I 1111B energy

~ harbor Perry Nuclear Power P/(,lnt IO Center Road .

P.O. Box 97 \.

  • Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear October 28, 2021 L-21-018 10 CFR 50.71 (e) 10 CFR 50.54(a)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Submittal of the Updated Safety Analysis Report, Revision 22 In accordance with the requirements of 10 CFR 50.71(e), Energy Harbor Nuclear Corporation (EHNC) is hereby submitting to the Nuclear Regulatory Commission (NRC) the Perry Nuclear Power Plant (PNPP) Updated Safety Analysis Report (USAR),

Revision 22, in CD-ROM format. This submittal reflects facility and procedure changes implemented between April 4, 2019 (the end of Refueling Outage 17), and April 8, 2021 (the end of Refueling Outage 18), along w_ith several changes implemented after Refueling Outage 18.

In accordance with 10 CFR 50.4(b)(6); Revision 22 of the PNPP USAR is submitted electronically on a total replacement basis. As required by NRC guidance for electronic submissions, Attachments 1 and 2 provide a listing of the document components that make up the two enclosed CD-ROMs. In addition to the USAR, the first enclosed CD-ROM includes the Technical Specification (TS) Bases, Revision 13, submitted to satisfy TS 5.5.11, "Technical Specifications (TSs) Bases Control Program," which requires submittal of TS Bases changes implemented without prior NRC approval.

The.second enclosed CD-ROM includes the PNPP USAR, and TS Bases with information identified in accordance with NRC Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents," removed. includes a summary of information removed from the USAR in J4-0 5 _3 accordance with Appendix A to Nuclear Energy Institute (NEI) 98-03, "Guidelines for Updating Safety Analysis Reports," Revision 1.

(Vt~

Perry Nuclear Power Plant L-21-018 Page2 includes a summary of regulatory commitment changes to be submitted in accordance with NEI 99 04, "Guidelines for Managing NRC Commitment Changes,"

Revision 0, as endorsed by NRC RIS 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff."

This certifies, to the best of my judgment and belief, that Revision 22 of the PNPP USAR accurately presents changes made since the previous submittal that are necessary to reflect information and analysis submitted to the Commission or pursuant to Commission requirements.

This submittal contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.

Attachments: ,

1. List of Document Components on CD-ROM 1
2. List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)
3. Information Removed from the PNPP USAR
4. Commitment Change Summary Report

Enclosures:

A. Perry Nuclear Power Plant USAR, and Technical Specification Bases (on CD-ROM 1)

B. Perry Nuclear Power Plant USAR With Information Identified Per RIS 2015-17 Removed, and Technical Specification Bases (on CD-ROM 2) cc: NRC Region Ill Administrator (without Enclosure B)

NRC Resident Inspector (without Enclosure B)

NRC Project Manager (without Enclosure B)

Attachment 1 L-21-018 List of Document Components on CD-ROM 1 Page 1 of 2 File Name Size 001 LIST EFF Rev 22.pdf 146 KB 002 Chapter 00.pdf 856 KB 003 Chapter 01.pdf 14,156 KB 004 Chapter 02.0 to 02.4.pdf 14,129 KB 005 Chapter 02.5 to 02E.pdf 38,219 KB 006 Chapter 03.pdf 15,665 KB 007 Chapter 04.pdf 13,526 KB 008 Chapter 05.pdf 13,848 KB 009 Chapter 06.pdf 14,278 KB 010 Chapter 07.pdf 13,909 KB 011 Chapter 08.pdf 13,660 KB 012 Chapter 09.pdf 15,450 KB 013 Chapter 10.pdf 13,523 KB 014 Chapter 11.pdf 13,800 KB 015 Chapter 12.pdf 13,771 KB 016 Chapter 13.pdf 13,386 KB 017 Chapter 14.pdf 13,763 KB 018 Chapter 15.pdf 14,723 KB 019 Chapter 16.pdf 57 KB 020 Chapter 17 .pdf 72 KB 021 FIG_LIST Rev 22.pdf 211 KB 022 Figures Section 01.pdf 17,285 KB 023 Figures Section 02 (2.1-1 to 2.5-46).pdf 28,300 KB 024 Figures Section 02 (2.5-47 to 2.5-49).pdf 20,215 KB 025 Figures Section 02 (2.5-50 to 2.5-215).pdf 26,172 KB 026 Figures Section 02D-1 to 02D-2.pdf 19,648 KB 027 Figures Section 02D-3 to 02E-1.pdf 32,280 KB L-21-018 Page 2 of 2 File Name Size 028 Figures Section 03.pdf 39,005 KB 029 Figures Section 04.pdf 1,560 KB 030 Figures Section 05.pdf 4,989 KB 031 Figures Section 06.pdf 7,730 KB 032 Figures Section 07.pdf 10,280 KB 033 Figures Section 08.pdf 3,142 KB 034 Figures Section 09 (9.1-1 to 9.4-29).pdf 19,597 KB 035 Figures Section 09 (9.5-1 to 9.5-26).pdf 4,324 KB 036 Figures Section 09 (9A-1 to 9A-34).pdf 9,790 KB 037 Figures Section 10.pdf 16,875 KB 038 Figures Section 11.pdf 2,660 KB 039 Figures Section 12.pdf 18,237 KB 040 Figures Section 13.pdf 145 KB 041 Figures Section 14.pdf 241 KB 042 Figures Section 15.pdf 5,587 KB 043 PNPP TS Bases Rev 13.pdf 955 KB

