incidental Take Report 6-20-23.pdf 975223 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
APPENDIX B - Part 1 (Sea Turtle)
Incident Report Sea Turtle Take - PSEG Salem Generating Station Photographs should be taken and the following information should be collected from all turtles and sturgeon (alive and dead) found in association with Salem. Please submit all turtle necropsy results (including sex and stomach contents) to NMFS upon receipt.
Observer's full name: Matthew McQueston (ECSI)
Reporters full name: Matthew McQueston (ECSI)
Species Identification (Key attached): Kemps ridley (Lepidochelys kempii)
Site of Impingement (Unit 1 or 2, CWS or DWS, Bay #, etc.): Salem Circulating Water Intake, Unit 1, 11B Date animal observed: 06-20-23 Time animal observed: 12:50 Date animal collected: 06-20-23 Time animal collected: 12:55 Date rehab facility contacted: 6-20-23 Time rehab facility contacted: 13:30 Date animal picked up/ delivered to facility: NA Time animal picked up/delivered to facility: NA Marine Mammal Stranding Center was contacted regarding the incidental take, but they declined taking possession of the carcass due to its condition and requested that it be disposed of in an appropriate manner.
Environmental conditions at time of observation (i.e., tidal stage, weather):
Salinity: 10.0ppt Sky condition: overcast Tide: Flood 2 (93.5ft.) Air temp. 22.5°C Wave height: calm Wind - NE Date and time of last inspection of screen: 06/20/23 @ 11:24 AM Water temperature (°C) at site and time of observation: 23.5°C Number of pumps operating at time of observation: 12 Circulators in operation Average percent of power generating capacity achieved per unit at time of observation: Unit 1-100.2% / Unit 2-99.6%
Average percent of power generating capacity achieved per unit over the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> previous to observation: Unit 1-99.8 %
/ Unit 2-99.6%
Sea Turtle Information: (please designate cm/m or inches)
Fate of animal (circle one): dead alive Condition of animal (include comments on injuries, whether the turtle is healthy or emaciated, general behavior while at Salem.
During routine inspection and cleaning, Salem Yard Crew personnel retrieved a deceased Kemps ridley sea turtle from Salem circulator intake. Salem Unit Control and PSEG Nuclear Environmental Affairs personnel were notified. After contacting PSEG Nuclear Environmental Affairs (NEA) personnel, Environmental Consulting Services Inc. (ECSI) personnel verified species identification and began processing of the specimen. At the direction of PSEG NEA, the deceased specimen was transported back to the ECSI office, and placed in refrigeration, awaiting further direction on final disposition from NMFS.
Carapace length - Curved: 30.0cm Straight: 28.0cm Carapace width - Curved: 31.5cm Straight: 27.5cm Existing tags? YES / NO Please record all tag numbers. Tag # _____________________
Photograph attached: YES / NO 1
APPENDIX B, continued (Incident Report of Sea Turtle Take)
Draw wounds, abnormalities, tag locations on diagram and briefly describe below.
Description of animal:
Specimen was in very poor condition at the time of retrieval, with damage to the head and neck, in addition to the effects of advanced decomposition. External tags were not found, and an internal PIT tag was not indicated.
All information should be sent to the following address:
National Marine Fisheries Service, Northeast Region Protected Resources Division Attention: Section 7 Coordinator 55 Great Republic Drive Gloucester, MA 01930 Phone: (978) 281-9328 FAX: (978) 281-9394 2
Salem SGS Incidental Take Report - Sea Turtle Attachment 1 Dorsal view of a deceased, Kemps ridley sea turtle, collected from Salem CWIS intake on 06-20-2023 by Salem Yard crew personnel. Specimen was in a state of advanced decomposition, and evidence of damage was observed to the head and neck in the form of bruising and a minor laceration (06/20/2023).
A ventral view of the specimen, showing the condition of the plastron. Discoloration of the skin, missing scutes, and foul odor indicated an advanced stage of decomposition (06/20/2023).
3
Salem SGS Incidental Take Report - Sea Turtle Attachment 1 Dorsal view of the head, showing minor bruising to the anterior portion of the head. A minor laceration was observed at the base of the neck (06/20/2023).
The existence of distinct pores near the margins of the inframarginal scutes (identified by the red circles in photo) on both sides of the plastron, verify the identity of the specimen as a Kemps ridley turtle [06/20/2023].
4