ML21334A278

From kanterella
Revision as of 21:26, 14 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation, Submittal of Annual Financial Reports 2020
ML21334A278
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/19/2021
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML21334A277 List:
References
102-08358-TNW/MSC
Download: ML21334A278 (2)


Text

10 CFR 50.71(b) 10 CFR 72.80(b)

Palo Verde Nuclear Generating Station 5871 S. Wintersburg Road 102-08358-TNW/MSC Tonopah, AZ 85354 November 19, 2021 Mail Station 7636 Tel: 623.393-5764 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station Units 1, 2, and 3 and Independent Spent Fuel Storage Installation Docket Numbers STN 50-528/529/530 and 72-44 Submittal of Annual Financial Reports 2020 Pursuant to 10 CFR 50.71(b) and 10 CFR 72.80(b), enclosed please find the 2020 Annual Financial Reports for three Participants who jointly own Palo Verde Nuclear Generating Station (PVNGS) and do not file a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission. These Participants are Los Angeles Department of Water and Power, Salt River Project Agricultural Improvement and Power District, and Southern California Public Power Authority.

The remaining Participants who jointly own PVNGS file a Form 10-Q with the Securities and Exchange Commission or a Form 1 with the Federal Energy Regulatory Commission and therefore Arizona Public Service Company is not required to file their Annual Financial Reports in accordance with 10 CFR 50.71(b) or 10 CFR 72.80(b). These Participants are Arizona Public Service Company, Southern California Edison Company, El Paso Electric Company, and Public Service Company of New Mexico. No commitments are being made to the Nuclear Regulatory Commission (NRC) by this letter.

Should you need further information regarding this submittal, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.

Sincerely, Weber, Thomas Digitally signed by Weber, Thomas N(Z00499)

Date: 2021.11.19 13:15:41 N(Z00499) -07'00' Thomas N. Weber Department Director, Regulatory Affairs TNW/MSC/mg

Enclosure:

Palo Verde Nuclear Generating Station 2020 Annual Financial Reports cc: S. A. Morris NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure Palo Verde Nuclear Generating Station 2020 Annual Financial Reports - Los Angeles Department of Water and Power - Salt River Project Agricultural Improvement and Power District - Southern Public Power Authority