Similar Documents at Perry |
---|
Category:Letter
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter 2024-09-09
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23303A1342023-10-27027 October 2023 Attachment 1 - Information Removed from the PNPP USAR L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) ML21361A2122021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 5, Figures 5.1-1 to 5.4-21 ML21361A1872021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 12, Radiation Protection (Redacted) ML21361A1882021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML21361A1892021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 9, Figures 9.1-1 to 9.4-29 (Redacted) ML21361A1902021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 9, Figures 9A-1 to 9A-34 (Redacted) ML21361A1912021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML21361A1922021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 3, Figures 3.2-1 to 3B1-1 (Redacted) ML21361A1932021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 02D-1 to 02D-2 ML21361A1942021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 8, Electric Power ML21361A1952021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 2.1-1 to 2.5-46 ML21361A1962021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, List of Figures ML21361A1972021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant Systems and Connected Systems ML21361A1982021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 15, Accident Analysis ML21361A1992021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21361A2002021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 02D-3 to 02E-1 ML21361A2022021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 14, Figures 14.2-1 to 14.2-7 ML21361A2012021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML21361A2032021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 4, Reactor ML21361A2052021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 9, Figures 9.5-1 to 9.5-26 ML21361A2062021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML21361A2072021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 1, Plant Layout (Redacted) ML21361A2082021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 2.5-47 to 2.5-49 ML21361A2092021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML21361A2112021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 10, Figures 10.1-1 to 10.4-3 ML21361A2132021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML21361A2152021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Master Table of Contents ML21361A2162021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 7, Figures 7.2-1 to 7.7-8 ML21361A2182021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features ML21361A2192021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 12, Figures 12.2-1 to 12.6-9 (Redacted) ML21361A2202021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 2, Figures 2.5-50 to 2.5-215 ML21361A2212021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 13, Figures 13.1-2 to 13.5-1 ML21361A2222021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 2, Site Characteristics, Sections 2.0 to 2.4 (Redacted) ML21361A2232021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 6, Figures 6.2-1 to 6.9-1 ML21361A2242021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 8, Figures 8.1-1 to 8.3-23 (Redacted) ML21361A2252021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, List of Effective Pages ML21361A2262021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls Systems ML21361A2272021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 15, Figures 15.0-1 to 15F.3-3 ML21361A2282021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 11, Figures 11.1-1 to 11.5-1 ML21361A2292021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Section 4, Figures 4.2-1 to 4.6-9 L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) ML21307A2082021-10-28028 October 2021 2 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features ML21307A1932021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 9, Figures 9.5-1 to 9.5-26 ML21307A1942021-10-28028 October 2021 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML21307A1952021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 1 - Plant Layout (Redacted) ML21307A1962021-10-28028 October 2021 Submittal of Revision 22 to Updated Safety Analysis Report ML21307A1972021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 2, Figures 2.5-47 to 2.5-49 ML21307A1982021-10-28028 October 2021 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML21307A2002021-10-28028 October 2021 2 to Updated Safety Analysis Report, Section 10, Figures 10.1-1 to 10.4-3 2023-10-27
[Table view] |
Text
I 1111B energy
~ harbor Perry Nuclear Power P/(,lnt IO Center Road.
P.O. Box 97 \\.
- Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear
October 28, 2021 L-21-018 10 CFR 50.71 (e) 10 CFR 50.54(a)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Submittal of the Updated Safety Analysis Report, Revision 22
In accordance with the requirements of 10 CFR 50.71(e), Energy Harbor Nuclear Corporation (EHNC) is hereby submitting to the Nuclear Regulatory Commission (NRC) the Perry Nuclear Power Plant (PNPP) Updated Safety Analysis Report (USAR),
Revision 22, in CD-ROM format. This submittal reflects facility and procedure changes implemented between April 4, 2019 (the end of Refueling Outage 17), and April 8, 2021 (the end of Refueling Outage 18), along w_ith several changes implemented after Refueling Outage 18.
In accordance with 10 CFR 50.4(b)(6); Revision 22 of the PNPP USAR is submitted electronically on a total replacement basis. As required by NRC guidance for electronic submissions, Attachments 1 and 2 provide a listing of the document components that make up the two enclosed CD-ROMs. In addition to the USAR, the first enclosed CD-ROM includes the Technical Specification (TS) Bases, Revision 13, submitted to satisfy TS 5.5.11, "Technical Specifications (TSs) Bases Control Program," which requires submittal of TS Bases changes implemented without prior NRC approval.
The.second enclosed CD-ROM includes the PNPP USAR, and TS Bases with information identified in accordance with NRC Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," removed.
