ML21307A211

From kanterella
Jump to navigation Jump to search
2 to Updated Safety Analysis Report, Section 13, Figures 13.1-2 to 13.5-1
ML21307A211
Person / Time
Site: Perry 
Issue date: 10/28/2021
From:
Energy Harbor Nuclear Corp
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21307A174 List:
References
L-21-018
Download: ML21307A211 (2)


Text

I General Plant -

Manager Manager Operations Manager Maintenance Manager Radiation Protection and Chemistry Manager Nuclear Work Control Site Vice President I

Director Performance Director Site Engineering Manager Design Engineering Manager Strategic Engineering Manager Site Projects Improvement Manager Training Manager Regulatory Compliance and Emergency Response Manager Site Protection Manager Sourcing (REV. 22 10/2021)

PERRY NUCLEAR POWER PLANT 10 CENTER RD., PERRY, OHIO 44081 ONSITE ORGANIZATIONAL STRUCTURE PERRY NUCLEAR POWER PLANT UPDATED FINAL SAFETY ANALYSIS REPORT FIGURE NO. 13.1-2

.iAn affi-"ffi\\

PERRY NUcLEAR PowER PLANT w

A r e a D e s i g n a t e d a s " A t L h e C o n t r o l s "

( U n i t I s h o l v n -

U n i t 2 s i m i l a r )

F i g u r e 1 3. 5 - 1