Category:Letter type:WBL
MONTHYEARWBL-24-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC)2024-01-30030 January 2024 Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC) WBL-23-058, Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency2023-12-19019 December 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency WBL-23-055, of the Unit 2 Cycle 6 Core Operating Limits Report2023-11-22022 November 2023 of the Unit 2 Cycle 6 Core Operating Limits Report WBL-23-051, Response to an Apparent Violation (EA-23-117); NRC Special Inspection Report 50-390, 391/2023440, Preliminary Greater than Green and Apparent Violation2023-11-22022 November 2023 Response to an Apparent Violation (EA-23-117); NRC Special Inspection Report 50-390, 391/2023440, Preliminary Greater than Green and Apparent Violation WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual WBL-23-045, 10 CFR 50.59 Summary Report2023-11-0707 November 2023 10 CFR 50.59 Summary Report WBL-23-038, American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 18 Operation2023-08-0707 August 2023 American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owners Activity Report for Cycle 18 Operation WBL-23-033, Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic2023-07-13013 July 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic WBL-23-026, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2023-01 - Preparation and Scheduling of Operator Licensing Examinations2023-05-18018 May 2023 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2023-01 - Preparation and Scheduling of Operator Licensing Examinations WBL-23-021, 2022 Annual Radiological Environmental Operating Report2023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report WBL-23-025, Emergency Plan Implementing Procedure Revision2023-05-0505 May 2023 Emergency Plan Implementing Procedure Revision WBL-23-020, Annual Non-Radiological Environmental Operating Report - 20222023-05-0404 May 2023 Annual Non-Radiological Environmental Operating Report - 2022 WBL-23-023, of Cycle 19 Core Operating Limit Report2023-04-27027 April 2023 of Cycle 19 Core Operating Limit Report WBL-23-019, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report WBL-23-018, Revised Pressure and Temperature Limits Report (PTLR)2023-04-10010 April 2023 Revised Pressure and Temperature Limits Report (PTLR) WBL-23-013, 10 CFR 50.46 Annual Report for 20222023-03-29029 March 2023 10 CFR 50.46 Annual Report for 2022 WBL-23-015, Emergency Plan Implementing Procedure Revision2023-03-21021 March 2023 Emergency Plan Implementing Procedure Revision WBL-23-010, Emergency Plan Implementing Procedure Revisions2023-02-0909 February 2023 Emergency Plan Implementing Procedure Revisions WBL-23-008, Unit 1 Revision 1 of the Cycle 18 Core Operating Limits Report (COLR) and Units 2 Revision 1 of the Cycle 5 Core Operating Limits Report (COLR)2023-02-0707 February 2023 Unit 1 Revision 1 of the Cycle 18 Core Operating Limits Report (COLR) and Units 2 Revision 1 of the Cycle 5 Core Operating Limits Report (COLR) WBL-23-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery2023-01-12012 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery WBL-23-001, Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic2023-01-10010 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic WBL-22-068, Submittal of Emergency Plan Implementing Procedure Revision2022-12-12012 December 2022 Submittal of Emergency Plan Implementing Procedure Revision WBL-22-062, Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies2022-11-0101 November 2022 Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC) WBL-22-057, American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 Operation2022-09-26026 September 2022 American Society of Mechanical Engineers, Section XI, First 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 4 Operation WBL-22-046, Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2)2022-09-0808 September 2022 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) WBL-22-034, Update to Fire Protection Report Figures Redacted2022-08-0101 August 2022 Update to Fire Protection Report Figures Redacted WBL-22-037, Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies2022-07-14014 July 2022 Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies WBL-22-032, Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 42022-06-0101 June 2022 Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 4 WBL-22-033, Emergency Plan Implementing Procedure Revisions2022-06-0101 June 2022 Emergency Plan Implementing Procedure Revisions WBL-22-030, Emergency Plan Implementing Procedure Revision2022-05-18018 May 2022 Emergency Plan Implementing Procedure Revision WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual WBL-22-015, Update to Fire Protection Report2022-05-11011 May 2022 Update to Fire Protection Report WBL-22-021, Unit 2 - 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 Unit 2 - 2021 Annual Radiological Environmental Operating Report