1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2)
ML22340A169
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/30/2022
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22340A137 List: ... further results
References
AEP-NRC-2022-62
Download: ML22340A169 (1)


Text

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-1 UCR-2138, Rev. 0 Unit: 2

Title:

Steam Concentration in a V ertical Distrib u tion Channel

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-2 UCR-2138, Rev. 0 Unit: 2

Title:

D. C. Cook Unit 2 BELOCA Analysis Axial Power Shape Operating Space Envelope

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-3 UCR-2138, Rev. 0 Unit: 2

Title:

Upper Com partm ent Com pression Pressu re versu s Energy Release f or Tests at 110% and 200% of Initial DBA Blowd own Rate

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-4 Unit: 2 UCR-2138, Rev. 0

Title:

Ice Melted vs. Energy Release f or Tests at Dif f erent Blowd own Rates

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-5 Unit: 2 UCR-2138, Rev. 0

Title:

Upper Com partm ent P eak C om pression P ressure versus B low dow n Rate for Tests w ith 18 5 % E nergy Release

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-6 UCR-2147, Rev. 0 Unit: 2

Title:

LOCA Containment Integrity Containment Pressure

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Note 1: This peak pressure is increased by 0.27 psi as described in Section 14.3.4.1.3.1.3.

The peak composite pressure is 11.43 psig.

Change

Description:

UFSAR Figure: 14.3.4-6A UCR-2147, Rev. 0 Unit: 2

Title:

LOCA Containment Integrity (Composite) Containment Pressure

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-7 UCR-2147, Rev. 0 Unit: 2

Title:

LOCA Containment Integrity Upper Compartment Temperature

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Note 1: Peak Temperature = 232.2°F.

Change

Description:

UFSAR Figure: 14.3.4-8 UCR-2147, Rev. 0 Unit: 2

Title:

LOCA Containment Integrity Lower Compartment Temperature

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-9 UCR-2147, Rev. 0 Unit: 2

Title:

LOCA Containment Integrity Containment Sump Temperature Transient

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-10 UCR-2147, Rev. 0 Unit: 2

Title:

LOCA Containment Integrity Ice Melt Transient

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-11A Unit: 2 UCR-2138, Rev. 0

Title:

102% of 3588 MWt Core Power, 1.4 sq. ft. Double Ended Rupture - MSIV Failure Upper Compartment Temperature

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-11B Unit: 2 UCR-2138, Rev. 0

Title:

102% of 3588 M Wt Core Power, 1.4 sq . f t. Dou b le End ed Ru ptu re - MSIV Failu re Lower Com partm ent Tem peratu re

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-12A Unit: 2 UCR-2138, Rev. 0

Title:

102% of 3588 M Wt Core Power, 0.86 s q . f t. Split Break - AFWRP Failu re Upper Com partm ent Tem peratu re

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 27.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Change

Description:

UFSAR Figure: 14.3.4-12B Unit: 2 UCR-2138, Rev. 0

Title:

102% of 3588 M Wt Core Power, 0.86 s q . f t. Split Break - AFWRP Failu re Lower Com partm ent Tem peratu re

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 July 1992 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UFSAR Figure: 14.3.4-13 Unit 2 UCR-2185, Rev. 0

Title:

Worst Break-Lower Compartment Temperature Comparison

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 July 1992 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UFSAR Figure: 14.3.4-14 Unit 2 UCR-2185, Rev. 0

Title:

Upper Compartment Temperature (30% Power Level)

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 July 1992 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UFSAR Figure: 14.3.4-15 Unit 2 UCR-2185, Rev. 0

Title:

Lower Compartment Pressure (30% Power Level)

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 July 1992 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UFSAR Figure: 14.3.4-16 Unit 2 UCR-2185, Rev. 0

Title:

Lower Compartment Pressure (30% Power Level)

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 July 1992 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UFSAR Figure: 14.3.4-17 Unit 2 UCR-2185, Rev. 0

Title:

Worst Break-Lower Compartment Temperature Comparison Generic Analysis

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-18 Unit 2 UCR-2185, Rev. 0

Title:

Cook Unit 1 & 2 TMD Model Plan at Equipment Rooms Elevation

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-19 Unit 2 UCR-2185, Rev. 0

Title:

Cook Unit 1 & 2 TMD Model Containment View

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-20 Unit 2 UCR-2185, Rev. 0

Title:

Cook Unit 1 & 2 Plan View at Ice Condenser Elevation Ice Condenser Compartments

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-21 Unit 2 UCR-2185, Rev. 0

Title:

Cook Unit 1 & 2 TMD Model Layout of Containment Shell

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-22 Unit 2 UCR-2185, Rev. 0

Title:

Steam Generator Enclosure Above Elevation 665 ft.

