2 to Updated Safety Analysis Report, Section 13, Figures 13.1-2 to 13.5-1
ML21307A211
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/28/2021
From:
Energy Harbor Nuclear Corp
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21307A174 List:
References
L-21-018
Download: ML21307A211 (2)


Text

Site Vice President I I General Plant Manager

- Director Site Engineering

- Director Performance Improvement

- Manager Operations - Manager Design - Manager Training Engineering Manager Regulatory

- Manager - Manager Strategic - Compliance and Maintenance Engineering Emergency Response Manager Radiation

- Protection and - Manager Site - Manager Site Projects Protection Chemistry

- Manager Nuclear - Manager Sourcing Work Control (REV. 22 10/2021)

PERRY NUCLEAR POWER PLANT 10 CENTER RD., PERRY, OHIO 44081 ONSITE ORGANIZATIONAL STRUCTURE PERRY NUCLEAR POWER PLANT UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE NO. 13.1-2

.iAn PERRYNUcLEARPowER PLANT affi-"ffi\

w Area Designated as "At Lhe Controls" (Unit I sholvn-Unit 2 similar)

Figure 13.5-1