WBL-22-028, of the Unit 2 Cycle 5 Core Operating Limits Report (COLR)2022-05-0404 May 2022 of the Unit 2 Cycle 5 Core Operating Limits Report (COLR) WBL-22-019, Annual Radioactive Effluent Release Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report WBL-22-024, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 292022-04-27027 April 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 29 WBL-22-008, 10 CFR 50.59 Summary Report2022-04-27027 April 2022 10 CFR 50.59 Summary Report WBL-22-020, Annual Non-Radiological Environmental Operating Report - 20212022-04-27027 April 2022 Annual Non-Radiological Environmental Operating Report - 2021 WBL-22-018, Cycle F214 Steam Generator Tube Inspection Report2022-03-28028 March 2022 Cycle F214 Steam Generator Tube Inspection Report WBL-22-017, Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2022-03-22022 March 2022 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report WBL-22-016, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2022-01 - Preparation and Scheduling of Operator Licensing Examinations2022-03-17017 March 2022 Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2022-01 - Preparation and Scheduling of Operator Licensing Examinations WBL-22-009, Submittal of Initial Operator Licensing Outline2022-03-10010 March 2022 Submittal of Initial Operator Licensing Outline WBL-22-006, American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 17 Operation2022-03-0404 March 2022 American Society of Mechanical Engineers, Section XI, Third 10-Year Inservice Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 17 Operation WBL-22-012, Submittal of 10 CFR 50.46 - Annual Report for Watts Bar Nuclear Plant Units 1 and 22022-03-0202 March 2022 Submittal of 10 CFR 50.46 - Annual Report for Watts Bar Nuclear Plant Units 1 and 2 WBL-22-010, Response to Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report2022-03-0202 March 2022 Response to Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report WBL-22-007, Unit 2 - Emergency Plan Implementing Procedure Revision2022-02-17017 February 2022 Unit 2 - Emergency Plan Implementing Procedure Revision WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report2021-12-16016 December 2021 Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report WBL-21-056, Revised Pressure and Temperature Limits Report (PTLR)2021-12-0909 December 2021 Revised Pressure and Temperature Limits Report (PTLR) 2024-01-30
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARCNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-060, Response to Request for Additional Information and Clarification Regarding Request for Exemption from Requirements of 10 CFR 26.205(d)(4), 26.205(d)(6) and 26.205(d)(7), Fitness for Duty Programs - Work Hours2022-04-25025 April 2022 Response to Request for Additional Information and Clarification Regarding Request for Exemption from Requirements of 10 CFR 26.205(d)(4), 26.205(d)(6) and 26.205(d)(7), Fitness for Duty Programs - Work Hours WBL-22-010, Response to Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report2022-03-0202 March 2022 Response to Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report CNL-21-098, Supplement to Response to Request for Additional Information Regarding Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Operating License Condition 2.C.(4)2022-01-0505 January 2022 Supplement to Response to Request for Additional Information Regarding Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Operating License Condition 2.C.(4) CNL-21-075, Response to Request for Additional Information Regarding Expedited Application to Modify Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening2021-09-0808 September 2021 Response to Request for Additional Information Regarding Expedited Application to Modify Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening CNL-21-070, Response to Request for Additional Information Regarding Application to Modify Watts Bar Nuclear Plant, Unit 2 Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 22021-08-11011 August 2021 Response to Request for Additional Information Regarding Application to Modify Watts Bar Nuclear Plant, Unit 2 Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C CNL-21-043, Response to Request for Additional Information Regarding Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the Watts Bar Nuclear Plant2021-05-14014 May 2021 Response to Request for Additional Information Regarding Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the Watts Bar Nuclear Plant CNL-21-041, Response to RAI Re Application to Modify the Watts Bar Nuclear Plant Technical Specifications 5.7.2.19, Containment Leakage Rate Testing Program (WBN-TS-19-01)2021-04-29029 April 2021 Response to RAI Re Application to Modify the Watts Bar Nuclear Plant Technical Specifications 5.7.2.19, Containment Leakage Rate Testing Program (WBN-TS-19-01) CNL-21-021, Response to Request for Additional Information