ML21286A739

From kanterella
Revision as of 12:57, 20 January 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Comment (3) of John Surr on Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.1 and 2
ML21286A739
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/07/2021
From: Surr J
- No Known Affiliation
To:
Office of Administration
References
86FR47525 00003, NRC-2020-0234
Download: ML21286A739 (1)


Text

10/13/21, 1:32 PM blob:https://www.fdms.gov/b9958a06-37c0-47ba-8cf5-eaf0e5668fd8 SUNI Review Complete Template=ADM-013 As of: 10/13/21 1:29 PM E-RIDS=ADM-03 Received: October 07, 2021 PUBLIC SUBMISSION ADD: Tam Tran, Sandra Status: Pending_Post Figueroa, Mary Neely Tracking No. kuh-j7ea-vi0q Comment (3)

Publication Date: Comments Due: October 12, 2021 8/25/2021 CITATION 86 FR 47525 Submission Type: Web Docket: NRC-2020-0234 Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Comment On: NRC-2020-0234-0144 Virginia Electric and Power Company; Dominion Energy Virginia; North Anna Power Station, Unit Nos.

1 and 2 Document: NRC-2020-0234-DRAFT-0145 Comment on FR Doc # 2021-18255 Submitter Information Name: John Surr Address:

Charlottesville,, VA, 22911-8720 Email: jvsurr@gmail.com Phone: 4349722854 General Comment I want a complete review of the environmental and safety issues by October 12.

The NRC should require a new Environmental Impact Statement which includes a thorough examination of geologic risks. (This has not been done since the 2011 earthquake.)

A new assessment of Severe Accident Mitigation Alternatives (SAMA) should be conducted by Dominion. (The last SAMA occurred in 2001.)

Harvesting and testing of components of the North Anna reactors to determine if they can operate safely for 80 years.

A new assessment of the structural integrity of the Lake Anna damn which holds the water for cooling the reactors.

An updated plan for the safe storage of the increasing radioactive waste stored at the power station.

A full public hearing on the license application should be provided.

blob:https://www.fdms.gov/b9958a06-37c0-47ba-8cf5-eaf0e5668fd8 1/1