Attachment 3 includes a summary of information removed from the USAR in accordance with Appendix A to Nuclear Energy Institute (NEI) 98-03, "Guidelines for Updating Safety Analysis Reports," Revision 1. J4-0 5 _3
(Vt~
Perry Nuclear Power Plant L-21-018 Page2 includes a summary of regulatory commitment changes to be submitted in accordance with NEI 99 04, "Guidelines for Managing NRC Commitment Changes,"
Revision 0, as endorsed by NRC RIS 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff."
This certifies, to the best of my judgment and belief, that Revision 22 of the PNPP USAR accurately presents changes made since the previous submittal that are necessary to reflect information and analysis submitted to the Commission or pursuant to Commission requirements.
This submittal contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.
Attachments:,
- 1. List of Document Components on CD-ROM 1
- 2. List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)
- 3. Information Removed from the PNPP USAR
- 4. Commitment Change Summary Report
Enclosures:
A. Perry Nuclear Power Plant USAR, and Technical Specification Bases
( on CD-ROM 1)
B. Perry Nuclear Power Plant USAR With Information Identified Per RIS 2015-17 Removed, and Technical Specification Bases (on CD-ROM 2)
cc: NRC Region Ill Administrator (without Enclosure B)
NRC Resident Inspector (without Enclosure B)
NRC Project Manager (without Enclosure B)
Attachment 1 L-21-018
List of Document Components on CD-ROM 1 Page 1 of 2
File Name Size 001 LIST EFF Rev 22.pdf 146 KB 002 Chapter 00.pdf 856 KB 003 Chapter 01.pdf 14,156 KB 004 Chapter 02.0 to 02.4.pdf 14,129 KB 005 Chapter 02.5 to 02E.pdf 38,219 KB 006 Chapter 03.pdf 15,665 KB 007 Chapter 04.pdf 13,526 KB 008 Chapter 05.pdf 13,848 KB 009 Chapter 06.pdf 14,278 KB 010 Chapter 07.pdf 13,909 KB 011 Chapter 08.pdf 13,660 KB 012 Chapter 09.pdf 15,450 KB 013 Chapter 1 0.pdf 13,523 KB 014 Chapter 11.pdf 13,800 KB 015 Chapter 12.pdf 13,771 KB 016 Chapter 13.pdf 13,386 KB 017 Chapter 14.pdf 13,763 KB 018 Chapter 15.pdf 14,723 KB 019 Chapter 16.pdf 57 KB 020 Chapter 17.pdf 72 KB 021 FIG_LIST Rev 22.pdf 211 KB 022 Figures Section 01.pdf 17,285 KB 023 Figures Section 02 (2.1-1 to 2.5-46).pdf 28,300 KB 024 Figures Section 02 (2.5-47 to 2.5-49).pdf 20,215 KB 025 Figures Section 02 (2.5-50 to 2.5-215).pdf 26,172 KB 026 Figures Section 02D-1 to 02D-2.pdf 19,648 KB 027 Figures Section 02D-3 to 02E-1.pdf 32,280 KB L-21-018 Page 2 of 2
File Name Size 028 Figures Section 03.pdf 39,005 KB 029 Figures Section 04.pdf 1,560 KB 030 Figures Section 05.pdf 4,989 KB 031 Figures Section 06.pdf 7,730 KB 032 Figures Section 07.pdf 10,280 KB 033 Figures Section 08.pdf 3,142 KB 034 Figures Section 09 (9.1-1 to 9.4-29).pdf 19,597 KB 035 Figures Section 09 (9.5-1 to 9.5-26).pdf 4,324 KB 036 Figures Section 09 (9A-1 to 9A-34).pdf 9,790 KB 037 Figures Section 1 0.pdf 16,875 KB 038 Figures Section 11.pdf 2,660 KB 039 Figures Section 12.pdf 18,237 KB 040 Figures Section 13.pdf 145 KB 041 Figures Section 14.pdf 241 KB 042 Figures Section 15.pdf 5,587 KB 043 PNPP TS Bases Rev 13.pdf 955 KB Attachment 2 L-21-018
List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)
Page 1 of 2
File Name Size 001 LIST _EFF Rev 22.pdf 121 KB 002 Chapter 00.pdf 1,008 KB 003 Chapter 01.pdf 14,156 KB 004 Chapter 02.0 to 02.4.pdf 14,129 KB 005 Chapter 02.5 to 02E.pdf 38,219 KB 006 Chapter 03.pdf 15,665 KB 007 Chapter 04.pdf 13,526 KB 008 Chapter 05.pdf 13,848 KB 009 Chapter 06.pdf 14,278 KB 010 Chapter 07.pdf 13,909 KB 011 Chapter 08.pdf 13,660 KB 012 Chapter 09.pdf. 15,450 KB 013 Chapter 1 0.pdf 13,523 KB 014 Chapter 11.pdf 13,800 KB 015 Chapter 12.pdf 13,771 KB 016 Chapter 13.pdf 13,386 KB 017 Chapter 14.pdf 13,763 KB 018 Chapter 15.pdf 14,723 KB 019 Chapter 16.pdf 57 KB 020 Chapter 17.pdf 72 KB 021 FIG_LIST Rev 22.pdf 211 KB 022 Figures Section 01.pdf 5,433 KB 023 Figures Section 02 (2.1-1 to 2.5-46).pdf 28,300 KB 024 Figures Section 02 (2.5-47 to 2.5-49).pdf 20,215 KB 025 Figures Section 02 (2.5-50 to 2.5-215).pdf 26,171 KB 026 Figures Section 02D-1 to 02D-2.pdf 19,648 KB 027 Figures Section 02D-3 to 02E-1.pdf 32,280 KB L-21-018 Page 2 of 2