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-23 Unit 2 UCR-2186, Rev. 0

Title:

Steam Generator Enclosure Above Elevation 665 ft.

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-24 Unit 2 UCR-2186, Rev. 0

Title:

Steam Generator Enclosure Cut-Open View of the Steam Generator Enclosure

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 2 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-25 Unit 2 UCR-2186, Rev. 0

Title:

Schematic of the Cook Unit 1 & 2 9 Node TMD Steam Generator Enclosure Model

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 2 of 2 Change

Description:

UFSAR Figure: 14.3.4-25 Unit 2 UCR-2186, Rev. 0

Title:

Schematic of the Cook Unit 1 & 2 9 Node TMD Steam Generator Enclosure Model

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-26 Unit 2 UCR-2186, Rev. 0

Title:

Cook Unit 1 & 2 Pressurizer Enclosure TMD Model Noding Network

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-27 Unit 2 UCR-2186, Rev. 0

Title:

Cook Unit 1 & 2 TMD Model with Pressurizer Enclosure Nodalization Network

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-28 Unit 2 UCR-2186, Rev. 0

Title:

Cook Unit 1 & 2 Fan / Accumulator Room TMD Model Plan at Equipment Rooms Elevation

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-29 Unit 2 UCR-2186, Rev. 0

Title:

Cook Unit 1 & 2 Fan / Accumulator Room TMD Model Layout of Containment Shell

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-30 Unit 2 UCR-2186, Rev. 0

Title:

Cook Unit 1 & 2 TMD Model with Fan / Accumulator Room Nodalization Network

UFSAR Revision 31.0 INDIANA AND MICHIGAN POWER Revised: 28.0 D. C. COOK NUCLEAR PLANT Chapter: 14 UPDATED FINAL SAFETY ANALYSIS REPORT Sheet: 1 of 1 Added to Unit 2 by UCR-2138, Rev. 0 Change

Description:

UCR-850, Rev. 17.1 Change

Description:

UFSAR Figure: 14.3.4-31 Unit 2 UCR-2186, Rev. 0

Title:

Cook Unit 1 & 2 Loop Subcompartment TMD Model Nodalization Network

UFSAR Revision 31.0 38 51 52 53 3

46 4

Thru 37 2

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Reactor Cavity Subcompartment TMD Model COOK NUCLEAR PLANT Containment Section View NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-32 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 33 11 9 14 30 34 5 10 15 19 35 6 11 16 22 24 26 28 31 3 20 44 45 1 39 40 41 42 43 44 Break 36 7 12 17 Location 32 21 23 25 27 29 37 8 13 18 338 293 270 247 224.5 202 158 113 67 22 338 Circumference (Degrees)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Reactor Cavity Subcompartment TMD Model COOK NUCLEAR PLANT Layout of Reactor Vessel Annulus Elements NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-33 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 28 29 43 26 27 52 42 24 25 41 22 23 55 40 19 20 21 48 59 38 54 39 2 14 15 16 17 18 47 9 10 11 12 13 62 53 1 3 61 4 5 6 7 8 51 46 58 60 50 33 34 35 36 37 57 45 49 30 31 32 56 44 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Reactor Cavity Subcompartment TMD Model COOK NUCLEAR PLANT Nodalization Network NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-34 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure Steam Line Break NUCLEAR GENERATION GROUP ( P55-25 )

BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-35 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P56-25 )

UFSAR Figure: 14.3.4-36 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P57-25 )

UFSAR Figure: 14.3.4-37 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P58-25 )

UFSAR Figure: 14.3.4-38 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P59-25 )

UFSAR Figure: 14.3.4-39 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P60-25 )

UFSAR Figure: 14.3.4-40 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P61-25 )

UFSAR Figure: 14.3.4-41 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P62-25 )

UFSAR Figure: 14.3.4-42 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This Figure is representative and should not be used as input in other analyses.

Revision: 19.3 Change

Description:

UCR-1748

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P63-25 )

UFSAR Figure: 14.3.4-43 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P55-46 )

UFSAR Figure: 14.3.4-44 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P56-47 )

UFSAR Figure: 14.3.4-45 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P57-48 )

UFSAR Figure: 14.3.4-46 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P60-51 )

UFSAR Figure: 14.3.4-47 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P61-52 )

UFSAR Figure: 14.3.4-48 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P56-58 )

UFSAR Figure: 14.3.4-49 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P57-59 )

UFSAR Figure: 14.3.4-50 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P60-62 )

UFSAR Figure: 14.3.4-51 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Steam Line Break BRIDGMAN, MICHIGAN ( P61-63 )