Attachment 2 L-21-018 List of Document Components on CD-ROM 2 (Information Identified Per RIS 2015-17 Removed)

Page 1 of 2 File Name Size 001 LIST_EFF Rev 22.pdf 121 KB 002 Chapter 00.pdf 1,008 KB 003 Chapter 01.pdf 14,156 KB 004 Chapter 02.0 to 02.4.pdf 14,129 KB 005 Chapter 02.5 to 02E.pdf 38,219 KB 006 Chapter 03.pdf 15,665 KB 007 Chapter 04.pdf 13,526 KB 008 Chapter 05.pdf 13,848 KB 009 Chapter 06.pdf 14,278 KB 010 Chapter 07.pdf 13,909 KB 011 Chapter 08.pdf 13,660 KB 012 Chapter 09.pdf . 15,450 KB 013 Chapter 10.pdf 13,523 KB 014 Chapter 11.pdf 13,800 KB 015 Chapter 12.pdf 13,771 KB 016 Chapter 13.pdf 13,386 KB 017 Chapter 14.pdf 13,763 KB 018 Chapter 15.pdf 14,723 KB 019 Chapter 16.pdf 57 KB 020 Chapter 17.pdf 72 KB 021 FIG_LIST Rev 22.pdf 211 KB 022 Figures Section 01.pdf 5,433 KB 023 Figures Section 02 (2.1-1 to 2.5-46).pdf 28,300 KB 024 Figures Section 02 (2.5-47 to 2.5-49).pdf 20,215 KB 025 Figures Section 02 (2.5-50 to 2.5-215).pdf 26,171 KB 026 Figures Section 02D-1 to 02D-2.pdf 19,648 KB 027 Figures Section 02D-3 to 02E-1.pdf 32,280 KB L-21-018 Page 2 of 2 File Name Size 028 Figures Section 03.pdf 27,846 KB 029 Figures Section 04.pdf 1,560 KB 030 Figures Section 05.pdf 4,989 KB 031 Figures Section 06.pdf 7,540 KB 032 Figures Section 07.pdf 10,280 KB 033 Figures Section 08.pdf 2,746 KB 034 Figures Section 09 (9.1-1 to 9.4-29).pdf 18,370 KB 035 Figures Section 09 (9.5-1 to 9.5-26).pdf 4,324 KB 036 Figures Section 09 (9A-1 to 9A-34).pdf 616 KB 037 Figures Section 10.pdf 16,875 KB 038 Figures Section 11.pdf 2,660 KB 039 Figures Section 12.pdf 1,968 KB 040 Figures Section 13.pdf 145 KB 041 Figures Section 14.pdf 241 KB 042 Figures Section 15.pdf 5,587 KB 043 PNPP TS Bases Rev 13.pdf 955 KB

Attachment 3 L-21-018 Information Removed from the PNPP USAR Page 1 of 1 In accordance with Nuclear Energy Institute (NEI) 98-03, Revision 1, "Guidelines for Updating Safety Analysis Reports," licensees periodically report a brief description of information removed from the Updated Safety Analysis Report (USAR) and the basis for its removal. The following provides a summary of the information removed from the PNPP USAR and the basis for removal.

1. The acronym "FENOC" was removed throughout the USAR for occasions that referred to the FENOC Quality Assurance Program Manual (QAPM) or other
  • programs such as the corrective action program. These programs are company programs required by regulations. Rewording from "FENOC" to "company" is simply rewording text without changing the scope, meaning, or level of detail.

Letters, programs, and manuals that previously included FENOC are now referred to as "company." Where appropriate, when referring to the specific name, "FENOC" was replaced with "Energy Harbor Nuclear Corp." and "FirstEnergy" was replaced with "Energy Harbor Corp." Section 4.5.1.4.1 contained information relative to General Electric engineering representation that is beyond the level of necessary detail and is not important to providing and understanding the plant's design and operation from either a general or system functional perspective.

2. Removed obsolete information from Section 13.1.1.2, Table 13.1-1, and Figure 13.1-2 related to the Perry Engineering Organization. The Manager, Technical Services Engineering, and Manager, Plant Engineering, are obsolete position titles that no longer reflect the current organization. These positions have been consolidated into one position, Manager, Strategic Engineering. The responsibilities assigned to the engineering organization have not changed but have been rearranged to reflect the current organizational structure. Section 13.1.1.2 contained descriptive information that is not important to providing and understanding the plant's design and operation from either a general or system functional perspective.

Attachment 4 L-21-018 Commitment Change Summary Report Page 1 of 1 COMMITMENT COMMITMENT NUMBER/SOURCE/DATE DESCRIPTION CHANGE REASON FOR CHANGE PY-L02090 A current special pressure Closed. The subject transmitters associated with PY-CEI/NRR-1861 L, 9/20/1994 transient check, which would this commitment have been replaced with NRG BL 90-01, Supplement 1, identify transmitter failure due those that are not susceptible to the failure 12/22/1992 to loss of sensor fill-oil, will mechanism (loss of fill-oil) identified in remain in calibration NRG BL 90-01, Supplement 1. As procedures after the enhanced replacement of the transmitters with a non-24 month monitoring program susceptible transmitter was the alternative is completed. to maintaining an enhanced surveillance program per BL 90-01, Supplement 1, the commitment is no longer applicable.

List of Abbreviations Used:

BL Bulletin NRG Nuclear Regulatory Commission