File Name Size 028 Figures Section 03.pdf 27,846 KB 029 Figures Section 04.pdf 1,560 KB 030 Figures Section 05.pdf 4,989 KB 031 Figures Section 06.pdf 7,540 KB 032 Figures Section 07.pdf 10,280 KB 033 Figures Section 08.pdf 2,746 KB 034 Figures Section 09 (9.1-1 to 9.4-29).pdf 18,370 KB 035 Figures Section 09 (9.5-1 to 9.5-26).pdf 4,324 KB 036 Figures Section 09 (9A-1 to 9A-34).pdf 616 KB 037 Figures Section 1 0.pdf 16,875 KB 038 Figures Section 11.pdf 2,660 KB 039 Figures Section 12.pdf 1,968 KB 040 Figures Section 13.pdf 145 KB 041 Figures Section 14.pdf 241 KB 042 Figures Section 15.pdf 5,587 KB 043 PNPP TS Bases Rev 13.pdf 955 KB Attachment 3 L-21-018
Information Removed from the PNPP USAR Page 1 of 1
In accordance with Nuclear Energy Institute (NEI) 98-03, Revision 1, "Guidelines for Updating Safety Analysis Reports," licensees periodically report a brief description of information removed from the Updated Safety Analysis Report (USAR) and the basis for its removal. The following provides a summary of the information removed from the PNPP USAR and the basis for removal.
- 1. The acronym "FENOC" was removed throughout the USAR for occasions that referred to the FENOC Quality Assurance Program Manual (QAPM) or other
- programs such as the corrective action program. These programs are company programs required by regulations. Rewording from "FENOC" to "company" is simply rewording text without changing the scope, meaning, or level of detail.
Letters, programs, and manuals that previously included FENOC are now referred to as "company." Where appropriate, when referring to the specific name, "FENOC" was replaced with "Energy Harbor Nuclear Corp." and "FirstEnergy" was replaced with "Energy Harbor Corp." Section 4.5.1.4.1 contained information relative to General Electric engineering representation that is beyond the level of necessary detail and is not important to providing and understanding the plant's design and operation from either a general or system functional perspective.
- 2. Removed obsolete information from Section 13.1.1.2, Table 13.1-1, and Figure 13.1-2 related to the Perry Engineering Organization. The Manager, Technical Services Engineering, and Manager, Plant Engineering, are obsolete position titles that no longer reflect the current organization. These positions have been consolidated into one position, Manager, Strategic Engineering. The responsibilities assigned to the engineering organization have not changed but have been rearranged to reflect the current organizational structure. Section 13.1.1.2 contained descriptive information that is not important to providing and understanding the plant's design and operation from either a general or system functional perspective.
Attachment 4 L-21-018
Commitment Change Summary Report Page 1 of 1
COMMITMENT COMMITMENT NUMBER/SOURCE/DATE DESCRIPTION CHANGE REASON FOR CHANGE
PY-L02090 A current special pressure Closed. The subject transmitters associated with PY-CEI/NRR-1861 L, 9/20/1994 transient check, which would this commitment have been replaced with NRG BL 90-01, Supplement 1, identify transmitter failure due those that are not susceptible to the failure 12/22/1992 to loss of sensor fill-oil, will mechanism (loss of fill-oil) identified in remain in calibration NRG BL 90-01, Supplement 1. As procedures after the enhanced replacement of the transmitters with a non 24 month monitoring program susceptible transmitter was the alternative is completed. to maintaining an enhanced surveillance program per BL 90-01, Supplement 1, the commitment is no longer applicable.
List of Abbreviations Used:
BL Bulletin NRG Nuclear Regulatory Commission