UFSAR Figure: 14.3.4-52 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P55-25 )

UFSAR Figure: 14.3.4-53 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P56-25 )

UFSAR Figure: 14.3.4-54 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P57-25 )

UFSAR Figure: 14.3.4-55 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P58-25 )

UFSAR Figure: 14.3.4-56 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P59-25 )

UFSAR Figure: 14.3.4-57 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P60-25 )

UFSAR Figure: 14.3.4-58 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P61-25 )

UFSAR Figure: 14.3.4-59 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P62-25 )

UFSAR Figure: 14.3.4-60 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P63-25 )

UFSAR Figure: 14.3.4-61 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P55-46 )

UFSAR Figure: 14.3.4-62 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P56-47 )

UFSAR Figure: 14.3.4-63 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P57-48 )

UFSAR Figure: 14.3.4-64 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P60-51 )

UFSAR Figure: 14.3.4-65 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P61-52 )

UFSAR Figure: 14.3.4-66 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P56-58 )

UFSAR Figure: 14.3.4-67 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P57-59 )

UFSAR Figure: 14.3.4-68 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure NUCLEAR GENERATION GROUP Feedwater Line Break BRIDGMAN, MICHIGAN ( P60-62 )

UFSAR Figure: 14.3.4-69 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT Steam Generator Enclosure Feedwater Line Break NUCLEAR GENERATION GROUP ( P61-63 )

BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-70 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this curve, the pressure time history should be increased by 10%.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT Upper Compartment Element 25 NUCLEAR GENERATION GROUP Spray Line Break BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-71 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this curve, the pressure time history should be increased by 10%.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT Pressurizer Enclosure Element 46 NUCLEAR GENERATION GROUP Spray Line Break BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-72 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this curve, the pressure time history should be increased by 10%.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT Pressurizer Enclosure Element 47 NUCLEAR GENERATION GROUP Spray Line Break BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-73 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this curve, the pressure time history should be increased by 10%.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressurizer Time History COOK NUCLEAR PLANT Pressurizer Enclosure Element 48 NUCLEAR GENERATION GROUP Spray Line Break BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-74 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this curve, the pressure time history should be increased by 10%.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT Pressurizer Enclosure Element 49 NUCLEAR GENERATION GROUP Spray Line Break BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-75 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 27 - 29 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-76 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements : 27 - 42 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-77 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 54 - 42 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-78 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 54 - 41 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-79 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 55 -41 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-80 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 56 - 41 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-81 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 56 - 40 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-82 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 57 - 40 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-83 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 57 - 25 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-84 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 27 - 28 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-85 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 54 - 28 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-86 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 55 - 28 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-87 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 55 - 26 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-88 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 56 - 26 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-89 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 57 - 26 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-90 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 27 - 3 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-91 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 54 - 2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-92 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 54 - 3 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-93 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 55 - 2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-94 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 56 - 2 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-95 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 56 - 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-96 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Differential Pressure Between Elements: 57 - 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-97 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Fan / Accumulator Room Element 27 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-98 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Fan / Accumulator Room Element 54 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-99 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Fan / Accumulator Room Element 55 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-100 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Fan / Accumulator Room Element 56 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-101 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Fan / Accumulator Room Element 57 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-102 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 1 for a DEHL Break COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-103 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 2 for a DEHL Break COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-104 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 3 for a DEHL Break COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-105 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 4 for a DEHL Break COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-106 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 5 for a DEHL Break COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-107 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 6 for a DEHL Break COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-108 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 25 for a DEHL COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Break in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-109 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 40 for a DEHL COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Break in Element 1 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-110 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time Element 2 for DEHL Break in COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Element 2 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-111 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Plot of the Peak Compartment Pressure as a AMERICAN ELECTRIC POWER Function of Time in Element 25 for a DEHL COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Break in Element 2 BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-112 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Plot of the Peak Compartment Pressure as a COOK NUCLEAR PLANT Function of Time in Element 40 for a DECL NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN Break in Element 1 UFSAR Figure: 14.3.4-113 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be increased by an adder of 1.936.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History in the Lower COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Compartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-114 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be increased by an adder of 1.936.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History in the Upper COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Compartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-115 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be first increased by a factor 1.087 psi and then an adder of 0.75 psi included.)

Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Pressure Time History in the Lower NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN Compartment UFSAR Figure: 14.3.4-116 Sheet 1 of 1 Unit 2 Unit 2 Unit 1 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be first increased by a factor 1.087 psi and then an adder of 0.75 psi included.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History in the Upper COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Compartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-117 Sheet 1 of 1 Unit 2 Unit 2 Unit 1 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be first increased by a factor 1.013 psi and then an adder of 0.9426 psi included.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History in the Ice Condenser COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Compartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-118 Sheet 1 of 1 Unit 1

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be first increased by a factor 1.013 psi and then an adder of 0.9426 psi included.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History in the Upper COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Compartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-119 Sheet 1 of 1 Unit 1

UFSAR Revision 31.0 (When using this figure for the differential pressure time history, it should be first increased by a factor 1.06 psi and then an adder of 0.866 psi included.)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History in the Lower Plenum of COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP the Ice Condenser BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-120 Sheet 1 of 1 Unit 2 Unit 2 Unit 1 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be increased by a factor 1.15 psi .)

Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History in the Lower Plenum of COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP the Ice Condenser BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-121 Sheet 1 of 1 Unit 1

UFSAR Revision 31.0 (When using this figure, the differential pressure time history should be increased by a factor 1.15 psi .)

Revision: 17.1 Change

Description:

UCR-850 AMERICAN ELECTRIC POWER

Title:

Cook Unit 1 & 2 COOK NUCLEAR PLANT Pressure Time History in the Fan / Accumulator Room NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-122 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-123 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-124 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-125 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-126 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-127 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-128 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-129 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-130 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-131 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 This figure is not updated because it is considered as a representative for the TMD analysis.

UCR-1923 provides details for minor increase (1.6928%) in operating deck accident pressure.

Revision: 22.1 Change

Description:

UCR-1923

Title:

Cook Unit 1 & 2 AMERICAN ELECTRIC POWER Differential Pressure Time History COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Reactor Cavity Subcompartment BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-132 Sheet 1 of 1 UNIT 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Hot Leg Double Ended Guillotine Full Power mh AMERICAN ELECTRIC POWER Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-133 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Hot Leg Double Ended Guillotine Full Power m AMERICAN ELECTRIC POWER Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-134 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cold Leg Double Ended Guillotine Full Power AMERICAN ELECTRIC POWER Condition mh Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-135 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cold Leg Double Ended Guillotine Full Power AMERICAN ELECTRIC POWER Condition m Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-136 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Hot Leg Single Ended Split Full Power Condition AMERICAN ELECTRIC POWER mh Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-137 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Hot Leg Single Ended Split Full Power Condition AMERICAN ELECTRIC POWER m Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-138 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cold Leg Single Ended Split Full Power mh AMERICAN ELECTRIC POWER Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-139 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Cold Leg Single Ended Split Full Power m AMERICAN ELECTRIC POWER Transient COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-140 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Pressurizer Spray Line mh Transient AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-141 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Pressurizer Spray Line m Transient AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-142 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Comparison of Satan (Zaloudek-Moody) to AMERICAN ELECTRIC POWER Henry-Fauske COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-143 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Comparison of Satan (Zaloudek) to Moody AMERICAN ELECTRIC POWER Subcooled COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-144 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Zaloudek Measured Data versus Modified AMERICAN ELECTRIC POWER Zaloudek Corp.

COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-145 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Zaloudek Short Tube Data AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-146 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Exit Plane Quality as a Function of Upstream AMERICAN ELECTRIC POWER Pressure for Saturated Liquid (Moody Model)

COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-147 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Henry ANL 7740 Data AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-148 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Loft Tests 809 and 813 Pressure Gage P-1 AMERICAN ELECTRIC POWER (Near Rupture)

COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-149 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Full-Scale Section Test Facility AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-150 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Discharge Piping Circulation Pump AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-151 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Receiver Vessel AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-152 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Instrument Location AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-153 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Variable Area Flow Path AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-154 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Illustration of Choked Flow Characteristics AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-155 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 A summary of experimental, two-phase, choking flow studies Revision: 17.1 Change

Description:

UCR-850

Title:

Experimental Critical Mass Flow / Homogeneous AMERICAN ELECTRIC POWER Thermal Equilibrium Mode COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-156 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0 Revision: 17.1 Change

Description:

UCR-850

Title:

Upper and Lower Compartment Pressure AMERICAN ELECTRIC POWER Transient for Worst Case Break Compartment COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP (Element 6) Having a DEHL Break (Historical)

BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-157 Sheet 1 of 1 Unit 1 Unit 2 Added to Unit 2 by UCR-2138, Rev. 0 l

UFSAR Revision 31.0

  • Full flow area is defined as door port area at maximum door opening Revision: 17.1 Change

Description:

UCR-850

Title:

Flow Area - Pressure Differential AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN UFSAR Figure: 14.3.4-158 Sheet 1 of 1 Unit 2 Unit 2 Unit 1 Added to Unit 2 by UCR-2138, Rev. 0 l