ML21036A317

From kanterella
Revision as of 20:22, 20 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Southern Nuclear Operating Company Vogtle Electric Generating Plant, Units 3 and 4 - U.S. Nuclear Regulatory Commission Security Baseline Inspection Report 05200025/2019411 and 05200026/2019411
ML21036A317
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/13/2020
From: Bradley Davis
NRC/RGN-II
To: Yox M
Southern Nuclear Operating Co
References
IR 2019411
Download: ML21036A317 (3)


Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION February 13, 2020 Mr. Michael Yox Regulatory Affairs Director Southern Nuclear Operating Company Vogtle 3 & 4 7835 River Road, Bldg. 140 Waynesboro, GA 30830

SUBJECT:

SOUTHERN NUCLEAR OPERATING COMPANY VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY BASELINE INSPECTION REPORT 05200025/2019411 AND 05200026/2019411 (OUO)

Dear Mr. Yox:

On December 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 3 & 4. The enclosed inspection report documents the inspection results, which the inspectors discussed on January 16, 2020 with Mr.

M. Page and Mr. P. Martino, Vogtle 3&4 Plant Managers, and other licensee and contractor staff members.

The inspection examined a sample of construction activities conducted under your Combined License (COL) as it relates to safety and compliance with the Commissions rules and regulations and with the conditions of these documents. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholdings, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d) (1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION M. Yox If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Bradley Davis, Chief Construction Inspection Branch 2 Division of Construction Oversight Docket Nos.: 5200025, 5200026 License Nos: NPF-91, NPF-92

Enclosure:

NRC Inspection Report (IR) 05200025/2019411, 05200026/2019411 w/attachment: Supplemental Information cc w/encl: (See next page)

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

ML21036A317 Publicly Available Non-Publicly Available Sensitive Non-Sensitive SUNSI Review Complete xForm 665 Attached OFFICE RII: DCO RII: DCO RII: DRS NSIR: DSO NSIR: DSO RII: DRS RII: DCO RII:DCO SIGNATURE NAME B. Kemker N. Karlovich R. Patterson F. Sullivan S. Prasad J. Shehee C. Even B. Davis DATE 2/4/2020 2/7/2020 2/4/2020 2/10/2020 2/4/2020 2/4/2020 2/12/2020 2/13/2020 E-MAIL YES NO YES NO YES NO YES NO YES NO YES NO YES NO YES NO COPY?