ML20137L341
ML20137L341 | |
Person / Time | |
---|---|
Site: | 05000128 |
Issue date: | 04/01/1997 |
From: | Eresian W NRC (Affiliation Not Assigned) |
To: | |
Shared Package | |
ML20137L334 | List: |
References | |
50-128-OL-97-01, 50-128-OL-97-1, NUDOCS 9704070204 | |
Download: ML20137L341 (2) | |
Similar Documents at 05000128 | |
---|---|
Category:EXAMINATION REPORT
MONTHYEARML20195J4851999-06-0303 June 1999
[Table view]NRC Operator Licensing Exam Rept 50-128/OL-99-01 (Including Completed & Graded Tests) for Tests Administered on 990405- 06.Exam Results:Both Candidates Failed Written Portion of Exams ML20154F5601998-09-18018 September 1998 NRC Operator Licensing Exam Rept 50-128/OL-98-02 (Including Completed & Graded Tests) for Retake Exam Administered on 980914 to One Reactor Operator Candidate.Candidate Passed Exam ML20217B2151997-09-0303 September 1997 NRC Operator Licensing Exam Rept 50-128/OL-97-02 Including Completed & Graded Tests for Tests Administered on 970825- 26.Exam Results:One RO & One SRO Passed Exam.Two ROs Failed Exam ML20137L3411997-04-0101 April 1997 NRC Operator Licensing Retake Exam Rept 50-128/OL-97-01 on 970324.Applicant Passed Category B.Categories a & C Were Waived ML20135E9551996-12-0303 December 1996 NRC Operator Licensing Exam Rept 50-128/OL-96-02 Administered on 961119-21.Exam Results:Four Applicants Passed Exam & One Applicant Failed Exam ML20059G3171993-12-0909 December 1993 Exam Rept 50-128/OL-93-03 on Stated Date.Exam Results: Candidate Successfully Passed SRO Upgrade Exam ML20056C4571993-06-0707 June 1993 Exam Rept 50-128/OL-93-02 on 930518.Exam Results:Applicant Passed Both Written Exam & Operating Evaluation 1999-06-03 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000128/19992011999-07-0909 July 1999
[Table view]Insp Rept 50-128/99-201 on 990608-10.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp,Verification of C/A Previously Committed to by Licensee ML20195J4851999-06-0303 June 1999 NRC Operator Licensing Exam Rept 50-128/OL-99-01 (Including Completed & Graded Tests) for Tests Administered on 990405- 06.Exam Results:Both Candidates Failed Written Portion of Exams IR 05000128/19972011998-12-0808 December 1998 Insp Rept 50-128/97-201 on 971103-05 & 981102-05.No Significant Safety Issues Were Identified.Major Areas Inspected:Selected Conditions & Records Since Last Insp, Verification of C/As & Actions Re Reportable Occurences ML20154F5601998-09-18018 September 1998 NRC Operator Licensing Exam Rept 50-128/OL-98-02 (Including Completed & Graded Tests) for Retake Exam Administered on 980914 to One Reactor Operator Candidate.Candidate Passed Exam ML20217B2151997-09-0303 September 1997 NRC Operator Licensing Exam Rept 50-128/OL-97-02 Including Completed & Graded Tests for Tests Administered on 970825- 26.Exam Results:One RO & One SRO Passed Exam.Two ROs Failed Exam ML20198F9791997-08-11011 August 1997 Revised NOV from Insp on 970317-21.Violation Noted:Adequate Radiation Surveys Were Not Performed in Waste Storage Bldg to Ensure Licensee Complied W/Requirements of 10CFR20.1201, 10CFR20.1601 & 10CFR20.1902(b).NRC Comments Attached ML20148F1391997-05-29029 May 1997 Notice of Violation from Insp on 970317-21.Violation Noted: No Lectures Were Scheduled Between 951018 & 960714 & One or More Reactor Operators Did Not Attend Four Lectures That Were Part of Requalification Program in 1996 IR 05000128/19970011997-05-29029 May 1997 Insp Rept 50-128/97-01 on 970317-21.Violations Noted.Major Areas Inspected:Operations,Maintenance,Reactor Requalification,Reactor Safety Board Activities,Reactor Mods,Facility Mods & Plant Support ML20137L3411997-04-0101 April 1997 NRC Operator Licensing Retake Exam Rept 50-128/OL-97-01 on 970324.Applicant Passed Category B.Categories a & C Were Waived ML20135E9551996-12-0303 December 1996 NRC