ML17284A185
From kanterella
Revision as of 03:30, 26 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17284A185 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 10/05/2017 |
From: | Wolf Creek |
To: | Office of Nuclear Reactor Regulation |
References | |
RA 17-0110 | |
Download: ML17284A185 (1) | |
Similar Documents at Wolf Creek | |
---|---|
Category:- No Document Type Applies
MONTHYEARML22034A3952022-02-16016 February 2022
[Table view]Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML18044A1052018-02-0707 February 2018 Summary of Changes to One Procedure and One Form That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (Rerp). Includes Procedure AP 06-004, Rev. 8 & Form Epf 06-011-01, Rev. 5 ML17284A1852017-10-0505 October 2017 Attachment to RA 17-0110 - Summary of Changes to Two Procedures and Two Forms That Implement the Wolf Creek Generating Station Radiological Emergency Response Plan ML17060A1492017-02-10010 February 2017 FOIA/PA-2017-0110 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed. Part 3 of 6 ML17060A1462017-02-10010 February 2017 FOIA/PA-2017-0110 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 6 ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML14258B0892014-09-18018 September 2014 Public Notice, Notice of Consideration of Issuance of Amendment, Revise Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Completion Time Extension (Exigent Circumstances) ML13246A3712013-06-19019 June 2013 Ope Communication on Augmented Inspection - Wolf Creek Generating Station Loss of Offsite Power and Notification of Unusual Event ML13073A2052013-03-15015 March 2013 YT020130045 - Wolf Creek Generating Station - Enclosure - Preliminary Accident Sequence Precursor Analysis of January 2012 Loss of Offsite Power Event ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1013703072010-05-12012 May 2010 Proposed License Amendment Request Regarding Presure Boundary Designation for Pressurizer Power Operated Relief Valves ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0806704192008-03-0707 March 2008 CDBI Findings ML0804603992008-02-13013 February 2008 Power Reactor Inattentive Officer Findings 2004-Present ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0720000552007-07-17017 July 2007 License Renewal; USAR Information on Liquid, Gaseous, and Solid Radioactive Waste Management Systems ML0714501502007-05-0909 May 2007 Responses A39 - A45 and A48 - A50 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application ML0714501492007-05-0909 May 2007 Responses A11 - A19 and A23 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application ML0717704612007-02-0606 February 2007 Procedure AP 05F-001, Rev. 3, Design Verification. ML0634705992006-12-14014 December 2006 Plant Service List ML0717704602006-07-12012 July 2006 Procedure AP 05-005, Rev. 11A, Design, Implementation & Configuration Control of Modifications. ML0607502682006-03-10010 March 2006 Protection of Safe Shutdown Capabilities ML0606902752006-03-0303 March 2006 Plant Engineering Branch Open Items, Interim Safety Basis ML0606902792006-02-28028 February 2006 Revised Oversight Process - Item List Report ML0606902892005-10-31031 October 2005 PIR 20052757 Information ML0505404692004-02-10010 February 2004 Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0329401042003-10-0707 October 2003 Riv Backfit Status ML0606902772003-05-30030 May 2003 Sp - 10 CFR-50 Appendix R - Fire Protection of Safe Shutdown Capability ML0329400982003-03-27027 March 2003 Riv Backfit Status 2022-02-16 |
Retrieved from "https://kanterella.com/w/index.php?title=ML17284A185&oldid=355785"