Regarding Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, .2021-03-30030 March 2021 Response to Request for Additional Information Regarding Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, . CNL-21-005, Response to Request for Additional Info Re License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition & Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07)2021-01-22022 January 2021 Response to Request for Additional Info Re License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition & Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) CNL-21-014, Response to Request for Additional Information for Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for the Watts Bar Nuclear Plant, Unit 2 Steam Generators (WBN TS-391-20-024)2021-01-19019 January 2021 Response to Request for Additional Information for Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for the Watts Bar Nuclear Plant, Unit 2 Steam Generators (WBN TS-391-20-024) CNL-20-074, Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-08-28028 August 2020 Submittal of Additional Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-20-030, Response to Request for Additional Information to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-04-29029 April 2020 Response to Request for Additional Information to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-19-124, Response to Request for Additional Information to Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (W2020-01-13013 January 2020 Response to Request for Additional Information to Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN CNL-19-108, Response to NRC Second Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-10-28028 October 2019 Response to NRC Second Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) CNL-19-062, Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-09-0404 September 2019 Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) CNL-19-069, Final Response to NRC Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Application to Adopt 10 CFR 50.69,Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Pow2019-07-29029 July 2019 Final Response to NRC Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Application to Adopt 10 CFR 50.69,Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power CNL-19-068, Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for2019-07-22022 July 2019 Response to Request for Additional Information Regarding the Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for .. CNL-19-065, Partial Response to NRC Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2019-07-15015 July 2019 Partial Response to NRC Request for Additional Information Regarding Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors CNL-19-056, Response to NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602019-06-0707 June 2019 Response to NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 CNL-19-033, Revised Response to Request for Additional Information Regarding Application to Modify Technical Specifications 3.8.9 Regarding Alternating Current (AC) Vital Buses (WBN-TS-17-19)2019-03-21021 March 2019 Revised Response to Request for Additional Information Regarding Application to Modify Technical Specifications 3.8.9 Regarding Alternating Current (AC) Vital Buses (WBN-TS-17-19) CNL-18-121, Response to Request for Additional Information Regarding Application to Modify Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications 3.8.9 Regarding Alternating Current (AC) Vital Buses (WBN-TS-17-19)2018-11-0909 November 2018 Response to Request for Additional Information Regarding Application to Modify Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications 3.8.9 Regarding Alternating Current (AC) Vital Buses (WBN-TS-17-19) CNL-18-128, Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Use of Voltage-Based Alternate Repair Criteria in Accordance with Generic Letter 95-05 (391-WBN2-TS-17-30)2018-11-0808 November 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Use of Voltage-Based Alternate Repair Criteria in Accordance with Generic Letter 95-05 (391-WBN2-TS-17-30) CNL-18-116, Response to Request for Additional Information Regarding the Application to Revise Watts Bar Nuclear Plant Unit 2 - License Condition 2.C(4) PAD4TCD (391-WBN-TS-18-03)2018-10-11011 October 2018 Response to Request for Additional Information Regarding the Application to Revise Watts Bar Nuclear Plant Unit 2 - License Condition 2.C(4) PAD4TCD (391-WBN-TS-18-03) CNL-18-113, Response to Request for Additional Information Regarding Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) .2018-10-0404 October 2018 Response to Request for Additional Information Regarding Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) ... CNL-18-104, Submittal of Revised Response to Request for Additional Information Regarding Application to Modify Plant Technical Specifications to Extend Surveillance Requirements 3.3.1.5, 3.3.2.2 and 3.3.6.2 Specified Intervals2018-07-30030 July 2018 Submittal of Revised