|
---|
Category:Annual Operating Report
[Table view] Category:Letter
MONTHYEARML23277A1692023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ABWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML20269A1842020-09-25025 September 2020 ABWR Design Certification Annual 10 CFR 50.46 Report for 2020 ML20076D9632020-03-16016 March 2020 GE Hitachi Nuclear Energy, Transmittal of ABWR Standard Plant Design Certification Renewal Application Design Control Document Revision 7, Chapter 5 ML20129J8972019-10-31031 October 2019 ABWR DC Renewal Supplemental FSER Appendix E Report by Advisory Committee on Reactor Safeguards ML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19171A2912019-06-27027 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18b for Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis ML19164A0352019-06-20020 June 2019 Letter to Applicant - GEH ABWR DC Renewal Section 1 Introduction and General Discussion ML19113A1732019-06-19019 June 2019 ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 ML19148A7802019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 ML19162A0802019-06-19019 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers ML19114A3532019-06-19019 June 2019 ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 ML19148A4632019-06-19019 June 2019 ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 ML19155A2102019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 38 Section 6.3 Emergency Core Cooling Systems ML19156A1802019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 19 & 20 for Section 9.1.2.1 New and Spent Fuel Storage ML19156A1512019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18a for Section 4.2 Rx LOCA and Seismic Load ML19148A4612019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications ML19141A3712019-06-0606 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes ML19148A5152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System ML19148A5932019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7.1.1.10 Aciwa ML19148A7782019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel ML19114A3512019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 ML19114A3382019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 ML19113A1762019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 ML19149A3152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation ML19142A1862019-05-31031 May 2019 GE Hitachi Nuclear Energy U. S. Advanced Boiling Water Reactor Design Certification Renewal Schedule Letter, May 2019 ML18234A4312019-02-0404 February 2019 Letter Safety Evaluation with No Open Items GEH ABWR DC Renewal Subsection 6.2.1.6 ML18164A1092019-02-0404 February 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 6.2.1 ML19002A3912019-01-15015 January 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18346A5612018-12-19019 December 2018 Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18275A1772018-11-15015 November 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 19.5 ML18200A3192018-07-26026 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 3.7.3 ML18183A3712018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.1 ML18183A4322018-07-12012 July 2018 Advanced Boiling-Water Reactor Design Certification Renewal Application - Safety Evaluation with No Open Items for Section 9.1.4, Light Load Handling System ML18183A4172018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.5 ML18176A1442018-06-28028 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 13 ML18176A1432018-06-27027 June 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5 ML18155A2902018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.5.1.4 Missiles Generated by Natural Phenomena ML18155A2352018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.3 Severe Wind and Extreme Wind (Tornado and Hurricane) Loadings ML18155A2122018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 2.3 Meteorology ML18114A0362018-05-0202 May 2018 Letter - Advanced boiling-Water Reactor Design Certification Renewal Application Safety Evaluation with No Open Items for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection ML18088A2222018-04-10010 April 2018 Letter Safety Evaluation with No Open Items for Section 13.3, Emergency Planning. ML18059A3422018-03-0808 March 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.5.1 Final ML17097A4702018-02-0202 February 2018 GE Hitachi Nuclear Energy - U.S. Advanced Boiling-Water Reactor Design Certification Renewal Application, Closure of Design Items 14, 15, 16, 21, 24 and 25 ML18029A2602018-02-0101 February 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 12 ML18016A1142018-01-30030 January 2018 Approval of Proposed Alternate Reviewing Officials for the General Electric Vallecitos Nuclear Center ML16341A8122016-12-0606 December 2016 GE Hitachi Advanced Boiling Water Reactor Design Certification Renewal Application, Actions Regarding Resolution of Item #26; Fukushima Recommendation 4.2, Mitigating Strategies ML16299A1472016-10-25025 October 2016 GE-Hitachi Nuclear Energy - Supplement 1 to Proposed Resolution of Items #18b, 19 and 20 of NRC Suggested U.S. Advanced Boiling Water Reactor Design Changes 2023-10-04
[Table view] |
Text
GE Hitachi Nuclear Energy Michelle P. Catts Senior Vice President Nuclear Programs 3901 Castle Hayne Road P.O. Box 780 M/C A-18 Wilmington, NC 28402 USA T 910 200-9836 Michelle.Catts@ge.com M200132 Dockets52-001 and 52-045 10 CFR 50.46 10 CFR 50.46(a)(3)(iii) 10 CFR Part 52, Appendix A September 25, 2020 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Subject:
ABWR Design Certification Annual 10 CFR 50.46 Report for 2020 GE Hitachi Nuclear Energy (GEH), as the applicant for the ABWR Design Certification (10 CFR Part 52, Appendix A) and its renewal, submits this annual report under 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Reactors."
Specifically, Enclosure 1 is the 2020 annual report for the ABWR Design Certification for emergency core cooling system (ECCS) evaluation model changes or errors that affect the peak cladding temperature (PCT) calculation.
This annual report identifies changes, errors, and errors in the application of the ECCS-Loss-of-Coolant Accident (LOCA) evaluation model from the date of issuance of the ABWR design certification in 1997 (per 10 CFR Part 52 Appendix A) to September 17, 2020.
Please contact me if you have any questions regarding this information.
Sincerely, Michelle P. Catts Senior Vice President, Nuclear Programs
M200132 Page 2 of 2 September 25, 2020 Commitments: No additional commitments are made.
Enclosure:
- 1. ABWR Design Certification 10 CFR 50.46 Annual Report - 2020 cc: N. Otto, NRC A. Muniz, NRC DBR-0033158 R4
Enclosure 1 M200132 ABWR Design Certification 10 CFR 50.46 Annual Report - 2020
M200132 Page 1 of 2 Advanced Boiling Water Reactor Design Certification 2020 Annual Report Under 10 CFR 50.46(a)(3)(iii)
Emergency Core Cooling System Model Plant Name: Advanced Boiling Water Reactor (ABWR) Design Certification (Docket 52-001; 10 CFR Part 52, Appendix A) and Renewal Application (Docket 52-045)
Utility Name: GE Hitachi (as holder of the final ABWR Design Certification)
Reporting Year: 2020 This ABWR 2020 annual report identifies changes, errors, and errors in the application of the ECCS-LOCA evaluation model from the date of issuance of the ABWR design certification in 1997 (per 10 CFR Part 52 Appendix A) to September 17, 2020.
Evaluation Model: SAFER/GESTR (SAFER03)
Net PCT Absolute LBPCT Effect PCT Effect Analysis of Record Licensing Basis PCT 1,149°F Prior 10 CFR 50.46 Changes or Error Corrections A.
- Previous Years (itemized below)
PCT = + 75°F + 75°F Prior 10 CFR 50.46 Changes or Error Corrections B.
- Recent Year (itemized below):
2019-05 SAFER Lower Limit on Differential
+ 0°F + 0°F Pressure for Bypass Leakage PCT = + 0°F + 0°F Cumulative and Absolute Sum of 10 CFR 50.46 C. PCT = + 75°F + 75°F Changes Projected Licensing Basis PCT Based on These 1,224°F Changes Most Recent Previous Report (2019): Letter, M. P. Catts (GEH) to Document Control Desk (NRC), ABWR Design Certification Annual 10 CFR 50.46 Report for 2019, M190164, October 8, 2019.