ML20059G317

From kanterella
Revision as of 07:20, 2 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Exam Rept 50-128/OL-93-03 on Stated Date.Exam Results: Candidate Successfully Passed SRO Upgrade Exam
ML20059G317
Person / Time
Site: 05000128
Issue date: 12/09/1993
From: Caldwell J, Eresian W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20058L364 List:
References
50-128-OL-93-03, 50-128-OL-93-3, NUDOCS 9401240099
Download: ML20059G317 (2)


Text

i

$ ENCLOSURE 1 -

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.: 50-128/0L-93-03 FACILITY DOCKET N0.: 50-128 FACILITY LICENSE NO.: R-83 FACILITY: Texas A&M University System EXAMINATION DATES: November 9, 1993 EXAMINER: Warr n tresian, C f Examiner SUBMITTED BY:  !/ _ ,(n.sq 'MA /2 /v0 3

~Rafren trestan, Chief Examiner Date APPROVED BY: W M** ' - /2-/ 9 N 3

(# James L. Caldwell, Chief Date Non-Power Reactor Section Operator Licensing Branch Di ision of Reactor Controls and Human Factor:

Office of Nuclear Reactor Regulation

SUMMARY

The NRC administered an initial license examination to one Senior Reactor Operator (Upgrade) applicant. The applicant passed the examination.

l l

l 4

i l

l i

9401240099 931209 -

PDR ADOCK 05000128 '

V PDR l

. D=

f- -

REPORT DETAILS

1. Examir:er:

i Warren Eresian, Chief Examiner

2. Results:

R0 SRO Total I (Pass / Fail) (Pass / Fail) (Pass / Fail) ,

NRC Grading: 0/0 1/0 1/0  !

3. Written Examination:

A written examination was not required. i

4. Operating Test:

The SRO (Upgrade) applicant passed the operating test.

5. Exit Meeting: .;

An exit meeting was held on November 9, 1993. Present were:

Warren Eresian, NRC Chief Examiner Bill F. Asher, Manager of Operations t The NRC thanked Texas A&M for their assistance and cooperation during i the examination. The NRC provided some observations concerning the i examination.

k i

k k