Operator Licensing Exam Rept 50-128/OL-96-02 Administered on 961119-21.Exam Results:Four Applicants Passed Exam & One Applicant Failed Exam ML20059G3171993-12-0909 December 1993 Exam Rept 50-128/OL-93-03 on Stated Date.Exam Results: Candidate Successfully Passed SRO Upgrade Exam ML20056C4571993-06-0707 June 1993 Exam Rept 50-128/OL-93-02 on 930518.Exam Results:Applicant Passed Both Written Exam & Operating Evaluation ML20035E9481993-04-0101 April 1993 Insp Rept 50-128/93-01 on 930315-16.No Violations Noted. Major Areas Inspected:Emergency Planning & Preparedness, Security Plans & Procedures & Reviews ML20034C1171990-04-17017 April 1990 Notice of Violation from Insp on 900221-23.Violation Noted: Licensee Transferred 80 Mci Na-24 to Company in Oct 1989 W/O Verifying Authorization for Possession of Matl ML20034C1211990-04-13013 April 1990 Insp Rept 50-128/90-02 on 900221-23.Violation & Deviation Noted.Major Areas Inspected:Radiation Protection Program IR 05000128/19900011990-02-21021 February 1990 Partially Withheld Insp Rept 50-128/90-01 on 900110-12 (Ref 10CFR2.790(d)).Violation Noted Re Failure to Test Personnel on Security Training.Major Areas Inspected:Organization & Mgt Controls,Experiments & Physical Security & Safeguards ML20151F0381988-07-13013 July 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $5,000.Violations Noted:Failure to Provide Experimenter Working in High Radiation Area Containing Mixed Gamma Neutron Radiation Field W/Monitoring Equipment ML20151G2471988-07-0808 July 1988 EN-88-058:on 880708,notice of Proposed Imposition of Civil Penalty in Amount of $5,000 Issued to Licensee Based on Failure to Provide Appropriate Personnel Dosimetry,Proper Placement of Personnel Dosimetry & Establish Proper Control IR 05000128/19880031988-05-25025 May 1988 Insp Rept 50-128/88-03 on 880411-12.Violation Noted.Major Areas Inspected:Licensee Radiation Protection Program, Radiological Surveys Including Independent Radiation Spectrum Measurements of Reactor Beam Port 1 IR 05000128/19880021988-04-28028 April 1988 Insp Rept 50-128/88-02 on 880405-07.No Violations or Deviations Noted.Major Areas Inspected:Review & Audit, Experiments,Procedures,Organization,Logs & Records,Plant Status,Requalification Program,Surveillance & Site Tour ML20148M5851988-03-30030 March 1988 Insp Rept 50-128/88-01 on 880307-09.Five Violations Noted. Major Areas Inspected:Licensee Radiation Protection, Emergency Planning,Nuclear Matl Safeguards & Physical Security Programs ML20212P5491987-03-11011 March 1987 Notice of Violation from Insp on 870112-14 ML20212K9471987-01-12012 January 1987 Enforcement Notification EN-86-057A:order Imposing Civil Penalty in Reduced Amount of $833 Issued Based on Util Justification for Withdrawal of One Violation Re 860501 Power Excursion & Trip PNO-IV-86-036, on 861218,three Student Workers Became Contaminated During Removal of Offgas from Recently Irradiated Br-82 Samples.Airborne Monitors Alarmed & Reactor Bldg Evacuated.Students Decontaminated1986-12-19019 December 1986 PNO-IV-86-036:on 861218,three Student Workers Became Contaminated During Removal of Offgas from Recently Irradiated Br-82 Samples.Airborne Monitors Alarmed & Reactor Bldg Evacuated.Students Decontaminated IR 05000128/19860021986-09-0303 September 1986 Insp Rept 50-128/86-02 on 860729-30.No Violation or Deviation Noted.Major Areas Inspected:Logs,Organization, Review & Audit Functions,Requalification Training, Procedures,Surveillance Activities & Experiments ML20211Q9921986-07-22022 July 1986 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,250.Violations Noted:Nonsecured Experiment Removed from Reactor Core Position B-5 While Reactor Operating ML20207H7781986-07-17017 July 1986 EN-86-057:on 860722,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,250 Will Be Issued to Licensee.Action