Response to Request for Additional Information Regarding Application to Modify Plant Technical Specifications to Extend Surveillance Requirements 3.3.1.5, 3.3.2.2 and 3.3.6.2 Specified Intervals CNL-18-102, Response to Request for Additional Information Regarding Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications to Extend Surveillance Requirement 3.3.1.5, 3.3.2.2, and 3.3.6.2 Specified ...2018-07-24024 July 2018 Response to Request for Additional Information Regarding Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications to Extend Surveillance Requirement 3.3.1.5, 3.3.2.2, and 3.3.6.2 Specified ... ML18155A4872018-06-0404 June 2018 Response to Request for Additional Information Regarding Cycle 1 Steam Generator Tube Inspection Report CNL-18-061, Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-31031 May 2018 Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools CNL-18-058, Supplement to Application to Revise Watts Bar Nuclear Plant Unit 2 - License Condition 2.C(4) PAD4TCD (391-WBN-TS-18-03)2018-04-27027 April 2018 Supplement to Application to Revise Watts Bar Nuclear Plant Unit 2 - License Condition 2.C(4) PAD4TCD (391-WBN-TS-18-03) NL-18-044, Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Pre2018-04-19019 April 2018 Browns Ferry Units 1, 2, and 3; Sequoyah Units 1 and 2; Watts Bar Units 1 and 2 - Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Prec CNL-18-044, Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation.2018-04-19019 April 2018 Tennessee Valley Authority Response to NRC Request for Additional Information Related to Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation. CNL-18-018, Supplement to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)2018-02-15015 February 2018 Supplement to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) CNL-18-012, Response to Request for Additional Information and Revision 1 to Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-17017 January 2018 Response to Request for Additional Information and Revision 1 to Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) CNL-17-108, Response to Request for Additional Information Regarding Request to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation2017-08-31031 August 2017 Response to Request for Additional Information Regarding Request to Modify Technical Specification 3.3.1, Reactor Protection System Instrumentation CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-27027 July 2017 Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-093, Revised Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (ABGTS)2017-07-21021 July 2017 Revised Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (ABGTS) CNL-17-091, Response to Request for Additional Information Regarding Request for Approval of a Relief from the ASME Section XI Coverage Examinations for Preservice Inspection (PSI) - Number WBN-2/PSI-1, Revision 1, and Submittal of the Wbn..2017-07-14014 July 2017 Response to Request for Additional Information Regarding Request for Approval of a Relief from the ASME Section XI Coverage Examinations for Preservice Inspection (PSI) - Number WBN-2/PSI-1, Revision 1, and Submittal of the Wbn.. CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels2017-07-0707 July 2017 Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels CNL-17-071, Seismic Probabilistic Risk Assessment, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2017-06-30030 June 2017 Seismic Probabilistic Risk Assessment, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident CNL-17-066, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of Technical Specification Surveillance Requirements Group 2 (LAR Encl. 1 Attachments 5, 6, 7, 9, 12, 13, 14, 15, 16, and 17)2017-06-0909 June 2017 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of Technical Specification Surveillance Requirements Group 2 (LAR Encl. 1 Attachments 5, 6, 7, 9, 12, 13, 14, 15, 16, and 17) CNL-17-062, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications Regarding Ice Condenser Containment Ice Mass Requirements2017-05-19019 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications Regarding Ice Condenser Containment Ice Mass Requirements CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-17-039, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory..2017-03-10010 March 2017 Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident - Withdrawal of Regulatory.. CNL-17-029, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC Sources2017-03-0606 March 2017 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC Sources CNL-17-020, Response to RAI Regarding License Amendment Request for One-Time Extension of Technical Specification Surveillance Requirements Group 1 - LAR Attachments 8, 10, and 112017-02-16016 February 2017 Response to RAI Regarding License Amendment Request for One-Time Extension of Technical Specification Surveillance Requirements Group 1 - LAR Attachments 8, 10, and 11 2023-01-04
[Table view] |