Based on 860501 Power Excursion & Resultant Overpower Trip Event IR 05000128/19860011986-05-0909 May 1986 Reactive Insp Rept 50-128/86-01 on 860505.Violation Noted: Failure to Measure Reactivity Worth of Experiment Before Reactor Operation & to Rept Reactivity Greater than One Dollar Associated w/860310 Event PNO-IV-86-016, on 860501,test Sample Removed from Reactor, Causing Unanticipated Reactivity Addition in Excess of Tech Specs & Resulting in Reactor Scram on High Power on Both Safety Channels1986-05-0202 May 1986 PNO-IV-86-016:on 860501,test Sample Removed from Reactor, Causing Unanticipated Reactivity Addition in Excess of Tech Specs & Resulting in Reactor Scram on High Power on Both Safety Channels IR 05000128/19820021982-10-18018 October 1982 IE Insp Rept 50-128/82-02 on 820621-25.No Noncompliance Noted.Major Areas Inspected:Facility Operation,Organization, Reactor Safety Board Audits,Logs,Experiments,Maint Calibr of Test Equipment,Emergency Planning & Site Tour IR 05000128/19820011982-07-0606 July 1982 IE Insp Rept 50-128/82-01 on 820604.No Noncompliance Noted. Major Areas Inspected:Facts & Circumstances Re Reported Beta/Gamma Radiation Exposure of 180 Rem to Right Hand TLD for Reactor Operator.Max Exposure Approx 2.5 Rem PNO-IV-82-017, on 820518,dosimetry Vendor Informed That Finger Badge from Reactor Operator Read 180 Rem (Gamma).Work Performed by Operator in Late Apr 1982 Involved Handling of Activation Products in Reactor Bldg1982-05-19019 May 1982 PNO-IV-82-017:on 820518,dosimetry Vendor Informed That Finger Badge from Reactor Operator Read 180 Rem (Gamma).Work Performed by Operator in Late Apr 1982 Involved Handling of Activation Products in Reactor Bldg PNO-IV-81-020, on 810721 Release of Gaseous Fission Products Occurred During Irradiation of Chlorine Sample in Long Tube. Max Concentration Less than Tech Specs.No Overexposure or Contamination Occurred.Media Has Been Notified1981-07-22022 July 1981 PNO-IV-81-020:on 810721 Release of Gaseous Fission Products Occurred During Irradiation of Chlorine Sample in Long Tube. Max Concentration Less than Tech Specs.No Overexposure or Contamination Occurred.Media Has Been Notified PNO-IV-80-026, on 800821,irradiated Sample Container Exploded & Three Experimenters Suffered Small Cuts Which Were Successfully Decontaminated.Property Damage Was Minimal & Decontamination Is in Progress1980-08-21021 August 1980 PNO-IV-80-026:on 800821,irradiated Sample Container Exploded & Three Experimenters Suffered Small Cuts Which Were Successfully Decontaminated.Property Damage Was Minimal & Decontamination Is in Progress IR 05000128/19800021980-05-0808 May 1980 IE Insp Rept 50-128/80-02 on 800423-25.No Noncompliance Noted.Major Areas Inspected:Security Plan,Protection of SNM, Security Organization & Access Control.Details Withheld (Ref 10CFR2.790) IR 05000128/19800011980-04-0101 April 1980 IE Insp Rept 50-128/80-01 on 800304-06.Noncompliance Noted: Failure to Maintain Std Operating Procedures 1999-07-09 |
Text
.
U. S. NUCLEAR REGULATOPY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:
50-128/0L-97-01 FACILITY DOCKET NO.:
50-128 FACILITY LICENSE NO.:
R-83 FACILITY:
Texas A&M University EXAMINATION DATES:
March 24, 1997 EXAMINER:
Warr n J. Eresia, Chief Examiner SUBMITTED BY:
h
/%
'/ /
f7 Wirren J. Erysian, Chi.ef Exarniner Date
SUMMARY
The NRC administered a retake license examination to one Reactor Operator applicant.
The applicant passed the examination.
04070204 97o4o3 R
V ADOCK 05000128 PDR ATTACHMENT 1 l
4 >
REPORT DETAILS 1.
Examiners:
Warren J. Eresian, Chief Examiner 2.
Results:
l R0 SRO Total iPass/ Fail)
(Pass / Fail)
(Pass / Fail)
NRC Grading:
1/0 0/0 1/0
]
3.
Written Examination:
The applicant passed Category B.
Categories A and C were waived.
l 4.
Operating Test:
1
.The operating test was waived.
d w